• 제목/요약/키워드: DBR Scheduling

검색결과 21건 처리시간 0.037초

인터넷을 통한 주문생산환경에서의 실시간 생산 DBR 스케줄링 (Real-Time DBR Scheduling in Internet Based Make-to-Order Manufacturing)

  • 한영근;김연균
    • 산업공학
    • /
    • 제14권4호
    • /
    • pp.341-347
    • /
    • 2001
  • This paper describes a real-time manufacturing scheduling system on Internet using DBR(Drum-Buffer-Rope) scheduling method. We intend to change company-oriented manufacturing scheduling, which has been used at most manufacturing companies, to customer-oriented manufacturing scheduling. Customers can not only choose product kinds, quantities and order due dates, but also evaluate optimum order due date by themselves in real-time through internet and then the results will be converted into practical manufacturing scheduling. If the company cannot meet the customer order due date, it will offer reliable and accurate information to the customers by suggesting the earliest order due date. To evaluate the customer order due date in real time, companies should be able to estimate their accurate production capacity. This research uses Goldratt's DBR scheduling method to realize that function. The DBR scheduling does not recognize the production capacity of the whole company, but only of the constraint resources which have a great effect on the company throughput. Thus, it can improve the customer service level as well as the profit by performing more dynamic and reliable scheduling through Internet.

  • PDF

복수 DBR 기법을 이용한 PCB 생산라인의 효율적인 생산계획 시스템 개발 (Development of an Effective Manufacturing Scheduling System for PCB Manufacturing Line Using Dual DBR Method)

  • 요시다 아쯔노리;박정현
    • 한국산학기술학회논문지
    • /
    • 제10권10호
    • /
    • pp.2935-2944
    • /
    • 2009
  • 중소 PCB 제조업체에서는 외부 생산 환경 변화, 복수개의 제약공정, 많은 공정수, 긴 리드타임, 동일공정 반복생산 등의 특징으로 인하여 효과적인 생산 스케쥴 작성에 많은 어려움을 겪고 있다. 최근 TOC 이론에서 제시하고 있는 DBR기법을 PCB 생산라인에 적용하고자 하는 시도는 진행되고 있으나, 제약공정을 1개만 설정하도록 하는 일반적인 DBR로서는 PCB 생산라인의 특성상 충분한 효과를 기대할 수 없는 현실이다. 따라서 본 논문에서는 PCB 생산라인에서 효과적인 생산스케줄링을 수립하기 위하여 TOC의 DBR기법을 발전시킨 복수 DBR기법을 제시하였다. 또, 실제로 국내 중소 PCB 제조업체에 복수 DBR을 적용하여 제조 리드타임을 20%이상 단축함을 확인하였다.

MRP와 JIT에 부합하는 DBR 제약일정계획문제 해법 (Solution of the Drum-Buffer-Rope Constraint Scheduling Problems incorporated by MRP/JIT -)

  • 김진규
    • 산업경영시스템학회지
    • /
    • 제23권59호
    • /
    • pp.21-36
    • /
    • 2000
  • The drum-buffer-rope(DBR) system is a finite scheduling mechanism that balances the flow of the production system. DBR controls the flow of materials through the plant in order to produce products in accordance with market demand, with a minimum of manufacturing lead time, inventory, and operating expenses. This paper integrates the best of MRP push system and JIT pull system with DBR system, efficiently adapts these logics to capacity constraint resources, and contributes to the evolution of synchronous manufacturing. The purpose of this paper is, thus, threefold. The first objective is to identify the frame of theory of constraints(TOC) and the logic of DBR scheduling. The second objective is to formulate the DBR constraint scheduling problems(DBRCSP) in a job shop environments. Finally, the paper is to suggest the solution procedure of DBRCSP for embedding TOC into MRP/JIT along with an numerical expression. In addition, illustrative numerical example is given.

