The present paper relates to an integration power system combining tidal power generation and ocean current power generation, and more particularly, to an integration power system combining a tidal power plant and two ocean current power parks, which is capable of increasing the operating rate of power facilities and efficiently generating electrical energy by using incoming seawater into the lake through turbine generators of a tidal power plant or fast flow of seawater discharged to a sea side through sluice gates of a tidal power dam. It is shown that the integration power system is a new promising ocean power system and the ocean current turbine generators in the ocean current power parks of the integration power system are smaller in size and larger in power generation capacity compared with the tidal current turbine generators in the ocean.
The current power generation is very suitable renewable energy for the application to Korean western and south coastal regions where characterized as having high current speed. Being different from tidal power generation that needs tremendous dam structure to preserve water, the current power generation utilizes the ocean current flow without damaging to estuary area and its environment. There are still many areas to understand the characteristics of current power generation for the actual field installation. As designing muti module with several rotors, the interaction between rotors will occur that would affect the efficiency and RPM of each rotor. In this study, the interactions caused by gaps between rotors in multi module are studied.
Maximum Power Point Tracking (MPPT) control needs to generate the maximum power of a tidal current turbine. A tidal current speed sensor is required to achieve effective generated power in a tidal current generation system. The most common methods used to achieve such power is the tip speed ratio of turbine and tidal current information. However, these methods have disadvantages, such as expensive installation of the tidal current sensor, parameter errors in turbine design, and different information according to the installed position of the tidal current sensor. This paper proposes a maximum power control scheme using perturb-and-observe (P&O) for tidal current generation system. The proposed P&O MPPT scheme can achieve the maximum power without tidal current sensors and turbine design parameters. The reliability and suitability of the proposed control scheme are proven through simulation and experiment results at the tidal current generation laboratory.
The digital current differential relaying scheme is widely used for primary protection of 765(kV) power transformer. The current differential relay pickup the internal fault at the threshold which is set at 30% of rating current. Margin of 30% include current transformer error 5%, relay error 5%, on load tap changer error 7% and margin factor 140% obtained from the field experience. In this paper transformer protection relay and relay setting rule of high voltage power system are discussed. And we verify the correctness of relay setting rule with current differential relay using Matlab simulation.
Grid connected transformerless solar power generation system is frequently used with the benefits of cost and efficiency. However, significant DC leakage current can flow from the DC line into the ground with dielectric breakdown in the transformerless solar power generation system. The leakage current occurred in the DC line causes accidents such as fire and electric shock on human. To resolve this problem, high sensitivity DC leakage current sensor is needed. But recently the studies on safety of DC line are not performed. In this paper, a high sensitivity DC leakage current sensor that can detect DC leakage current in solar power generation system, is proposed. Based on the studies, DC leakage current sensor is fabricated and characteristic tests are carried out. Finally, the accuracy of sensor performance is verified by leakage current experiments in solar power generation system.
In this study, we have investigated the effect of the solar power generation facilities on the power quality of interconnected solar power generation system. When the solar power generation facility was connected to the distribution system, whether the solar power generation is under operation or not, Peak factor of current was increased to 0.033[%], Frequency is deviated from $60{\pm}0.2$[Hz] and also Short term flicker indication($P_{st}$) increased to 0.213[p.u.] compare with the disconnected situation. Harmonic current [%] in orders was 11.42[%] maximum under 11th orders and was 7.861[%] between 11th and 17th orders. These values were about 3 or 4 times compared with "the power system interconnection technique standards" at the same situation above. Therefore, we could confirmed that the solar power generation facility, when it was connected to the existing distribution system, made bad influence on the power qualities such as the peak factor of current, frequency regulation, short term flicker indication($P_{st}$) and harmonic current [%] in orders etc.
Recently, renewable energy has been increasing in Korea to reduce greenhouse gas, and solar power generation, which accounts for the largest proportion of renewable energy, is noteworthy. The government policy will further increase solar power generation. In order to implement the policy, it is important to understand the current status of domestic solar power generation facilities. Therefore, the current status of solar power generation facilities in Jinju city close to the south coast and Jeonju city close to the west coast was investigated and compared. By 2020, 618 solar power plants had been installed in Jeonju city and 269 in Jinju city. However, there is not much difference in the amount of solar power generation for business at 9 GWh. The reason is that Jinju city has a lower population density than Jeonju city, so there are enough places to install a large-scale solar power facilities with a large power generation capacity. Monthly solar power generation was the highest in April in both Jeonju city and Jinju city and the lowest in January. In particular, in December, Jinju city showed more solar power generation than Jeonju city because of the large amount of insolation, long sunshine hours, and few clouds.
In this paper present Autonomous Adaptive Digital Over Current Relay which acts autonomous setting using voltage and current measured by relay in the change of power systems. Automation of relay setting is required for distribution automation although manual relay setting is used at present. This paper presents Autonomous Relay Setting which knows change of the power system and acquires setting element using the Recursive Least Squares. Relay setting is very difficult work. But proposed relay is expected to decrease burden of relay setting using acquired information of power system change and autonomous setting. Also fast protective ability is expected according to change of power system.
There are several advantages to make use of a bridge pier for the tidal power generation. Current velocity increases near the pier, therefore the tidal power generation becomes more efficient because the power is proportional to the cubic of the current velocity. The pier is convenient for access and maintenance of the hydraulic turbine and the power unit. The project is now underway at the Ikitsuki Bridge in Tatsuno-Seto Strait of Nasasaki Prefecture, where the tidal current was measured by the bottom mount ADCP for almost one year. Model experiments for a Darrieus water turbine with two and three straight blades were carried out in the circulating water channel, in which the power coefficients of the turbine were obtained as a function of blade section and the attaching angle of a blade to the rotor. Those experimental results are discussed to obtain an optimum Darrieus turbine for tidal power generation.
Park, M. S.;P. S. Cho;Lee, S. J.;S. H. Hyun;Kim, K. H.
KIEE International Transactions on Power Engineering
/
제2A권3호
/
pp.83-88
/
2002
An over current relay(OCR), one of the most frequently used protective devices, has time-current characteristics (TCC) to control its trip time according to the current level. It is because an appropriate operating time interval is necessary for coordination with other protective devices. A set of TCC curves of an OCR is, in general, given by the supplier from which a curve is selected by the operator. Therefore, in many cases, it is impossible to consider the operation condition of the given power system exactly. A novel concept of an OCR is suggested in this paper. The proposed OCR has an internal correction module so that it may produce the most adequate TCC curve according to the given protective information for coordination with other devices. With the generated TCC curve, a variety of operation and coordination conditions can be taken into consideration in an effective manner. The suggested OCR is applied to a simple test power system to show very promising results from a coordination point of view.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.