• Title/Summary/Keyword: Dam operation

Search Result 398, Processing Time 0.03 seconds

Evaluation of instream flow in Han river according to the Imnam dam operation in North Korea (북한 임남댐 운영에 따른 북한강 하천유지유량 평가)

  • Lee, Jae-Kyoung;Jang, Suk Hwan;Ihm, Nam-Jae
    • Journal of Korea Water Resources Association
    • /
    • v.53 no.1
    • /
    • pp.71-82
    • /
    • 2020
  • The objective of this study is to evaluate the instream flow in the North Han River basin according to the operation of Imnam Dam in North Korea. The water budget and instream flow satisfaction were analyzed using hourly, daily and monthly data of Water Management Information System (WAMIS) from Jan. 1991 to Dec. 2018. As a analysis result of water budget using hourly data in the North Han River basin, although inflows compared with dam release in the upstream basin of Peace Dam-Hwacheon Dam and Chuncheon Dam-Soyanggang Dam-Uiam Dam were calculated as negative values, the reasonable results using daily and monthly average data were estimated. It showed that the results of water budget analysis of dam inflow and total release may be different by time units of data. The monthly average inflow of Hwacheon Dam decreased significantly after the construction in 2003 of Imnam Dam, which confirmed that the operation of Imnam Dam had a significant effect on the dams in the North Han River basin. The operation of Imnam Dam is one of the main reasons for the lack of instream flow and total shortage amounts and shortage period increased up to +330% due to the decrease in inflow and total release of dams in the North Han River water after the operation of Imnam Dam. It is necessary to study various plans to secure instream flow including transboundary river management

Removal of Inclusions in molten Steel by Filter Dam (필터댐에 의한 강중 개재물 저감효과)

  • 조문규;이석근;정두화;남수희;이재우
    • Journal of the Korean Ceramic Society
    • /
    • v.35 no.2
    • /
    • pp.201-207
    • /
    • 1998
  • A tube-type filter dam(or baffle with holes) for ferrous melt refining is applied to the tundish operation for molten steel having low carbon and ultra-low carbon. The changes in the total oxygen content insoluble aluminum content and the distribution of inclusion size in molten steel during tundish operation were in-vestigated at the pouring part strand and mold of tundish. Removal mechanism of inclusions is considered to be caused by buoyancy action of the filter dam better than filtration action and the size range of in-clusions filtrated by the filter dam was for 30-50$\mu\textrm{m}$. Decrease in deviation of inclusion content in molten steel was confirmed for appling the filter dam in comparison with using conventional dam and weir. Also the filter dam had the advantage of baffle with holes at lower part in the efficiency of inclusions removal.

  • PDF

Multipurpose Dam Operation Models for Flood Control Using Fuzzy Control Technique ( I ) - Development of Single Dam Operation Models - (퍼지제어모형을 이용한 다목적 댐의 홍수조절모형( I ) - 단일댐의 운영모형 개발 -)

  • Shim, Jae-Hyun;Kim, Ji-Tae;Heo, Jun-Haeng;Kim, Jin-Young
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.4 no.1 s.12
    • /
    • pp.33-40
    • /
    • 2004
  • The objective of this study is to develop single dam operation models for flood control using Fuzzy control technique, which can improve flood controllability. We set control rules by water level and inflow, and developed three models Fuzzy I, II, III according to rule to decide outflow. Fuzzy I model consists of six rules considering only flood control and Fuzzy II model considers the effect of water use by increasing water level at the end of flood control period as well as flood control during the same period. Finally, Fuzzy m is an adaptive model designed to perform multipurpose dam operation for both flood control and water use simultaneously based on a control rules.

The optimal operation of reservoir systems during flood season (홍수기 저수지의 최적연계운영)

  • Han, Kun-Yeun;Choi, Hyun-Gu;Kim, Dong-Il;Lee, Kyeong-Teak
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.743-746
    • /
    • 2008
  • Recently, due to the effect of global warming and extreme rainfall, the magnitude of flood disaster and the frequency of flood is rapidly increasing. In order to mitigate the damage of human and property from this kind of meteorological phenomenon and manage water resources scientifically, effective operation of dam and reservoir is very important. In case of Andong dam which was not performed a flood control function needs to develop new types of dam safety management measure because of recent extraordinary flood by typhoons. In case of Andong dam and Imha dam, I am using HEC-5 model in order to apply reservoir simulation. In this case, complex conditions among 100-year floods , 200-year floods and PMF was used. Also, I modified the maximum outflow 3,800m3/s into 3,490m3/s and applied this modified discharge in order to secure freeboard in the downstream. In an analysis that I applied modified outflow by 100-year floods and 200-year floods to, the result showed that river didn't overflow in Andong area but some other places have relatively low freeboard. In the cases that I modified maximum outflow, results showed that freeboard of levee is larger than existed simulation. In the simulation that I applied 200-year floods and PMF to and under a condition connected with PMF, results showed overflowing the levees. Because of the difference between the frequency of dam outflow and the design flood in river, it is required to improve the existed flood plan in the downstream of Andong dam. As a result of this study, the optimal operation of reservoir systems can be proposed to mitigate the flood damage in the downstream of Andong dam and also can be used to establish the flood plans.