  • PDF

UML과 Visual Basic을 활용한 DBR Scheduling 시스템 개발 (Development of the DBR Scheduling system using UML and the Visual Basic)

  • 옥영석;박철호
    • 한국콘텐츠학회:학술대회논문집
    • /
    • 한국콘텐츠학회 2006년도 추계 종합학술대회 논문집
    • /
    • pp.31-36
    • /
    • 2006
  • 일반적인 생산일정관리 시스템은 ERP(전사적자원관리)의 모듈로서 MRP(자재소요량계획) 형태로 포함되어 있다. MRP 형태의 생산일정관리 시스템은 설계 및 생산일정의 변화에 신속하고 유연하게 대처할 수 없어 수주생산방식의 중소기업에서 중요한 납기를 지키는 것이 힘든 것으로 알려져 있다. TOC의 DBR Scheduling 시스템은 생산현장의 변화에 유연하고 효과적으로 대처할 수 있는 것으로 알려져 있어 수주생산방식 중소기업의 생산일정을 관리하는데 적합할 것으로 생각한다. 본 논문에서는 TOC 기반의 DBR Scheduling 시스템을 개발하기 위하여 먼저 Together이란 UML 툴을 이용하여 시스템 설계서를 작성하였고 Visual Basic.Net으로 시스템을 개발하였다.

  • PDF

Business Process Efficiency in Workflows using TOC

  • Bae Hyerim;Rhee Seung-Hyun
    • 한국정보시스템학회:학술대회논문집
    • /
    • 한국정보시스템학회 2003년도 추계학술대회
    • /
    • pp.55-63
    • /
    • 2003
  • Workflow Management System (WFMS) is a software system to support an efficient execution, control and management of complex business processes. Since traditional commercial systems mainly focus on automating processes, they don't have methods for enhancing the task performer's efficiency. In this paper, we propose a new method of executing business processes more efficiently in that a whole process is scheduled considering the degree of the participants' workload. The method allows managing the largest constraints among constituent resources of the process. We utilize DBR scheduling techniques to develop the method. We first consider the differences between workflow process models and DBR application models, and then develop the modified drum, buffer and rope. This leads us to develop WF-DBR (WorkFlow-DBR) that can control the proper size of the task performers' work list and arrival rate of process instances. Use of WF-DBR improves the efficiency of the whole process as well as the participants' working condition. We then carry out a set of simulation experiments and compare the effectiveness of our approach with that of scheduling techniques used in existing systems.

  • PDF

납기를 갖는 Job Shop 생산시스템에 대한 Simplified-DBR Scheduling 적용방안에 관한 연구 (A Study on Simplified-DBR Scheduling in Job Shop Environment with Due Dates)

  • 한원규;박창권
    • 산업공학
    • /
    • 제25권1호
    • /
    • pp.106-113
    • /
    • 2012
  • There are few factors like a due date observance of the customer's order, reducing the manufacturing lead time, and minimizing the inventory investment to successfully run the manufacturing system. It is difficult for corporation and a person concerned to be offered indicators to achieve few factors mentioned above from complex manufacturing systems having much fluctuations. Simplified-DBR based on TOC(Theory of Constraints) is a management paradigm which can offer indicators to effectively face with fluctuating market's needs when market's demand is smaller than a capacity of manufacturing system. This paper is offering a core indicator and management model which is needed to successfully run the manufacturing system for corporation and a person concerned who have short experience and knowledge and newly construct Sinplified-DBR manufacturing system. Thus, this paper provides a systemic guidance in the offered model through the simulation.

