This study intends to provide the necessary basic data needed for predicting the water quality and examining changes in water quality on the basis of the hydrological changes: an outflow or the character of a flow by investigating the interaction of the parameters through the estimation of optimal parameters need for predicting the water quality of the dam basin and the sensitivity among those estimated parameters. Im-Ha Dam in the upstream area of the Nakdong River was selected for analysis, and the water quality survey data necessary for parameter estimation was based on the monthly water quality data (water temperature, BOD, T-N and T-P) between December 1, $2005{\sim}$November 31, 2006. K1C(the saturated growth rate of plant plankton), K1RC (endogenous respiratory quotient of plankton), KDC(deoxidized ratio), K71C(minealized ratio of dissolved organic phosphorus), K83C(mineralized ratio of dissolved organic nitrogen) have been considered as the factors of the water quality performed in this water quality simulation, that is, the most effective parameters on BOD, T-N and T-P. In the result of the analysis of the sensitivity, KDC(deoxidized ratio) was the most sensitively reacted parameter on BOD and it was K71C(mineralized ratio of dissolved organic phosphorus) and K83C(mineralized ratio of dissolved organic nitrogen) on T-N and T-P. It is considered that it will be possible to apply the most optimal parameter to an analysis of the water quality simulation at Im-Ha Ho basin in the goal year by examining the interaction of the parameters through the parameters sampling which are able to applicable to prediction of the water quality and the analysis of the its sensitivity, in the future, also the analysis on the basis of the hydrological conditions: an outflow or the character of a flow will be needed.
Radial collector wells (RCWs) have been managed by Korea Rural Community Corporation (KRC) since 1983, installing 98 wells for agriculture in rural area over the country. Among them, 20 wells were installed upstream of 5 subsurface dams and the remaining were installed regardless of the subsurface dam. Most of RCWs have been developed in 1980s and 1990s, and 83 wells have been passed more than 20 years after construction. The number of horizontal arms for RCWs varies from 9 to 28, with length and diameter being 10~30 m and 65 mm, respectively. The central caisson with an inner diameter of 3.5 m was commonly constructed to a depth of 10 m. The maximum pumping rates in RCWs, which are located at distances of 10 to 1,200 m from the river, are 2,000~10,000 m3/day. RCW has a fundamental problem that reduced pumping capacity and degraded well efficiency, due to the physical and chemical clogging. From the feasibility test for improving RCW performance, specific capacity increased to 67% after rehabilitation. TV logging for RCW horizontal arm shows that near the caisson is more severe clogging. From the results of this study, KRC has established the guidebook for monitoring and improving well efficiency through physical/chemical treatment, well logging, and hydraulic tests and managed RCWs periodically with its rehabilitation methods.
The conservation project to protect an endangered fish, Gobiobotia naktongensis was executed against declining the gene diversity of the fish after the construction of Youngju Dam in a sand-bed stream (Naeseongcheon Stream). We tried to move the populations of G. naktongensis from submerged planned sites to alternative habitats, bred artificially and augmented the juveniles to optimal habitat, and monitored the results of the restoration implementation. No entity of G. naktongensis was confirmed at the planned submerged sites despite attempting to capture more than 8 times and eventually the movement to alternative habitat could not be implemented. About 40 individuals of G. naktongensis were captured in the Naeseongcheon Stream and a total of 5,000 individuals were artificially spawned up. The population of juvenile inherited the genetic diversity from the brood stock. The bred juveniles were discharged at the selected optimal site that had a habit condition what was similar to their natural habitat. The micro-dispersion around the discharging area was found at the early stages of the augmentation. The re-capturing rate of discharged juveniles was reduced as time passed. The discharged juveniles seemed to adapt to the natural environment of Naeseongcheon Stream. The observation of their high abdominal distension and excrement demonstrated that the juveniles fed successfully in the discharging area. Therefore, securement of genetic homogeneity and enhancement of restoration population of G. naktongensis in upstream and downstream of Youngju Dam site from the artificial seed producing seemed to be primarily successful and long-term monitoring and analysis of the effect was expected to be necessary.
