• Title/Summary/Keyword: Curve Track

Search Result 184, Processing Time 0.031 seconds

Characteristics of Curved Track Behaviors according to Traveling Tilting Train (틸팅차량 주행에 따른 기존선 곡선 궤도의 거동 특성)

  • Park, Yong-Gul;Choi, Jung-Youl;Sung, Deok-Yong;Chun, Dae-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.692-700
    • /
    • 2007
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the curve section, which is vulnerable to accelerated train speed. The analysis of tilting train test running the part of Chungbuk line and Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the movement behavior of each part of track while tilting train, high speed train and traditional train (Mugunghwa and freight train) were running the existing line, wheel load, lateral wheel load, rail bending stress, vertical and lateral displacement of rail and vertical displacement of sleeper were compared and analyzed so as to evaluate the expected impact by tilting train for improving the train speed.

Technologies for improving the running safety of a tram operating on the concrete embedded track (콘크리트 매립형 궤도를 운행하는 트램의 주행안전성 향상 기술)

  • Seo, Sung-il;Mun, Hyung-Suk;Kim, Sun-Chun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.10
    • /
    • pp.717-724
    • /
    • 2017
  • To improve the running safety of a tram operating on a concrete embedded track, a bogie, the core system of the tram, was developed and fabricated. After it was integrated with the prototype car body, a short distance track with a sharp curve and steep gradient was constructed for the test operation. A formula to check the interference of the wheel flange with the track during running was proposed. Based on the results provided by the formula, the track was designed. Another simple formula was derived to estimate the derailment quotient and the wheel unloading ratio. During running on the track, the acceleration of the car body was measured and the interface status between the wheel and the track was monitored by a video system. According to the results calculated by these simple formulas, the derailment quotient and wheel unloading ratio were estimated to be within the safety criteria. In the actual test, no derailment occurred and the measured acceleration satisfied the criteria. Also, there was no interference between the wheel and track. The video monitoring results showed no signs of derailment, such as the climbing of the wheel. The pinion in the center showed good running safety, contacting smoothly with the rack. The measurements of environmental noise proved that the criteria were satisfied.

The study of wheel unloading change in case of tilting actuation (틸팅차량의 곡선부 틸팅동작 시 윤중감소율 병화에 대한 고찰)

  • Kim Nam-Po;Kim Jung-Seok;Oh Il-Geun
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.435-442
    • /
    • 2004
  • Tilting train allow the train to pass curve at higher speed without affecting passenger comfort. As the tilting trains run curve track about 30$\%$ higher than non-tilting trains, the centrifugal force and dynamic force will be higher. Therefore it is very important for tilting train to ensure safety against derailment, and to reduce the lateral track forces by applying light-weight design, optimized suspension design and steering mechanism. The 180 km/h Korean Tilting Train(TTX) which is now developing as a part of the Korean National R & D project, was designed and analytically verified to meet these special requirements. This paper describes the analytic study to verify the safety against derailment, especially on the wheel unloading in case of tilting actuation. The severest curve geometry and curving speed was assumed, the tilting control pattern was also assumed as trapezoidal force function applied to tilting bolster and bogie frame. For the comparison, the operation with the speed of tilting train without tilting actuation was numerically simulated and the operation with the balanced speed without tilting actuation was also numerically simulated. Through the numerical simulation of various operating case, we found that derailment quotients, wheel unloading and Q/P was not affected by tilting actuation and that the bogie of TTX was nicely designed to satisfy the safety against the derailment.

  • PDF

A Study on the Safety Braking Distance in ATP System (ATP시스템의 안전제동거리에 대한 연구)

  • Kim, Min-Kyu;Kim, Min-Seok;Kim, Jong-Soo;Yun, Yu-Boem;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.132-139
    • /
    • 2011
  • ATP(Automatic Train Protection) system in railroad signalling system is on-board signalling system which is controlled by train control information such as location and speed of trains. Safety is ensured by transmitting the train control information between on-board and wayside device in the ATP system. When an engineer disregards the speed limit on a tachometer, the train is automatically stopped by the on-board device. Recently, the studies of increasing speed of the train have been developed. Eurobalise in ERTMS/ETCS system is used in case that speed of trains is up to 500[km/h]. A study of safety braking distance is needed by increasing the speed of train in the ATP system. Train data and track data are required to calculate the safety braking distance. The train data includes formations of trains, length of trains, service brake and emergency brake etc. Also, the track data includes slope of track, curve of track, length of track, speed limit etc. In this paper, the speed profile is computed by analyzing the train and track data in the ATP system. It is demonstrated by applying to subway line 2 in Seoulmetro through the on-site test.

  • PDF

A Study of Wheel Tread Spalling Problem of $DF_{21}$ Locomotive

  • Weihua, Ma;Shihui, Luo
    • International Journal of Railway
    • /
    • v.1 no.2
    • /
    • pp.31-36
    • /
    • 2008
  • $DF_{21}$ diesel locomotive was designed to satisfy the requirement of Kunming Meter track and the 2Co self-guided radial bogie was used to suit the complex curve track. There are totally 12 locomotives was served on the track. The first two locomotives were devotion running on the track since April 2003, the wheel tread splling was occurred on the middle wheel set of the two locomotives after running nearly 150 thousands km on the track of the two locomotives at August 2004. The dynamic analysis was carried out to find the reason. The wheel set longitudinal vibration resonance phenomenon was existed on the locomotive dynamic performance, and this was caused by the too big longitudinal stiffness of the journal box bar on the middle wheel set. Wheel set longitudinal vibration resonance maybe an important reason of lead to wheel tread spalling. The corresponding mend methods were put forward from the point of view of wheel set longitudinal vibration resonance. All the wheel tread of the 12 locomotives on the middle wheel set were in good condition and not occurred the wheel tread spalling after the mend till December 2007 after 350 thousands km were finished. The mechanism of the wheel tread splling and corresponding mend method was discussed in detail in this paper.