DBR 스케줄링에 있어 제약자원 선정에 관한 연구 (Selecting the Critical Resources Using DBR on Multi-parameters)

  • 서장훈;홍석묵;박명규
    • 대한안전경영과학회지
    • /
    • 제4권1호
    • /
    • pp.131-139
    • /
    • 2002
  • Since introducing the "Theory of Constraints" by Goldratt, its effect was verified by lots of scholars, men of enterprise. These days it is also introducing and studying in this country with good results. The objective of this study is to show how to determine the constraint resources on DBR scheduling. Actually, previous studies based on the line which just think a load/capacity rate on doing scheduling. This study will show a scheduling method which reflects multi-parameters. It could be a standard to reflect real manufacturing surroundings. On calculating a priority of each resources, we classified factors with subjective and objective factors. And we propose a decision model to incorporate values assigned by a group of experts on different factors to select a critical resource. On deploying this model, SN ratio of Taguchi method for each of subjective and objective factors will be used. And we propose a procedure which is organized with 7 steps. To understand the logic, a numerical manufacturing simulation will be presented. This method is a incorporating decision model on determining the constraint on multi parameters with experts.h experts.

DBR 스케줄링 기법의 연구 동향 (State-of-the-Art of DBR Scheduling Methodology)

  • 장성용
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회/대한산업공학회 2003년도 춘계공동학술대회
    • /
    • pp.652-659
    • /
    • 2003
  • 이 논문은 TOC(Theoyv of Constraints) 기반의 DBR(Dyum-Buffey-Rope) 스케줄링 기법의 기본 개념을 소개하고. 이 기법이 저음 개발되어 오늘에 이르기까지 실제 생산기업에 적용되고 이론적으로 발전되어온 역사를 문헌을 중심으로 고찰하는 것이다. DBR 스케줄링 기법의 기본 개념 및 구조를 간단한 사례를 중심으로 설명하였으며. 1998년 처음 개발된 이후 발표된 논문을 중심으로 프로세스 산업적용, 반도체 산업 적용, DBR과 ERP 통합, MPS 문제, 버퍼 크기 문제, 공급망 관리와의 연계, VAT 분석, JIT와의 연계, 서비스 산업에의 적용. 일반 산업응용 사례, DBR 시스템 개발 등으로 나누어 문한 분석을 한 결과를 제시하였다. 마지막으로 향후 DBR 기법의 발전 방향 등에 대하여 논의하였다.

  • PDF

세 단계로 이루어진 직렬 생산라인에 대한 DBR(Drum-Buffer-Rope) 방식의 적용 (Implementation of DBR System in a Serial Production Line with Three Stages)

  • 고시근
    • 대한산업공학회지
    • /
    • 제28권4호
    • /
    • pp.344-350
    • /
    • 2002
  • An alternative to traditional production planning and control systems such as MRP and JIT is the drum-buffer-rope(DBR). Using the DBR system, companies can achieve a large reduction of work-in-process (WIP) and finished-goods inventories (FGI), significant improvement in scheduling performance, and substantial earnings increase. The purpose of this paper is to analyze the effect of the DBR system in a serial production line. Using Markov process, we modeled a DBR system with three stages. For the model developed, we analyze the system characteristics and then present an optimization model for system design. The system performance is also analyzed through sensitivity analysis.

6 시그마 환경에서의 TOC/DBR 구현 (Implementation of TOC/DBR under Six Sigma environment)

  • 고시근;구평회;하재원;권혁무;김동준
    • 품질경영학회지
    • /
    • 제32권2호
    • /
    • pp.154-167
    • /
    • 2004
  • The TOC/DBR and Six Sigma are the most attention-getting concepts for managing manufacturing companies in Korea. Using the ideas and methods of the TOC/DBR, companies can achieve a large reduction of work-in-process and finished-good inventories, significant improvement in scheduling performance, and substantial earnings increase. The Six Sigma approach derives the overall process of selecting the right projects based on their potential to improve performance metrics and selecting/training the right people to get the business results. These two concepts have different backgrounds and different viewpoints for production systems. So, if the two concepts collaborate each other, the synergy effects to innovate production systems can be expected. This paper proposes a new approach to implement the TOC/DBR concepts in production systems. This approach uses some concepts of Six Sigma which stresses educations, project approaches (step by step procedure using a Roadmap), and improvement philosophy.