An analytical diffusion model for flood routing with backwater effects and lateral flows is developed. The basic diffusion equation is linearized about an average depth of (H + h), and is solved using the boundary conditons which take into account the effects of backwater and lateral flows. Scouring phenomenon around pier which affects on the support function of pier and the stabilization if river bed is a complex problem depending on flow properties and river bed state as well as pier geometry. therefore, there is no uniting theory at present which would enable the designer to estimate, with confidence, the depth of scour at bridge piers. The various methods used in erosion control are collectively called upstream engineering, HEC-RAS Model, underwater blasting. They consist of reforestation, check-dam construction, planting of burned-over areas, contour plowing and regulation of crop and grazing practices. Also included are measures for proper treatment of high embankments and cuts and stabilization of streambanks by planting or by revetment construction. One phase of reforestation that may be applied near a reservoir is planting of vegetation screens. Such screens, planted on the flats adjacent to the normal stream channel at the head of a reservoir, reduce the velocity of silt-laden storm inflows that inundate these areas. This stilling action causes extensive deposition to occur before the silt reaches the main cavity of the reservoir.
1-D hydrodynamic numerical models have been most widely used in the field of flood analysis. The model's input data are upstream/downstream boundaries, roughness coefficients, cross-sections, and so on, and computational distance step and time step are the most important factors in order to guarantee the computational accuracy, stability, and efficiency. In this study, a theoretical explanation is presented for the basis of the previous empirical selection criteria of cross-section's location; also, the estimation technique of computationally variable distance step is proposed to reflect the properties of flow at every computational time step. Combining this technique with 1-D unsteady numerical model, it was applied to two events of Teton dam failure flood and the Han River flood. The numerical experimental results demonstrate that the accuracy and stability is increased when used more interpolated cross-sections and show that the proposed technique of computationally variable distance step has the same order of accuracy with smaller numbers of cross-section than previous empirical selection criteria. The practical use of this technique will be possible to analyze the river floods with high efficiency as well as accuracy and stability.
Magazine of the Korean Society of Agricultural Engineers
/
v.13
no.1
/
pp.2206-2217
/
1971
Spillway and discharge channel of reservoirs require the Control of Large volume of water under high pressure. The energies at the downstream end of spillway or discharge channel are tremendous. Therefore, Some means of expending the energy of the high-velocity flow is required to prevent scour of the riverbed, minimize erosion, and prevent undermining structures or dam it self. This may be accomplished by Constructing an energy dissipator at the downstream end of spillway or discharge channel disigned to dissipated the excessive energy and establish safe flow Condition in the outlet channel. There are many types of energy dissipators, stilling basins are the most familar energy dissipator. In the stilling basin, most energies are dissipated by hydraulic jump. stilling basins have some length to cover hydraulic jump length. So stilling basins require much concrete works and high construction cost. Flip bucket type energy dissipators require less construction cost. If the streambed is composed of firm rock and it is certain that the scour will not progress upstream to the extent that the safety of the structure might be endangered, flip backet type energy dissipators are the most recommendable one. Following items are tested and studied with bucket radius, $R=7h_2$,(medium of $4h_2{\geqq}R{\geqq}10h_2$). 1. Allowable upstream channel slop of bucket. 2. Adequate bucket lip angle for good performance of flip bucket. Also followings are reviwed. 1. Scour by jet flow. 2. Negative pressure distribution and air movement below nappe flow. From the test and study, following results were obtained. 1. Upstream channel slope of bucket (S=H/L) should be 0.25<H/L<0.75 for good performance of flip bucket. 2. Adequated lip angle $30^{\circ}{\sim}40^{\circ}$ are more reliable than $20^{\circ}{\sim}30^{\circ}$ for the safety of structures.
