• 제목/요약/키워드: Dam Discharge

검색결과 402건 처리시간 0.023초

발전방류구 위치변화에 따른 저수지내 탁수변화 -대청댐을 대상으로- (Effect of Hydroelectric Power Plant Discharge on the Turbidity Distribution in Dae-Cheong Dam Reservoir)

  • 서세덕;이재일;하성룡
    • 환경영향평가
    • /
    • 제20권2호
    • /
    • pp.227-234
    • /
    • 2011
  • In the study, CE-QUAL-W2 was used and its examination and correction were conducted targeting 2001 and 2003 when the condition of rainfall was contradicted. Using the proved model in 2003, a scenario was implemented with management of locations for dewatering outlets and actual data for dam management in 1987 when inflow and outflow level were almost same. In case of the scenario which the location of dewatering outlets was 5m higher than usual location, exclusion efficiency for turbid water inflow at the beginning of precipitation was good. In case of the scenario which the location of dewatering outlets was 10m lower than usual location, exclusion efficiency for excluding turbid water remained in a reservoir after the end of precipitation. However, the scenario applying dam management data in 1987, exclusion efficiency was relatively low. In the scenario, power-generating water release spot at EL.57m for first four days after the beginning of precipitation, EL.52m for 5th to 8th and EL.42m from 9th days. An analysis of the scenario reveals that both excessive days exceeded 30 NTU and average turbidity levels were decreased comparing before and after the alteration on outlets. The average turbidity levels were decreased by minimum of 55% to maximum of 70% and 30NTU exceeding days were decreased by 45 days at maximum. Also, since it could exclude most of turbid water in a reservoir before the destatifcation, the risk for turbid water evenly distributed in a reservoir along with turn-over could be decreased as well.

지하댐 설치에 의한 수자원 개발량 평가 (Assessment of water resources by the construction of subsurface dam)

  • 김상준
    • 한국수자원학회논문집
    • /
    • 제50권11호
    • /
    • pp.795-802
    • /
    • 2017
  • 본 연구는 지하댐에 의한 수자원 개발량을 평가하는 방법론을 제시한다. 연구 대상지역으로 선택한 쌍천 지하댐은 동해안 쌍천유역 하구에 위치하며 비피압 충적 대수층을 형성하고 있다. 동해안에는 지형적으로 유사한 지하댐 후보지가 여러 개 존재한다. 본 연구에서는 대수층의 지하수위를 평면 2차원 FDM 모형으로 산출하였으며, 여기서 유역 유출은 대수층 표면에 침투항으로서 입력된다. 3개의 유역 유출모형의 평균으로서, 기저유량은 $0.5m^3/sec$로 산출되었다. 그리고 이 기저유량 근처의 유입량을 갈수기 유입으로 간주하여, 유입량 및 양수량 변화에 따른 지하수위를 산출하는 방법으로 수자원 개발량을 평가하였다. 구체적으로는 현재 속초시 생활용수를 공급하고 있는 실제 양수량($28,000m^3/day$)을 적용하여, 우물 수위가 대수층 바닥에 도달하거나 지하수위가 대수층 표면을 상회하여 지표수 흐름이 발생하는 유입량을 추정하였다. 또한 수자원 개발량을 증대시키기 위하여 우물의 양수량을 증가시키거나 추가 우물을 설치하는 상황을 재현하고, 극심한 갈수기에 가능한 양수량을 산출하였다.

시화조력발전소 방류 수문을 활용한 조류발전이 조력발전에 미치는 영향 (Effect of tidal current turbine using the discharge gate of Siwha tidal power plant on the tidal power generating)

  • 김영준;김용열;조용;고재명
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2010년도 춘계학술대회 초록집
    • /
    • pp.236.2-236.2
    • /
    • 2010
  • The tidal current power is the power plant by installing the turbine or rotor where the tidal speed is fast. This system converting the horizontal movement to rotating energy. Tidal power turbine is needed for the dam to utilize the pressure difference. However, tidal current power using the only flow. The tidal current power was evaluated as the impact on the marine environment surrounding was less and the development of eco-friendly way. In this article, we calculated the effect of tidal current turbine on the tidal power generating by mean of CFD. With these calculated results, we checked the possibility of tidal current power using tidal power plant the discharge gate.

