Comparison of Flooding Patterns according to the Location of the Collapse of Dam body (저수지 댐 붕괴 지점에 따른 침수 양상 비교)

  • Danxun, Liu;Lee, Gil-Ha
    • Journal of Environmental Science International
    • /
    • v.31 no.6
    • /
    • pp.461-470
    • /
    • 2022
  • When an agricultural soil dam collapses, the extent of inundation and the rate of diffusion vary depending on where the collapse occurs in the dam body. In this study, a dam collapse scenario was established and a two-dimensional numerical model FLO-2D was used to closely examine the inundation pattern of the downstream residential area according to the dam collapse point. The results were presented as a flood risk map showing the changes and patterns of the extent of inundation spread. The flood level and the time to reach the maximum water level vary depending on the point of collapse, and the inundation of the downstream area proceeds rapidly in the order of the midpoint, left point, and right point collapse. In the left collapse point, the submergence appeared about 0.5 hour slower than the middle point, and the right collapse point appeared about 1 hour slower than the middle point. Since the relative damage pattern is different depending on the dam collapse point, insurance and disaster countermeasures will have to be established differently.

Flooding Simulation of Sandae Reservoir Collapse using 2D Hydrologic Model FLO-2D (2차원 수문모형 FLO-2D를 이용한 산대 저수지 붕괴 침수 모의)

  • Liu, Danxun;Lee, Khil Ha
    • Journal of Environmental Science International
    • /
    • v.31 no.9
    • /
    • pp.757-766
    • /
    • 2022
  • This study is to examine how well the hydrologic model reproduces the dam collapse. To do this, A hydrologic model FLO-2D is being operated to reproduce dam collapse with rainfall data and surface data in a small dam. In order to examine the performance of the model, the simulation was compared and reviewed with the data collected through the field survey. The results show that it takes about 2 hours to reach 1 km downstream. Inundation areas are about 188,640 m2 by the simulation and the difference from the field investigation is about 6.1%. Ten representative points were selected from the areas where the simulation and the field survey did not match. The discrepancy is less than about 0.08 m and does not appear to be significant. This study will present basic information on disaster preparedness operation and planning to minimize damage caused by sudden collapse of agricultural soil dams in the future.

3D Reconstruction Model of Malpasset Dam Using Close-Range Photogrammetry Technique for Geotechnical Application (근거리 사진 측량 기법을 이용한 Malpasset Dam의 3차원 재구성 모델 및 지질공학적 적용)

  • Lee, Hana
    • The Journal of Engineering Geology
    • /
    • v.31 no.2
    • /
    • pp.179-186
    • /
    • 2021
  • Malpasset Dam, located in France, is of great importance in the field of civil and geotechnical engineering as it was the first arch dam that totally collapsed in 1959. A three-dimensional model of the dam was reconstructed using close-range photogrammetry technique. The orientations of foliation developed in the bedrock and the collapse surface were measured. Moreover, both model and measurement results showed high precision. The study result can be used in future studies such as collapse simulation analysis and geotechnical investigations.

Detection of Change in Water System Due to Collapse of Laos Xe pian-Xe namnoy Dam Using KOMPSAT-5 Satellites (KOMPSAT-5 위성 영상을 활용한 라오스 세피안-세남노이 댐 붕괴에 따른 수계변화 탐지)

  • Kim, Yunjee;Lee, Moungjin;Lee, Sunmin
    • Korean Journal of Remote Sensing
    • /
    • v.35 no.6_4
    • /
    • pp.1417-1424
    • /
    • 2019
  • Recently, disaster accidents have occurred frequently over the world, and disaster have been continuously studied using remote sensing due to large scale and hard-to-reach features. The collapse of Laos Xe pian-Xe namnoy dam in 2018 also caused a lot of human and economic damage. This study's purpose is to change detect water system due to the collapse of Xe pian-Xe namnoy dam in Laos and to derive areas where future flooding is expected. The water system is extracted from each image of KOMPSAT-5 before and after the dam collapse in order to quantitatively change detect in the water system. The result of the water system area increased more than 10 times after the dam collapse. In addition, it is confirmed that the newly created water system is thickly created in areas of low altitude area. This study result can be used in the future to systematize the pre-response to abnormalities and issues in existing operating dams. And then, if combined with other remote sensing data, more diverse and specific results could be obtained.

Characteristics of Reservoir Behavior According to Establishment Range of Waterproof Mat During Overflow (차수매트 포설 범위에 따른 저수지 월류시 거동 특성)

  • Kim, Young-Ik;Lee, Ik-Sang;Choi, Don-Hwan;Im, Eun-Sang;Kim, Yong-Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.52 no.2
    • /
    • pp.59-66
    • /
    • 2010
  • This study was performed to develop the embankment protection method that can reduce demage by prevention of embankment loss and collapse from overflow due to heavy rain and flood. For overflow test, model dam was prepared and embankment behaviors were monitored with the established piezometer and strain meter during overflow. As a result of overflow test for model dam, in case of embankment without waterproof mat, the lower end of embankment was collapsed within 40 seconds after beginning of overflow. On the other hand, in case of embankment with waterproof mat, embankment collapse didn't occurred during overflow. Accordingly, establishment of waterproof mat for embankment showed that be absolutely effective for the embankment protection during overflow in reservoir. Also, it showed that the minimum establishment range of waterproof mat to prevent embankment collapse in reservoir is from maximum storage level to the lower end of embankment.

