• Title/Summary/Keyword: Cut-slope

Search Result 420, Processing Time 0.032 seconds

Mineral Composition Properties of Collapsed Cut Slope (붕괴절토사면의 광물조성 특성)

  • Kim, Jin-Hwan;Koo, Ho-Bon;Park, Mi-Sun;Baek, Young-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.731-734
    • /
    • 2005
  • Cut slopes are collapsed in Korea every year. Cut slope collapses cause a loss of lives and assets. Many researchers make clear collapse factor of cut lope. Fresh rock weathered through reaction undergroundwater and groundwater. During weathering process, weathered minerals are created. Weathered minerals are analysed by X-ray diffraction meter. X-ray diffraction meter make possible quantity assessment of degree of weathering and indicator of potential collapse possibilities. This paper discuss possibilities of cut slope dangerous with analysis of weathered minerals of cut slope.

  • PDF

Characteristics of Cut Slopes in Baekyang Mountain Area, Busan (부산 백양산지역 절개사면의 분포특성 조사)

  • Song, Young-Suk;Chae, Byung-Gon;Kim, Kyoung-Su;Cho, Yong-Chan
    • Journal of the Korean Geosynthetics Society
    • /
    • v.7 no.2
    • /
    • pp.31-39
    • /
    • 2008
  • The information of cut slope in Baekyang Mt. area, Busan is investigated in order to construct the Slope Management System in Urban Area. The slope inspection sheet is made to record the characteristics for cut slopes, and that is capable to be inputted slope information systematically. The cut slopes in Baekyang Mt. area are consisting of 103 slopes. Most of the cut slopes are constructed in cutting slope and retaining wall (CR). The school is mostly distributed adjacent to cut slopes. The average traverse of cut slopes is approximately 122m, and the average height is approximately 18m. The slopes combined with soil and rock are mostly distributed. The retaining wall was installed in the toe part of cut slope in order to increase the slope stability, and the additional reinforcement methods including the anchor, drainage, preventing rock fall, shotcrete and vegetation were installed in the walls and slopes.

  • PDF

The Hazard Grade Classification Criterion using Character of Collapsed Cut Slope by Rainfall (강우에 의해 붕괴된 절토사면의 특성을 이용한 절토사면 위험등급 분류기준)

  • Yoo, Ki-Jeong;Koo, Ho-Bon;Baek, Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.600-605
    • /
    • 2004
  • The road construction with horizontal expansion of country using and augmentation of traffic demand is advanced actively and it accompanies hereupon, the above of 70% of the country is formed at the mountain in our country where the hazard cut slope has been created. In this study, It is prepared a effective management countermeasure of cut slope introduced priority investigation decision method against hazard cut slope which is influenced by abnormally rainfall by an unusual change in the weather such as a guerilla rainfall character. In meaning link, It was executed collapse cause by failure character analysis in the cut slope which has failed for the last five years and it is prepared the hazard grade criterion from E to A grade according to collapse cause. It is decided that a maintenance management grade by the hazard grade classification criterion of cut slope. So It is possible to hazard cut slope. It is established failure protection counter countermeasure by effective maintenance management through the hazard grade c1assification criterion and it will be able to dispose to advanced nation level like Hong Kong and Japanese.

  • PDF

A case study on stability and reinforcement method of cut slope at quarry (채석장 사면의 안정성 검토 및 보강대책에 관한 사례 연구)

  • Park, Choon-Sik;Choi, Jun-Sam;Seo, Hyo-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.677-685
    • /
    • 2009
  • From the result of precise field investigation and stability examination for the cut slope, following results were acquired. 1. The cause of the cut slope collapse seems that it came from complex actions such as the weathering rock itself, existing fault zone and crack from excessive blasting. 2. As a result of analysis, it is appeared that the cut slope can be in danger of plane destruction. 3. The reinforcement force is decided by the result of limit equilibrium analysis. 4. For reinforcement the method after relaxing the slope was judged as the most proper method to the cut slope as comparing/analyzing Rock Anchor, Rock Bolt and method after relaxing the slope.

  • PDF

Characteristics on Stabilization Measures for Cutting Slopes of Forest Roads (임도구조 요인에 따른 절토비탈면 안정구조물의 특성)

  • Baek, Seung-An;Ji, Byoung-Yun;Lee, Joon;Cha, Du-Song
    • Journal of Forest and Environmental Science
    • /
    • v.30 no.1
    • /
    • pp.71-75
    • /
    • 2014
  • Forest roads failure is one of the most common problems caused by heavy rainfalls. This study investigated the characteristics on stabilization measures installed for cutting slopes failure of forest road resulted from heavy rainfalls. Three primary factors (slope length, slope gradient, soil type) affecting cutting slope failure were considered and stabilization measures were classified into two types (A type: wooden fence, vegetation sandbag, stone masonry; B type: wire cylinder, gabion, concrete retaining wall) through discriminant analysis based on their capacity of resistance to slope failure. Results showed that A type was mainly installed in such conditions as cut slope <8 m, cut slope gradient $30-40^{\circ}$ and soil type with soil while B type occurred in locational conditions as cut slope length >8 m, cut slope gradient < $30^{\circ}$ and > $30^{\circ}$, and soil type of gravelly soil and rock.