Journal of Korean Society of Environmental Engineers
/
v.28
no.1
/
pp.74-80
/
2006
Benefit transfer is a method, which obtains an estimate for the economic valuation of non-marketed commodities at a given site through the analysis of studies that have been previously carried out to value similar commodities at a different location. The objective of this study was to estimate benefit transfer values for the construction of the integrated sewerage system in the catchment area of dams in Korea. For pooled data analysis, five models were suggested in this study. Among five models, model 2 showed only 6 to 7% errors when the willingness-to-pay(WTP) predicted in the policy-site, Dam Soyang was compared with that estimated using contingent valuation method(CVM) in the study-sites, Dams Namgang, Hapcheon, and Daecheong. However, the WTP estimate predicted by model 1 showed the absolute errors of 42 to 47% when it was compared with WTP estimated using CVM in Dams Andong and Imha. It seemed that residents of Dams Andong and Imha have feeling of being victimized since two dams were constructed very adjacently, the upstream area was designated as drinking water source protection zone, and thereafter their developmental economical actions have been significantly restricted.
The conflicts among nations surrounding international rivers are intensifying as worldwide water shortage is getting worse. The Mekong River is a representative trans-boundary river in Southeast Asia shared by six countries, China, Myanmar, Thailand, Laos, Cambodia, and Vietnam. As the economy grows, hydroelectric power has become a major power supply source to meet the increasing power demand of the these countries. However, the construction of dams on the Mekong River is controversial because hydroelectric power in the river upstream has a negative impact not only on the whole river ecosystem but also on residents' life around downstream, in particular. In order to understand the controversy arising from international rivers, it is necessary to take into account different positions of countries sharing it. However, studies on the position of a specific country to Mekong hydropower have been conducted mainly focusing on China and Laos. Therefore, this study tried to study the position of Cambodian government which is located downstream of the Mekong River and is likely to bear costs rather than to gain benefits from hydroelectric power generation. What is the attitude of the Cambodian government to the hydroelectric development of the upper Mekong and what is the reason for that? The study confirmed the Cambodian government's support for dam construction on the Mekong River. It also figured out influential factors on the formation of such a position as follows: 1) economic asymmetry with China, 2) power dependency and geographical asymmetry in Laos, and 3) importance of hydroelectric power in Cambodia.
This study presents a physical habitat modeling of adult Zacco platypus in a reach of the Dalcheon Stream located downstream of the Goesaan Dam. CASiMiR model is used to estimate habitat suitability index based on the fuzzy logic. Results are compared with those from River2D model, which uses habitat preference curve for habitat suitability index. Hydraulic data simulated by River2D are used as input data for CASiMiR model after verification against field measurements. The result shows that the habitat suitability of the adult Zacco platypus is maximum around the riffle area located upstream of the bend. CASiMiR and River2D estimate the maximum weighted usable areas at the discharge rates of 7.23 $m^3/s$ and 9.0 $m^3/s$, respectively. Overall comparison of the two models employed in this study indicates that CASiMiR model overestimates the weighted usable area by 0.3~25.3% compared with River2D model in condition of drought flow (Q355), low flow (Q275), normal flow (Q185), and average-wet flow (Q95).
Accelerated soil erosion due to extreme climate change, such as increased rainfall intensity, and human-induced environmental changes, is a widely recognized problem. Existing soil erosion models are generally based on the gross erosion concept to compute annual upland soil loss in tons per acre per year. However, such models are not suitable for event-based simulations of erosion and deposition in time and space. Recent advances in computer geographic information system (GIS) technologies have allowed hydrologists to develop physically based models, and the trend in erosion prediction is towards process-based models, instead of conceptually lumped models. This study aims to propose an effective and robust distributed rainfall-sediment yield-runoff model consisting of basic element modules: a rainfall-runoff module based on the kinematic wave method for subsurface and surface flow, and a runoff-sediment yield-runoff model based on the unit stream power method. The model was tested on the Cheoncheon catchment, upstream of the Yongdam dam using hydrological data for three extreme flood events due to typhoons. The model provided acceptable simulation results with respect to both discharge and sediment discharge even though the simulated sedigraphs were underestimated, compared to observations. The spatial distribution of erosion and deposition demonstrated that eroded sediment loads were deposited in the cells along the channel network, which have a short overland flow length and a gentle local slope while the erosion rate increased as rainfall became larger. Additionally, spatially heterogeneous rainfall intensity, dependant on Thiessen polygons, led to spatially-distinct erosion and deposition patterns.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.