  • PDF

Potential of River Bottom and Bank Erosion for River Restoration after Dam Slit in the Mountain Stream

  • Kang, Ji-Hyun;So, Kazama
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2011년도 학술발표회
    • /
    • pp.46-46
    • /
    • 2011
  • Severe sediment erosion during floods occur disaster and economic losses, but general sediment erosion is basic mechanism to move sediment from upstream to downstream river. In addition, it is important process to change river form. Check dam, which is constructed in mountain stream, play a vital role such as control of sudden debris flow, but it has negative aspects to river ecosystem. Now a day, check dam of open type is an alternative plan to recover river biological diversity and ecosystem through sediment transport while maintaining the function of disaster control. The purpose of this paper is to verify sediment erosion progress of river bottom and bank as first step for river restoration after dam slit by cross-sectional shear stress and critical shear stress. Study area is upstream reach of slit check dam in mountain stream, named Wasada, in Japan. The check dam was slit with two passages in August, 2010. The transects were surveyed for four upstream cross-sections, 7.4 m, 34 m, 86 m, and 150 m distance from dam in October 2010. Sediment size was surveyed at river bottom and bank. Sediment of cobble size was found at the wetted bottom, and small size particles of sand to medium gravel composed river bank. Discharge was $2.5\;m^3/s$ and bottom slope was 0.027 m/m. Excess shear stress (${\tau}_{ex}$) was calculated for hydraulic erosion by subtracting the values of critical shear stress (${\tau}_{c}$) from the value of shear stress (${\tau}$) at river bottom and bank (${\tau}_{ex}=\tau-{\tau}_c$). Shear stress of river bottom (${\tau}_{bottom}$) was calculated using the cross-sectional shear stress, and bank shear stress (${\tau}_{bank}$) was calculated from the method of Flintham and Carling (1988). $${\tau}_{bank}={\tau}^*SF_{bank}((B+P_{bed})/(2^*P_{bank}))$$ where $SF_{bank}=1.77(P_{bed}/p_{bank}+1.5)^{-1.4}$, B is the water surface width, $P_{bed}$ and $P_{bank}$ are wetted parameter of the bed and bank. Estimated values for ${\tau}_{bottom}$ for a flow of $2.5\;m^3/s$ were lower as 25.0 (7.5 m cross-section), 25.7 (34 m), 21.3 (86 m) and 19.8 (150 m), in N/$m^2$, than critical shear stress (${\tau}_c=62.1\;N/m^2$) with cobble of 64 mm. The values were insufficient to erode cobble sediment. In contrast, even if the values of ${\tau}_{bank}$ were lower than the values for ${\tau}_{bottom}$ as 18.7 (7.5 m), 19.3 (34 m), 16.1 (86 m) and 14.7 (150 m), in N/$m^2$, excess shear stresses were calculated at the three cross-sections of 7.5 m, 34 m, and 86 m distances compare with ${\tau}_c$ is 15.5 N/$m^2$ of 16mm gravel. Bank shear stresses were sufficient for erosion of the medium gravel to sand. Therefore there is potential to erode lateral bank than downward erosion in a flow of $2.5\;m^3/s$. Undercutting of the wetted bank can causes bank scour or collapse, therefore this channel has potential to become wider at the same time. This research is about a potential of sediment erosion, and the result could not verify with real data. Therefore it need next step for verification. In addition an erosion mechanism for river restoration is not simple because discharge distribution is variable by snow-melting or rainy season, and a function for disaster control will recover by big precipitation event. Therefore it needs to consider the relationship between continuous discharge change and sediment erosion.

  • PDF

고정식 표면영상유속계 (FSIV)를 이용한 실시간 하천 유량 산정 (Real-time Discharge Measurement of the River Using Fixed-type Surface Image Velocimetry)

  • 김서준;류권규;윤병만
    • 한국수자원학회논문집
    • /
    • 제44권5호
    • /
    • pp.377-388
    • /
    • 2011
  • 표면영상유속계(SIV)는 영상 분석 기법을 이용하여 하천의 표면유속을 측정하고, 이를 토대로 유량을 산정하는 시스템이다. 본 연구에서는 고정식 표면영상유속계(FSIV) 시스템을 달천 수전교에 설치하여 실시간으로 연속적인 유량 측정을 실시하였다. 수전교에 적용된 FSIV의 하드웨어 시스템은 영상 획득을 위한 2대의 디지털 카메라와 컴퓨터, 그리고 수위 측정을 위한 초음파 수위계로 구성된다. 이 현장 장비들에서 획득된 실시간 영상과 수위 자료는 무선인터넷을 이용하여 실시간으로 홈페이지에 전송되며, 표면영상유속분석 소프트웨어를 이용하여 유량을 산정한다. FSIV에 의한 유량산정 결과는 직상류의 괴산댐 방류량과 FSIV와 동일한 지점에 설치된 Acoustic Doppler Velocity Meter (ADVM)를 설치한 후 유속지수법으로 산정된 유량과 비교하여 검토하였다. 댐 방류량과 비교한 결과 30$m^3/s$ 이상의 유량에서는 대부분 5~10%의 오차를 보였으며, ADVM을 이용하여 측정된 유량과 비교한 결과는 약 200$m^3/s$ 이상의 유량에서는 오차가 약 5 % 이내로 확인되었다. FSIV의 설치 경비와 운용에 드는 비용과 인력을 감안한다면, FSIV는 실시간으로 유량을 관측할 수 있는 좋은 대안이 될 것으로 판단된다.