Identification of Dominant Cause of Cut-Slope Collapse and Monitoring of Reinforced Slope Behavior (개착사면의 붕락요인 분석 및 보강거동 계측)

  • Cho, Tae-Chin;Lee, Sang-Bae;Lee, Guen-Ho;Hwang, Taik-Jean;Kang, Pil-Gue;Won, Byung-Nam
    • Tunnel and Underground Space
    • /
    • v.21 no.1
    • /
    • pp.20-32
    • /
    • 2011
  • Failure aspects of cut-slope, which induce the sequential collapses during the excavation stage, have been analyzed. Slope rock structures are investigated by examining the orientations and positions of discontinuity planes calculated based on the BIPS image inside the boreholes. Drilled core log has been also used to identify the structural defects. Clay minerals of swelling potentials are detected through XRD analysis. Numerical analysis for slope stability has been performed by utilizing the joint shear strength acquired from the direct joint shear test. Cut-slope collapse characteristics have been studied by investigating the posture of failure-prawn joint planes and the stability of tetrahedral blocks of different sizes. Cross-section analysis has been also performed to analyze the cut-slope behavior and to estimate the amount of reinforcement required to secure the stability of cut-slope. Behavior of reinforced cut-slope is also investigated by analyzing the slope monitoring data.

Analysis of Problems in Road Cut-Slope Design Based on Practical Example (사례연구를 통한 도로 절개면 설계 문제점 분석과 대책안 제시)

  • 이기하;백영식;구호본;박혁진
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.167-174
    • /
    • 2000
  • Profiles of discontinuities through scanline method were investigated for the analysis of rock slope stability. Lower hemispheric projection method was used to evaluate the geometric stability and failure potential of these discontinuities. Also, safety factor was evaluated for the discontinuities of failure potential using by limit equilibrium analysis. Then, displacements of rock block due to the discontinuities were displayed by using the program UDEC(Universal Distinct Element Code) which applied the Distinct Element Method. When we determine the cut-slope in design, the characteristics of discontinuities is not represented only by strength parameters of intact rock. Therefore it is more reasonable method in assuring stability that first, construction would be preceded by the cut-slope of preliminary design, and then, cut-slope would be redetermined by elaborate site investigation in processing construction.

  • PDF

A Study on Development of Automated Monitoring System for Road Cut Slopes (위험도로사면의 실시간 무인감시시스템 개발 연구)

  • 김춘식;이광우;윤수호;조삼덕
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.607-614
    • /
    • 2000
  • A cost-effective automated slope monitoring system is developed to monitor hazardous cut slopes along highways. This automated slope monitoring system consists of data-collection and visual monitoring, data-transmitting, database and internet service, and alarm system. Wire-line extensometer, automatic raingauge, and CCD camera are selected as monitoring instruments in this system, after consideration of failure characteristics of roadside cut slopes in the country. This paper describes the important features of this newly developed automated slope monitoring system.

  • PDF

The Effect of Cut-slope on Structural Behavior of Cut-and-Cover Tunnel (굴착경사가 개착식터널의 구조적거동에 미치는 영향에 관한 연구)

  • 유건선
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.6
    • /
    • pp.245-255
    • /
    • 2001
  • Existing cut-and-cover tunnels are designed regardless of cut-slope under the assumption that the overburden weight of backfill soil acts on tunnel arch and the earth pressure at rest acts on tunnel walls. However, actual earth pressures acting on the tunnel lining depend on open-cut size composed of cut-slope and cut-width, and thus the tunnel lining shows a different structural behavior. This study investigated the effect of cut-slope on structural behavior of the cut-and-cover tunnel lining as follows; Firstly, a comprehensive numerical analysis method using FLAC2D code was used and verified by field measurements of tunnel profile. Secondly, based on the verified numerical analysis technique, earth pressure acting on the lining, and displacement and sectional force developed on the lining were estimated with various shapes of cut-slopes$30^{\circ}\;, 456{\circ},\; 60^{\circ},\; and\;75^{\circ}%). Numerical analysis results indicate that the steeper cut-slope shows the more displacement and moment of the tunnel lining.

  • PDF

A Case Study of Extra Reinforcement by Road Extension work on Existing Cut Slope Reinforced with Counterweight Fill and Stabilizing Piles (압성토 및 억지말뚝으로 보강된 도로의 확장공사로 인한 추가 보강사례 연구)

  • Park, Jeong-Yong;Kim, Woo-Seong;Kim, Jae-Kyoung;Yang, Tae-Sun;Na, Kyung-Joon
    • Journal of Korean Society of societal Security
    • /
    • v.1 no.2
    • /
    • pp.67-72
    • /
    • 2008
  • To confirm the stability of a cut slope in the road extension construction site, several investigations were carried out and countermeasures of slope was studied. This paper describes a study of design case of extra reinforcement on existing cut slope reinforced by preloading and piles in roads. To investigate the effect of stabilizing piles installed in a cut slope, an instrumentation system also designed, was. As a result that the stabilizing file and earth anchor are considered as the extra reinforcement, both stabilizing pile and earth anchor guarantee the stability of cut slope. However, stabilizing pile is selected in aspects of economy and continuity to the existing cut slop reinforcement including counterweight fill and stabilizing piles.

  • PDF