• Title/Summary/Keyword: Cut Blasting

Search Result 91, Processing Time 0.023 seconds

Application Case of Test of Revegetation Measures on Design of Slopes Revegetation and Tentative Instruction on Construction Work -With a Case of Slopes Along the National Road Between Nongseo and Eomo - (비탈면 녹화 설계 및 시공 잠정 지침 적용사례 -농소어모구간 국도비탈면을 중심으로-)

  • Jeon, Gi-Seong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.10 no.4
    • /
    • pp.95-108
    • /
    • 2007
  • Test application of revegetation measure was made on the roadside slope damaged by Nongseo-Eomo national road improvement project in a bid to prevent the soil from being washed out as well as to restore the ecological environment, and the survey for assessment of the effect of slope revegetation measures was conducted, beginning May 11 through Nov 7, 2006. In the wake of comprehensive reviewing and evaluating the surrounding topographic environment, physical and chemical characteristics of soil, germination of revegetation plants, analysis of bio mass, covering ratio and the plants appeared, measure b was found to have been most appropriate to cut blasting rock slope, and alternatively measure c. For cut ripping rock slope, measure c-1 appeared to be effective in revegetation effect, and alternatively, b-1.When it comes to cut soil slope, measure c-2 was found to be effective, and b-2 to be a good alternative. And for embankment soil slope, measure b-3 appeared to be most efficient in revegetation effect and measure f as alternative.

The effects of non-thermal plasma and conventional treatments on the bond strength of fiber posts to resin cement

  • do Prado, Maira;da Silva, Eduardo Moreira;Marques, Juliana das Neves;Gonzalez, Caroline Brum;Simao, Renata Antoun
    • Restorative Dentistry and Endodontics
    • /
    • v.42 no.2
    • /
    • pp.125-133
    • /
    • 2017
  • Objectives: This study compared the effect of hexamethyldisiloxane (HMDSO) and ammonia ($NH_3$) plasmas on the bond strength of resin cement to fiber posts with conventional treatments. Materials and Methods: Sixty-five fiber posts were divided into 5 groups: Control (no surface treatment); $H_2O_2$ (24% hydrogen peroxide for 1 min); Blasting (blasting with aluminum oxide for 30 sec); $NH_3$ ($NH_3$ plasma treatment for 3 min); HMDSO (HMDSO plasma treatment for 15 min). After the treatments, the Ambar adhesive (FGM Dental Products) was applied to the post surface (n = 10). The fiber post was inserted into a silicon matrix that was filled with the conventional resin cement Allcem Core (FGM). Afterwards, the post/cement specimens were cut into discs and subjected to a push-out bond strength (POBS) test. Additionally, 3 posts in each group were evaluated using scanning electron microscopy. The POBS data were analyzed by one-way analysis of variance and the Tukey's honest significant difference post hoc test (${\alpha}=0.05$). Results: The Blasting and $NH_3$ groups showed the highest POBS values. The HMDSO group showed intermediate POBS values, whereas the Control and $H_2O_2$ groups showed the lowest POBS values. Conclusion: Blasting and $NH_3$ plasma treatments were associated with stronger bonding of the conventional resin cement Allcem to fiber posts, in a procedure in which the Ambar adhesive was used.

The characteristics of blast-vibration in tunnel-blasting and the vibration control by delay-time (터널발파의 진동특성 및 발파시차에 의한 진동제어)

  • 이정인;신일재;윤영재
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 1997.04a
    • /
    • pp.235-240
    • /
    • 1997
  • 터널발파는 벤치발파와 달리 일반적으로 심발발파, 주변공발파, 조절발파를 적용하는 최외곽공 발파로 나눌 수 있는데, 본 연구에서는 심발공법별 터널발파의 진동특성을 자유면의 수를 고려하여 해석하였다. 또한 터널발파의 발파효율에 가장 큰 영향을 미치는 심발발파 발파공들간의 지연지차를 서로 달리하면서 시험발파를 수행하였다. 국내 고속전철 건설현장의 터널발파시 측정한 진동속도의 파형분석결과 1자유면 발파인 심발발파시 발생하는 발파진동이 2자유면 발파인 주변공 발파시 발생하는 발파진동보다 30% 이상 더 크게 나타났고, 조절발파용 화약을 사용한 최외곽공 발파의 경우는 주변공발파보다 20% 정도 작은 진동속도를 나타내었다. 심발공법별 비교에서는 SUPEX-Cut의 경우가 국내에서 가장 널리 사용되는 V-Cut에 비해 20-30% 정도 더 작은 진동속도를 나타내었다. 또한 심발공들을 동시에 발파한 경우와 각 발파공의 시차를 서로 다르게 한 경우의 심발 시험발파 결과를 분석한 결과, 발파공간의 발파시차를 60msec 이상으로 하였을 때, 각 발파공의 발파시 발생한 진동이 서로 중첩되는 것을 방지할 수 있는 것으로 나타났다.