래버린스위어에 의한 여수로 배제유량 증대 (Increase of Spillway Discharge by Labyrinth Weir)

  • 서일원;송창근;박세훈;김동주
    • 대한토목학회논문집
    • /
    • 제28권1B호
    • /
    • pp.11-20
    • /
    • 2008
  • 본 연구에서는 국내 중소규모 댐의 대부분을 차지하는 자연 월류형 여수로의 홍수배제능력 증대를 위해 여수로의 월류부 형상 개선에 따른 배제유량을 분석하였다. 대표적인 댐으로서 대수호지를 선정하였으며 여수로 배제유량 분석을 위해 3차원 수리해석 프로그램인 FLOW-3D를 적용하였다. 여수로 개축모형으로서 직선형 래버린스위어 및 곡선형 래버린스위어를 적용하여 각 모형별 월류양상 및 방류량을 현 상태인 선형 측수로식 여수로와 비교하였다. 수치해석 결과의 검증을 위해 Froude 상사법칙에 의해 1/40로 축소된 수리모형 실험 자료와 비교해 본 결과 측수로 내 흐름 및 월류양상이 서로 잘 일치하였으며 측벽 옹벽에서의 수위도 근사하였다. 설계홍수위 시 위어형상 별 측수로 내 월류양상을 비교해 보면 선형 측수로 여수로의 경우 위어를 통과한 측수로 내 흐름이 원활하였으나 직선형 및 곡선형 래버린스위어의 경우 방류량이 현 상태에 비해 40 cms 증가하여 위어를 월류한 흐름이 수면 위를 타고 반시계 방향으로 돌게 되며 잠류가 발생되는 것으로 나타났다. 저수지 수위-방류량 모의 결과 직선형 및 곡선형 래버린스위어 모두 현 상태인 선형 측수로식 위어에 비해 유효길이를 더 확보할 수 있어서 저수위에서는 최대 71%의 방류량 증가 효과를 보였지만 수위가 증가함에 따라 측수로 내 잠류가 발생하고 수맥간섭이 심해져 방류곡선의 경사가 점차 완만해졌다.

13 kV급 수력발전기 고정자 권선용 On-line 부분방전 측정 시스템 개발 및 현장적용 평가 (Development and Site Evaluation of the On-line Partial Discharge Measuring System on the 13 kV Class Stator Windings for Hydro Generator)

  • 선종호;황돈하;윤영호;신병철;오봉근;강동식
    • 대한전기학회논문지:전기물성ㆍ응용부문C
    • /
    • 제55권4호
    • /
    • pp.189-198
    • /
    • 2006
  • In order to improve the reliability of stator windings for hydro generators, it is necessary to detect the defective point and life assessment of the high voltage windings. Especially the on-line partial discharge (PD) test provides the ability to monitor effects, such as slot discharge, internal discharge, and end-winding discharge without interrupting generators, this method has been proven the major testing technology in high voltage rotating machines nowadays. The purpose of this paper is to describe the method of the on-line PD measurement on stator windings for hydro-generator with 13 [kV] class ceramic coupler (CC), on-line PD measuring system, terminal box, and index parameters. Also, the developed PD measuring system and 13 [kV] class CC were installed Daechung-dam generator #2. It was found that this installed sensor and system had good electrical characteristics to detect PD activity during the operating condition with its detection frequency band is between several and several tens MHz.

대청호 발전방류수의 인·탁수 배출 역동성과 육수·수문학적 영향 (Dynamics of Phosphorus-Turbid Water Outflow and Limno-Hydrological Effects on Hypolimnetic Effluents Discharging by Hydropower Electric Generation in a Large Dam Reservoir (Daecheong), Korea)

