• Title/Summary/Keyword: DAT (Data Acquisition Technology)

Search Result 6, Processing Time 0.024 seconds

Application of DAT (Data Acquisition Technology) in the Construction Projects (건설 프로젝트의 DAT (Data Acquisition Technology) 활용현황 및 개선방향)

  • Seo, Keun-Sol;Jung, Young-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.329-333
    • /
    • 2008
  • As construction projects become getting bigger and complicated, the importance of resource management in construction sites is to be emphasized all the more than ever, but the reality is now gone far away leaving data filing and management dependent on the hands of in-field managers, which gives rise to a variety of problems such as decreased productivity. The manually-dependent data management makes it hard to acquire data and information needed for projects both quickly and correctly with abundant cost and endeavor by accumulating the related data, and efficient project management, being exemplified by such practical applications as Bar-code, RFID(Radio Frequency Identification), GPS(Global Positioning System), PDA(Personal Digital Assistants), USN(Ubiquitous Sensor Network) and DAT(Data Acquisition Technology). In this context literature survey is made theoretically, taken into account 14 classification of construction works, 31 types of work classification in CIS, Masterformat as follows;

  • PDF

Effective Areas for DAT Utilization in Construction Projects (건설 사업관리 DAT 활용분야 및 적용방법 분석)

  • Seo, Keun-Sol;Park, Jong-Soon;Jung, Young-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.15-24
    • /
    • 2010
  • The managerial effort to acquire and maintain detailed construction control data has been the major barrier to improving the effectiveness of construction project management. Therefore, utilizing data acquisition technologies (DAT) can greatly improve the construction management processes by automating the data collection. Even though many researches attempted to explore the DAT utilization in construction, there has been no comprehensive study that examine the viability of DAT usage from a comprehensive perspective. In this context, the purpose of this study is to investigate the current efforts and future recommendation of DAT implementation in the construction industry.

Data Acquisition Technology (DAT) Selection Algorithm for Automated Progress Measurement and Management (진도관리 자동화를 위한 자료수집기술(DAT) 선정 방법)

  • Kang, Seung-Hee;Jung, Young-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.77-86
    • /
    • 2012
  • Progress measurement provides project participants with valuable information in terms of 'current status', 'corrective countermeasure', and 'forecast of future risks'. However, the managerial effort (or workload) required to acquire and maintain detailed progress data has been the major barrier to practical implementation. Even though recent efforts in utilizing data acquisition technologies (DATs) have actively attempted to automate the progress measurement process, previous DAT research has only been focused on limited construction tasks or selected technologies. This paper proposes a DAT selection algorithm that automatically assign an appropriate DAT for every commodity item for an entire constriction project. Five different criteria were identified and developed in order to comprehend specific requirements for automating the progress measurement of each commodity group. A case-study and also a survey from practitioners were conducted in order to validate the proposed methodology.

Automated Progress Measurement and Management using Face Recognition (안면인식(Face Recognition)을 활용한 진도관리 자동화)

  • Kim, Namjoon;Jung, Youngsoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.160-161
    • /
    • 2013
  • Progress measurement is one of key tasks for cost and schedule management in construction management. However, there has been shortage of effort to implement for automated progress measurement. This paper proposes to use a face recognition (FR) technology for automated progress measurement and management in construction sites. The FR technology can acquire detailed progress data that includes the in and out information of labors by location. The expected effectiveness of the proposed system is to provide accurate labor information for progress measurement by utilizing automated data acquisition technology (DAT) with high-speed reading face. In addition, it could be applied to real-time safety and quality management by using the camera images.

  • PDF

A Study on Changes of Phenology and Characteristics of Spatial Distribution Using MODIS Images (MODIS 위성영상을 이용한 식물계절의 변화와 공간적 분포 특징에 관한 연구)

  • Kim, Nam-Shin;Lee, Hee-Cheon;Cha, Jin-Yeol
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.5
    • /
    • pp.59-69
    • /
    • 2013
  • Global warming also has effects on the phenology. The limitation of phenology study is an acquisition of phenology data. Satellite images analysis can make up limitation of monitering data. This study is to analyze spatial distribution and characteristics of phenology changes using MODIS images. Research data collected images of 16 day intervals of 11 years from year 2001 to 2010. The data analyzed 228 images of 11 years. It can figure out changes of phenology by analyzing enhanced vegetation index of MODIS image. We made a comparison between changes of phenology and flowering of cherry blossoms. As a results, Startup of season spatially was getting late from southern area to north area. Startup of Phenology was foreshortened 13 days during 11 years, and change ratios of cherry blooming was getting more faster from 0.18 dat to 0.22 day per year during that same period.

The Design and Implementation of Ontology for Simulation based Architecture Framework (ONT-AF) in Military Domain (SBA AF의 구축을 지원하는 온톨로지의 설계 및 구현(ONT-SAF))

  • Kwon, Youngmin;Sohn, Mye;Lee, Wookey
    • Journal of Information Technology and Architecture
    • /
    • v.9 no.3
    • /
    • pp.233-241
    • /
    • 2012
  • Architecture framework (AF) is a guideline to define components needed to develop and operate enterprise architecture (EA), and to define relationships among the components. There are many architecture frameworks to operate EA of governments and businesses such as Zachman framework, DoDAF, TOGAF, FEAF, and TEAF. DoDAF is the most representative AF to support the development of the EA in the military domain. DoDAF is composed of eight viewpoints and 40 views that are affiliated with the viewpoints. To develop an AF for a specific goal, system architects decide a set of views. Furthermore, they determine data that are needed for a view modeling. However, views and data in DoDAF are structurally inter-related explicitly and/or implicitly. So, developing an AF for a specific goal is going to be a project to be carried out over a long haul. To reduce the burden of its development, in this paper, we develop ONT-SAF (Ontology for DoDAF) that can infer inter-relationships like referential and transitive relationships and the sequences among the views. Furthermore, to promote reusability and consistency of the views and the data within an AF, we adopt the view-data separation strategy. ONT-DAT contains classes like 'viewpoint', 'view', 'data', 'expression method', and 'reference model', and 11 properties including 'hasView.' To prove the effectiveness of ONT-SAF, we perform a case study.