  • PDF

A Study of Adoption on the Concept of Monthly Probable Maximum Precipitation (월 PMP 개념의 적용에 관한 연구)

  • Choi, Han-Kyu;Kim, Nam-Won;Choi, Yong-Mook;Yoon, Hee-Sub
    • Journal of Industrial Technology
    • /
    • v.21 no.B
    • /
    • pp.241-248
    • /
    • 2001
  • Normally at a flood season the operation of the dam depends on a short range weather forecast that makes many difficulties of the management at a dry season. It is needed to study the pattern of the long period rainfall. The concept of PMP(Probable Maximum Precipitation) was used for designing dam. From the concept, this study is applied the concept of monthly probable maximum precipitation for operating dam. It can be possible to let us know the appropriateness of a limiting water level at a rainy season. For the operation of dam at a dry season this study can predict roughly the flood season's pattern of precipitation by month or period, therfore the prediction of precipitation can rise efficient operation of a dam.

  • PDF

Development of Reservoir Operation Model using Simulation Technique in Flood Season (I) (모의기법에 의한 홍수기 저수지 운영 모형 개발 (I))

  • Sin, Yong-No;Maeng, Seung-Jin;Go, Ik-Hwan;Lee, Hwan-Gi
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.6
    • /
    • pp.745-755
    • /
    • 2000
  • The dam operation system of KOWACO for flood control doesn't have capability to account for the downstream hydrologic conditions and any feasible index to decide the pre-release from the forecasted rainfall and inflow. In this study, a dam operation model for flood control was developed to account for the flood flow condition of its downstream to give users the dam release schedules. Application test of EV ROM to Keum River showed that EV ROM is superior to the Rigid ROM and Technical ROM which are currently used by KOWACO. EV ROM developed in this study provides a release schedule accounting for the cumulative lateral flow hydrograph at the downstream control points where the discharge does not depend only on the dam operation. but also on lateral inflow from the tributaries. In order to reduce the peak discharge at the control points, it suggests the preliminary release during the early rising phase of the predicted hydrograph, holding the flood flow inside the dam during a peak phase, and afterward resuming the release. Three case studies of flood control by the operation of Daechung Multipurpose Dam in Geum River Basin show that the EV ROM is superior to the Rigid ROM and Technical ROM. This must be due to its nature to account for the downstream flow condition as well as the inflow and water level of the dam. It was also conceived that further case studies of EV ROM and more accurate rainfall prediction would improve the dam operation for flood control.ontrol.

  • PDF

A Study on the Optimal Operation and Policy of the Boryeong Dam Diverion Pipe Line Using the SWAT Model (SWAT 모형을 이용한 보령댐 도수로 운영 방안 및 정책 연구)

  • Park, Bumsoo;Yoon, Hyo Jik;Hong, Yong Seok;Kim, Sung Pyo
    • Journal of Korean Society on Water Environment
    • /
    • v.36 no.6
    • /
    • pp.546-558
    • /
    • 2020
  • While industrialization has provided in abundance, the pollution it creates has caused untold damage to the environment, increasing the frequency and severity of natural disasters through changes in global climate patterns. The World Risk Forum's (WEF) World Risk Report presented the results of a survey of experts from around the world detailing the most influential risk factors over the next decade. Notably, the failure to respond to climate change ranked first and the global water crisis third. The extreme drought in the western Chungnam province was unexpected in 2016. At the time, the water level of Boryeong Dam was drastically decreased due to receiving less than half the average recorded rainfall in the region that year. The Boryeong Dam diversion pipeline has the capacity to solve the water shortage problem between these two regions by providing water from Geumgang to the western part of Chungnam, including Boryeong City. Current weather trends suggest drought is likely to continue in western Chungnam, which uses the Boryeong Dam as an intake source. This makes it necessary to operate Boryeong Dam diversion pipeline in an efficient and effective manner. SWAT is a watershed scale model developed to predict the impact of land management practices on water. The SWAT model was used in this study to evaluate the adequacy of the Boryeong Dam diversion pipeline operational plan by comparing it to present Boryeong Dam diversion pipeline operation. By investigating the number of days required to reach each reservoir stage, we determined that the number of days required to reach the boundary stage was less than that of the current operation. This determination accounts for the caveats that the Boryeong Dam waterway was not operated and only one pump will be operated from October to May of next year. As our results suggest, the most stable operation scenario is to operate two pumps at all times. This can be accomplished by operating two pumps from the caution stage to increase the number of pumps whenever the stage is raised. In addition to the stable operation of the Boryeong Dam pipeline, policy considerations are required with regard to imposing a water use charge on users of the Boryeong Dam region.