  • PDF

Application Case of Test of Revegetation Measures on Design of Slopes Revegetation and Tentative Instruction on Construction Work -With a Case of Slopes Along the National Road Between Gimcheon and Eomo - (비탈면 녹화 설계 및 시공 잠정 지침 적용사례 -김천어모구간 국도비탈면을 중심으로-)

  • Jeon, Gi-Seong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.10 no.4
    • /
    • pp.83-94
    • /
    • 2007
  • Test application of revegetation measure was made on the roadside slope damaged by Gimcheon-Eomo national road improvement project in a bid to prevent the soil from being washed out as well as to restore the ecological environment, and the survey for assessing the effect of slope revegetation measures was conducted, beginning Sep 7 through Sep 20, 2006. In the wake of comprehensive reviewing and evaluating the surrounding topographic environment, physical and chemical characteristics of soil, germination of revegetation plants, analysis of bio mass, covering ratio and the plants appeared, revegetation measure C was found to have been most effective and desirable for further application in the area. Viewing the specific applicability by the area, revegetation measure C and C-1 appeared to be appropriate for blasting rock slope and ripping rock slope as they are efficient in preventing the slope from being washed out and in early revegetating. And revegetation measure B deemed to be effective to blasting rock slope or ripping rock slope as an alternative. And for cut slope, vegetation measure C-2 was judged to be more effective than measure D or E, while measure C-3 would be appropriateto embankment slope.

An Evaluation of Cutting Performance for Cutting Structural Steel using Charging Container (장약용기를 이용한 강재 절단 성능 평가)

  • Park, Hoon;Noh, You-Song;Suk, Chul-Gi
    • Explosives and Blasting
    • /
    • v.38 no.2
    • /
    • pp.13-21
    • /
    • 2020
  • The shaped charge was used in explosive demolition of a steel frame structure, but it was often not used because it was limited to use and impossible to supply at domestic and overseas. Existing linear shaped charge did not have sufficient cutting performance to cut steel frame structures with a huge scale and thick steel plate. To solve these problems, we produced a device that could generate metal jets using industrial explosives of high detonation velocity and pressure. In this study, we made a charging container of three types which applicable to explosive demolition of steel frame structures. The experiment of cutting performances was carried out to evaluate the effect of cutting of charging containers on the various thicknesses of the H-beam and steel plate. As a result of the experiment, sufficient cutting performance was confirmed.

A Study on the Crack-propagation Mechanism of Pre-splitting Method with Consideration of Stress Field (응력장을 고려한 프리스플리팅 공법의 균열발생 원리에 대한 연구)

  • Yoon, Ji-Sun;Woo, Taek-Gyu;Kim, Min-Woo;Jang, Young-Min
    • Explosives and Blasting
    • /
    • v.27 no.2
    • /
    • pp.1-11
    • /
    • 2009
  • Abstract By investigating the stress redistribution caused by the preceding cut blasting when applying the pre-splitting method to tunnel round, an attempt was made to find conditions that were favorable for the propagation of cracks in contour holes. The investigation of the direction of minor principal stress in the numerical analysis revealed that the most significant factor affecting the change of the direction was the loading condition, while the core shape, rock type, and tunnel depth seemed to be less important in determining the direction of minor principal stress. Moreover, the number of cracks tended to increase with the increase of deviatoric stress. Through the model test of pre-splitting, it is confirmed that the pre-splitting method taking the stress field into account can reduce the extent of yield zone and has advantage in controlling the direction of crack than the conventional one.

A study on improving the surface morphology of recycled wafer forsolar cells using micro_blaster (Micro blaster를 이용한 태양전지용 재생웨이퍼의 표면 개선에 관한 연구)

  • Lee, Youn-Ho;Jo, Jun-Hwan;Kim, Sang-Won;Kong, Dae-Young;Seo, Chang-Taeg;Cho, Chan-Seob;Lee, Jong-Hyun
    • Journal of Sensor Science and Technology
    • /
    • v.19 no.4
    • /
    • pp.291-296
    • /
    • 2010
  • Recently, recycling method of waste wafer has been an area of solar cell to cut costs. Micro_blasting is one of the promising candidates for recycling of waste wafer due to their extremely simple and cost-effective process. In this paper, we attempt to explore the effect of micro_blasting and DRE(damage removal etching) process for solar cell. The optimal process conditions of micro_blasting are as follows: $10{\mu}m$ sized $Al_2O_3$ powder, jetting pressure of 400 kPa, and scan_speed of 30 cm/s. And the particles formed on micro_blasted wafer were removed by DRE precess which was performed by using HNA(HF/$HNO_3$/$CH_3COOH$) and TMAH(tetramethyl ammonium hydroxide). Structural analysis was done using a-step and the XRD patterns.