  • 신재기;황순진
    • 생태와환경
    • /
    • 제50권1호
    • /
    • pp.1-15
    • /
    • 2017
  • 대청호는 금강의 중 하류에 대댐(>15 m 높이) 건설로 만들어진 저수지이며, 방류시스템은 수문-여수로, 수력발전 방수로 및 취수탑을 가지고 있다. 본 연구의 목적은 저수지의 하류 댐에서 발생하는 탁수 감소, 녹조현상 및 빈 영양 상태에 대한 육수학적 의문점을 파악하기 위한 것이었고, 수문 기상학적 요인을 중심으로 비교분석 하였다. 현장조사는 2000년 1월부터 12월까지 댐과 발전방류구 지점에서 1주 간격으로 수행하였다. 강수량은 유입량, 방류량 및 수위변동과 밀접한 관련성을 보였다. 강우패턴은 장마와 태풍호우에 의존적이었고, 유량, 탁도의 증가는 강우 빈도보다 강도에 더욱 중요하게 반응하였다. 저수지의 수층별 수온과 DO 변동은 기상 수문학적 영향이 컸고, 수온성층, 밀도류 및 방류에 기초 한 수위변동이 주요한 원인으로 작용하였다. 수문 및 발전방류는 각각 수체의 유동과 탁수 영양염의 배출을 유도하였다. 특히, 저층수에서 저산소 또는 빈산소일 때, 발전방류는 저질층에서 용출되는 인(P)을 댐 하류 하천으로 유출하는 데 크게 기여하였다. 또한, 연중 지속적으로 가동되는 발전방류수는 저수지의 하류(정수대)를 저영양 상태로 만들 수 있는 주된 요인이었다. 그리고 저수지의 하류에서 발생하는 녹조현상은 수문-여수로 방류 때 상류의 수체가 하류로 이송 및 확산된 결과이었다. 발전방류수는 저수지 생태계의 물리, 화학 및 생물학적 요인에 시공간적 영향을 광역적으로 미칠 수 있는 중요성과 역동성을 포함하고 있었다.

강우모의기법과 강우-유출 모형을 연계한 댐 유입량 자료 생성기법 개발 (Development of dam inflow simulation technique coupled with rainfall simulation and rainfall-runoff model)

  • 김태정;소병진;유민석;권현한
    • 한국수자원학회논문집
    • /
    • 제49권4호
    • /
    • pp.315-325
    • /
    • 2016
  • 일반적으로 하천의 유량은 댐과 같은 수공구조물에 의해 조정된 유량으로 수자원계획을 위해서 필요한 자연유량과는 차이가 크다. 수자원계획을 수립함에 있어 자연 유입량 정보는 댐 운영과 수문분석을 위한 필수적인 정보이다. 본 연구에서는 댐 유역 일유입량 모의기법을 위한 통합 모형을 개발하였다. 첫째, 장기 강우-유출 모형의 입력강우자료로 사용하기 위하여 평균 및 중앙값과 같은 통계적 모멘트를 효과적으로 재현하고 극치 강우량 재현에 유리한 불연속 Kernel-Pareto 확률분포 기반의 강우모의기법을 통하여 강우모의를 수행하였다. 둘째, SAC-SMA 장기 강우-유출 모형의 매개변수를 Bayesian MCMC 기법을 통하여 최적화하여 산정된 매개변수의 사후분포를 활용하여 댐 유입량 시나리오 도출하였다. 댐 유역을 대상으로 개발된 모형을 평가한 결과 자연유량과 통계적으로 유사한 특성을 가지는 시나리오를 생성할 수 있었으며, 물수지 분석 등과 같은 수자원계획을 위한 시나리오로 활용이 가능할 것으로 판단된다.

이변량 Gumbel 혼합모형을 이용한 홍수심도 평가 (Evaluation of Flood Severity Using Bivariate Gumbel Mixed Model)

  • 이정호;정건희;김태웅
    • 한국수자원학회논문집
    • /
    • 제42권9호
    • /
    • pp.725-736
    • /
    • 2009
  • 홍수사상은 크게 첨두홍수량, 홍수용적, 지속기간 등과 같은 서로 상관된 세 가지의 요소로 정의될 수 있다. 그러나 그동안 수공학적 계획이나 설계, 운영 등을 위한 홍수빈도해석에서는 주로 첨두홍수량 한가지 요소에 초점을 맞추어 홍수빈도해석을 수행해 왔다. 이러한 단변량 홍수빈도해석은 서로 상관된 홍수사상 사이의 복잡한 확률적 거동을 분석하는 데 있어 한계를 가지고 있다. 따라서, 본 연구에서는 Gumbel 혼합모형을 이용한 이변량 홍수빈도해석을 수행하여 홍수심도를 평가하는 방안을 제시하였다. 소양강댐의 35개년 일유입량 자료와 대청댐의 28개년 일유입량자료에 대해 각각의 홍수사상을 분리하고, 분리한 홍수사상에 대해 첨두홍수량과 홍수용적 사이의 결합분포와 결합재현기간 등을 도출하였다. 또한 이러한 이변량 홍수빈도해석에 의해 도출된 홍수 특성을 단변량 홍수빈도해석의 결과와 비교함으로써, 홍수심도 평가에 있어 이변량 홍수빈도 해석기법의 적용성에 관하여 검토하였다.