Evaluation of Resistance of Concrete-Face Rockfill Dam to Seismic Loading Using Shaking Table Test (진동대시험을 이용한 콘크리트 표면 차수벽형 석괴댐의 내진성능 평가)

  • Ha, Ik-Soo;Kim, Yong-Seong;Seo, Min-Woo;Park, Dong-Soon
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.1118-1125
    • /
    • 2005
  • In this study, seismic safety of CFRD(Concrete-Face Rockfill Dam) type "D" dam in operation is evaluated from the results of 1-g shaking table test using similitude laws. Model dam is made by similitude law considering the grain size of prototype dam component. After the model dam is impounded to the normal water level(N.W.L), it is excited by artificial earthquake wave corresponding to standard design respond spectrum of the "D" dam site. Displacement response behavior of the dam is examined through the measurement of vertical and horizontal displacement of dam crest. Also, amplification characteristics of acceleration with dam height is examined through the measurement of acceleration with dam height. Finally, the purpose of this study is to evaluate seismic safety of "D" dam in operation. From the results of acceleration measurement, it was found that acceleration of dam crest was amplified about 1.52 times compared to the acceleration of dam bottom and amplification phenomenon is outstanding at three quarters of dam height from the bottom of dam. From the analysis of displacement behavior, it was estimated that vertical displacement of prototype dam is 6.8cm (0.1% of dam height) and horizontal displacement 12.3cm(0.2% of dam height). These percentages is much lower than 1% of dam height(general stability criteria). Therefore, it was concluded that seismic stability of "D" dam against an estimated earthquake is guaranteed.

  • PDF

Simulation for the Optimal Operation of Soyanggang Dam and Hwachon Dam in the Flood Periods (홍수시(洪水時) 소양강(昭陽江)댐 및 화천(華川)댐의 최적운영(最適運營)을 위한 시뮬레이션)

  • Lee, Kil Seong;Jun, Kyung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.6 no.1
    • /
    • pp.13-24
    • /
    • 1986
  • A real-time hourly operation model for the flood control of Soyanggang Dam and Hwachon Dam, which are located in the North Han River is developed. The method is based on simulation with a feedforward-feedback control. The feedforward control was mainly concerned with providing the release history from the single dams. The outflows from the single dam operation rules with forecasted inflows were used as the inputs to simulation. And then feedback control is applied to reduce the peak discharge at the junction. Also, sensitivity analysis of the operation model was provided to respect the temporal and spatial distribution of storms to the model.

  • PDF

Economic Analysis of Dam Operation Improvement by Dam Downstream River Improvement Works (II)-Economic Benefit and Cost Allocation Analysis (댐하류하천정비사업의 댐 운영개선 효과 경제성 분석 (II) -경제적 편익 및 비용분담률 분석)

  • Yoo, Seung-Hoon;Lee, Gwang-Man;Lee, Eul-Rae
    • Journal of Korea Water Resources Association
    • /
    • v.44 no.9
    • /
    • pp.765-776
    • /
    • 2011
  • Flood discharge capacity in a dam downstream reach has been decreased after dam construction because of the river cross section reduction impacted by farm lands, sand-bars and parking lots, etc. in river flood plains. Those obstacles being in the river inside areas have caused negative influences to the dam operation policy. Therefore, the dam downstream river improvement work associated with the dam operation improvement plan is under construction for removing reduction factors on the dam effective storage, assuring flood safety in the dam downstream river and incrementing dam operation benefits. But the project has issued some problems such as project feasibility, economic evaluation, cost allocation and benefit share, etc. Since a dam enterpriser has not committed such kind of project before, it is necessary to set up an objective analysis process and a quantitative financial valuation. This study examines the measurable economic benefits and the cost allocation of the project for the fairness between benefit owners (central government and water electricity enterprisers). As a result, the total economic benefit from 3 dams (Imha, Daechung and Youngdam Dam) accounts for 14.41 Billion Won/year. The financial valuation of K-water as a project enterpriser is approximately estimated at 40% of the total value and the government is 60%.