Experimental Study of Collapse Delay Effect of Riprap on Dam Slope (사력댐 사석 보호공의 붕괴 지연 효과에 대한 실험 연구)

  • Jeong, Seokil;Kim, Seung Wook;Kim, Hong Taek;Lee, Seung Oh
    • Journal of Korean Society of Disaster and Security
    • /
    • v.11 no.1
    • /
    • pp.31-38
    • /
    • 2018
  • The 99.1% of small dam and most of the levees in Korea are soil dam which can be constructed with lower cost and less effort compared with ones made of concrete. However, they are so vulnerable to overflow. Sudden collapses of these strucrues lead to increase flow rate rapidly, which may cause catastrophic problems in downstream regions. In this study, the experimental study on the collapse delay effect of riprap that was laid on slope of soil levee was carried out. A prismatic rectangular open channel was used and three different sizes of the riprap were installed on slope of a scaled earth dam. A new formula for the collapse time of the levee with the installation of riprap was presented, using the previous researches and the dimensional analysis. In this process, an unsteady flow condition was considered to derive the deviation time of the riprap. And additional experiments were conducted to understand the effect of reinforcement of riprap, and it was found that the reinforcement of riprap was more effective than twice sizing of intial riprap. If the collapse time is delayed, EAP (Emergency Action Plan) and forecasting can greatly reduce the degree of flood damage. Also, it will be meaningful that the results of this study are used for river design.

Improvement of Seismic Performance Evaluation Method for Concrete Dam Piers by Applying Collapse-Level Earthquake(CLE) (붕괴방지수준(CLE)을 적용한 콘크리트 댐 피어부 내진성능평가 방안 개선)

  • Jeong-Keun Oh;Yeong-Seok Jeong;Min-Ho Kwon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.28 no.1
    • /
    • pp.1-11
    • /
    • 2024
  • The purpose of this paper is to suggest a method for applying a reasonable dam axial seismic load loading method and load-bearing capacity evaluation method in the dynamic analysis of the pier part of a concrete dam to which the seismic force of the collapse prevention level is applied. To this end, the pier part of a concrete dam was selected as a target facility, and the characteristics of the dynamic behavior in the axial direction of the weir dam were analyzed through dynamic analysis applying various weir widths, and 'U.S. The load-bearing capacity evaluation was performed by applying the RC hydraulic structure evaluation technique suggested by the Army Corps, 2007'. As a result of the study, when applying seismic force in the axial direction of the pier part, it is more realistic to assume that the axial direction of the weir part dam behaves as a rigid body and 'U.S. Army Corps, 2007' suggested that the method of reviewing the load-bearing capacity for moment and shear was considered reasonable, so it was concluded that improvement of the current evaluation method was necessary. If the improvement of the research result is applied, it will have the effect of deriving more reasonable evaluation results than the current seismic performance evaluation method using CLE. It is judged that additional research is needed in the future on the torsional moment occurring in the pier part.

Effect analysis by time passage after Repair & Reinforcement of Fill Dams (필댐 보수보강후 시간경과에 따른 효과 분석)

  • Kim, Jae-Hong;Oh, Byung-Hyun;Im, En-sang;Hong, Won-Pho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.697-703
    • /
    • 2008
  • Excessive water leakage phenomenon happens through damage of nation core zone of about 17,000 storage of water facilities or collapse of dam is worried, is being damaged or enforce dilapidated fill dam core zone's repair reinforcement. Example that use grouting method of construction considering construction and economic performance etc. recently by repair reinforcement way about defect of dam is increased. Permeation grouting method repair & reinforcement of fill dam countermeasure is preferred in nation. Do that is economical to decide these repair reinforcement effect and grouting effect estimation method that do not give damage to dam is effective. Therefore, observing electricity resistivity Survey change of dam since grouting reinforcement using Electric resistivity Survey inquiry of seismic survey method in this research, Wished to verify grouting effect whether is possible as Electric resistivity Survey, and study whether integrity of dam through repair reinforcement defined.

  • PDF

Sensitivity Analysis of Model Parameters used in a Coupled Dam-Break/FLO-2D Model to Simulate Flood Inundation (FLO-2D에서 댐붕괴 모형 매개변수의 침수 범위 민감도 분석)

  • Lee, Khil-Ha;Son, Myung-Ho;Kim, Sung-Wook;Yu, Soonyoung;Cho, Jin-Woo;Kim, Jin-Man;Jung, Jung-Kyu
    • The Journal of Engineering Geology
    • /
    • v.24 no.1
    • /
    • pp.53-67
    • /
    • 2014
  • Numerical modeling is commonly used to reproduce the physical phenomena of dam-break and to compile resulting flood hazard maps. The accuracy of a dam-break model depends on the physical structure that describes the volume of storage, breach formation and progress, input variables, and model parameters. Model input and parameters are subjective in that they are prescribed; hence, caution is needed when interpreting the results. This study focuses on three parameters (breach degree ${\theta}$, shape factor P, and collapse rate k) used when the dam-break model is coupled with FLO-2D (a two-dimensional flood simulation model) to estimate flood coverage and depth etc. The results show that the simulation is sensitive to the shape factor P and the collapse rate k but not to the breach degree ${\theta}$. This study will contribute to reducing flood damage from dam-break disasters in the future.