A Study on the Behavior of an Existing Tunnel and the Safety Implications on its Facilities from a New Tunnel Blasting (신설 터널 발파 시 기존 터널 거동 및 시설물 안전에 관한 연구)

  • Kim, Sung Hoon;Cho, Woncheol
    • Journal of Korean Society of societal Security
    • /
    • v.3 no.2
    • /
    • pp.57-64
    • /
    • 2010
  • In this study, the behavior and safety of an existing tunnel and its facilities are investigated when a new tunnel adjacent to the existing tunnel is blasted. The design of the new tunnel puts priority on stability of the tunnel itself over the safety of the facilities which are installed within the existing tunnel such as jet fans. And thus, a detailed consideration on securing the safety of the existing facilities has been insufficient. An analysis on the types of traffic accidents in the last ten years shows that most incidents were due to the driver's improper response in emergency situations and unexpected obstacles. In consideration of this analysis, the safety of the facilities in the existing tunnel was secured by minimizing the charging amount for each hangfire and changing the excavation method of evacuation communication shelters to the large center hole cut blasting method to reduce blasting vibration. For a more quantitative analysis, measurement devices were installed inside the existing tunnel, at houses adjacent to the new tunnel, near jet fans in the existing tunnel. This enabled real time measurement of displacements of the existing tunnel, adjacent houses, and jet fans without interrupting traffic flow. Therefore, the improvements of charging amount for each hangfire, the blasting method, and the measurement method are suggested in this paper to secure the safety of the facilities in the existing tunnel when a new tunnel, located on a large city and adjacent to an existing tunnel, is designed.

  • PDF

Case Studies and Future Prospect of Using Bulk Emulsion (에멀젼계 벌크폭약을 이용한 시공사례와 향후 전망)

  • Kim, Hee-Do;Choi, Sung-Hyun
    • Explosives and Blasting
    • /
    • v.26 no.2
    • /
    • pp.64-76
    • /
    • 2008
  • Bulk Emulsion blasts using mechanized charging system, which is generally used in foreign countries, have recently introduced and gradually increased in Korea. The Bulk Emulsion are safe and able to increase the charging density for improvement of fragmentation and advancement especially in tunneling, and minimizing environmental problem. Because of less toxic gas generation, the explosives are called, namely ech-friendly products. There are two kinds of Bulk Emulsion; one is for open cut and the other is for tunneling. According to features of blast sites and its purpose, the compositions are different, but the principle is the same. In this study, trial blasts using Bulk Emulsion for tunneling had executed at 10 sites in Korea. The major result of the major job-sites is the following. First of all, compared with cartridge explosive, Bulk Emulsion was able to increase its charging density up to $35{\sim}60%$, to decrease the blast holes to approximately $10{\sim}30%$ down, and the advancement was improved up to $8{\sim}20%$ and also 30% up in its fragmentation. Toxic gas production after cartridge blasting showed 34.44ppm of its CO. Bulk Emulsion, however, showed 20.13ppm, which was 58.45% production of the cartridge explosive, and NOx was below 2ppm. The mechanized charging system of Bulk Emulsion should be applied to large sized tunnel blasting, long advanced tunnel which can secure the advancement of over $4{\sim}5m$, and the sites required finishing rapidly.

A Case Study of Minimizing Construction Time in Long and Large Twin Tube Tunnel (대단면 장대터널 공기단축 사례연구)

  • No Sang-Lim;Noh Seung-Hwan;Lee Sang-Pil;Kim Moon-Ho;Seo Jung-Woo
    • Tunnel and Underground Space
    • /
    • v.15 no.3 s.56
    • /
    • pp.177-184
    • /
    • 2005
  • The Sapaesan tunnel, the longest twin tube tunnel (4km) in Korea with 4 lanes each, is under construction with two years of delayed schedule because of the strong opposition from environmental bodies. Therefore, maximizing the construction efficiency was needed in tunnel project to compensate for time delay. This study includes improvements in the construction of the Sapaesan tunnel such as increasing excavation length and changing excavation sequence. In this paper the system for predicting tunnel face ahead is also introduced. Bulk-Emulsion explosive and Cylinder-Cut method were adopted in tunnel blasting to increase the excavation length. Optimum tunnel excavation step was designed to make up delayed time. Tunnel foe mapping, TSP survey and geological prediction system using computerized jumbo-drill were performed fnr safe construction of long and large twin tube tunnel.