  • PDF

Influence of Initial Clamping Force of Tension Clamp on Performance of Elastic Rail Fastening System (텐션클램프의 초기 체결력이 탄성레일체결장치의 성능에 미치는 영향)

  • Lee, Dong Wook;Choi, Jung Youl;Baik, Chan Ho;Park, Yong Gul
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.3
    • /
    • pp.1243-1251
    • /
    • 2013
  • The purpose of this study is to investigate the influence of initial clamping force of tension clamp on the performance of an elastic rail fastening system used in sharp curve track. In this study, the initial clamping force and the increasing lateral wheel loads were conducted in the analytical and experimental study, i.e., finite element analysis, laboratory and field test. Using the analytical and experimental results, the performance of the tension clamp was investigated. It was found that the stress of tension clamp depends on the initial clamping force. Therefore the initial clamping force appeared to directly affect the compression stress of the tension clamp. It was found that the compression stress of tension clamp was transferred to the tensile stress by applied the lateral wheel load in service sharp curve track. Further, it was concluded that the initial clamping force was applied on the strengthening force for the tension clamp and then the appropriate initial clamping force was important to ensure a stable performance and long term endurance of tension clamp.

Stability Evaluation of Track on Conventional Line According to Traveling Tilting Train (틸팅차량 주행에 따른 기존선 궤도의 주행안정성 평가)

  • Park, Yong-Gul;Eum, Ki-Young;Choi, Jung-Youl;Sung, Deok-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.6
    • /
    • pp.701-708
    • /
    • 2007
  • A tilting train, which was developed to run the curve section without reducing the speed and compromising the riding quality, can improve the speed so as to reduce the travel time, compared to the existing trains. Then the force generated by the train operation to the track is in proportion to train operation speed, which means the track shall bear the increased force as much as the increase in train operation speed. Particularly, wheel load and lateral wheel load generated by train operation and distributed to the rail tend to cause the track to suffer the strain and furthermore the severe disaster such as derailment. To deal with such problem and ensure the train will run safety and stably, the tolerance in wheel load change, lateral wheel load and derailment coefficient was determined for quantitative evaluation of the train operation stability. In this study, derailment coefficient of inner and outer rail at existing curve section of tilting train was determined to evaluate the curve radius, possibility of acceleration and the need of rail improvement, which was then compared with the existing traditional train and high speed train. Conducting the quantitative evaluation of dynamic wheel load and lateral wheel load of each train, which was based on field survey, derailment coefficient and static & dynamic wheel load change, which serve the evaluation criteria of train operation stability, were determined for comparison with the standards, thereby analyzing the stability of the tilting train.

Estimation of Bending Fatigue Life of CWR in Concrete Track (콘크리트궤도 장대레일의 휨 피로수명 평가)

  • Sung, Deok-Yong;Tae, Sung-Sik;Park, Kwang-Hwa;Kong, Sun-Yong;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.64-71
    • /
    • 2010
  • It is suggested that the service life of the continuous welded rail(CWR) is estimated by the relationship between the rail surface irregularity according to the accumulated passing tonnage and bending fatigue of welded part in CWR. In this study, based on the results of bending fatigue tests of rail and results of measuring tests in situ of rail bending stress, this study estimated the bending fatigue life of welded rail in concrete track, adopting a Haibach's rule. The bending fatigue life of CWR considered the rail surface irregularity, train speed and the S-N curve by types of rail welding. In addition, this study estimated it for the fracture probability 1%, 0.1%, 0.01%. Therefore, this study proposed bending fatigue life of CWR in concrete track.

  • PDF

A Study on Estimation of Fatigue Life of Aged Continuous Welded Rail using the Field Test (현장측정을 통한 노후 레일의 피로수명 평가에 관한 연구)

  • Kong, Sun-Yong;Sung, Deok-Yong;Kim, Jun-Hyung;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.352-364
    • /
    • 2007
  • It is essential to reduce track maintenance costs and to extend the periodic replacements of continuous welded rails based on accumulated passing tonnage. As recently train load decrease and rail joints wear down less, the periodic replacements of continuous welded rails can be extended. There are many kinds of rail damage like squat, head-check and corrugation. These can be taken nondestructive or naked eye test. So the periodic replacements of continuous welded rails based on accumulated passing tonnage were examine with focusing on a crack of rail bottom of continuous welded rail. Therefore, this study measure dynamic response of track by metro train load, it compute impact coefficient and track spring coefficient for estimating a condition of actual track system. Also, it is converted the measured stress waveform into stress frequency histogram by the rain-flow counting methods, and then the equivalence of stress is calculated. As apply s-n curve of a new welded rail, accumulated fatigue damage ratio of laid rail and remaining service lives is estimated. This study suggest a plan of the periodic replacements of continuous welded rails based on accumulated passing tonnage classified by the types of track system.

  • PDF