• Title/Summary/Keyword: Cross Flow

Search Result 2,040, Processing Time 0.032 seconds

Estimating the Dimension of a Crosswalk in Urban Area - Focusing on Width and Stop Line - (도시부 횡단보도 제원 산정에 관한 연구 - 폭과 정지선을 중심으로 -)

  • Kim, Yoomi;Park, Jejin;Kwon, Sungdae;Ha, Taejun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.847-856
    • /
    • 2016
  • Recently, with a high level of economic growth, rapid urbanization, population, environment and housing problems were accompanied in Korea. In particular, the traffic problem has become a serious social problem. As the current transportation policy has been carried out, concentrating on traffic flow, in 2015, death rate for pedestrians while walking (1,795 persons) is 38.8% compared to entire death rate in car accident (4,621 persons), so there is need to solve it. Although, crosswalk should make pedestrian cross it safely, it has been made on the basis of the width of road without exact standard for current width of the crosswalk and the location of stop line. Moreover, in the area around many campuses or commercial facilities, crosswalks are set with not considering pedestrian passage, but designed uniformly. Therefore, the purpose of this study is to estimate reasonable dimension of crosswalk considering pedestrian traffic and walking speed and it makes the accident rate lower in the crosswalk, which has a lot of problems including decisions of vehicle traffic signal time, lack of pedestrian's signal timing, pedestrian's crossing of long-distance. The following are the methodology of the study. Firstly, for crosswalk calculation of specifications, examination relating existing regulations and researches dealing with crosswalk, pedestrians and stop line is needed. After analyzing problems of current width of crosswalk and stop line, present the methodology to calculation of specifications and basing on these things, calculation of specifications for crosswalk will be decided. In conclusion, the calculation of specification and improvement of stop line for crosswalk laid out in this study are expected to be utilized as base data in case of establishing relevant safety facilities and standards.

Characteristics of Channelbed and Woody Debris on Mountainous Stream (산지급류소하천(山地急流小河川)에 있어서 하상미지형(河床微地形)과 유목(流木) 특성(特性))

  • Chun, Kun-Woo;Kim, Min-Sik;Park, Wan-Geun;Ezaki, Tsugio
    • Journal of Korean Society of Forest Science
    • /
    • v.86 no.1
    • /
    • pp.69-79
    • /
    • 1997
  • The purpose of this study is to acquire essential data to reduce the amount of woody debris resulted from the debris flow. This research examined topographic characteristics of the channelbed affecting generation, movement and storage of woody debris and woody characteristics related to number, sizes, shapes, decay, storage direction to mountainous stream. 1. The number of woody debris had a tendency to increase in proportion to stream width, but it was hardly affected by longitudinal gradient of stream. Especially, the greater amount of woody debris was stored at wide section of the stream with compound channel, and it was found in deposits of channelbed rather than in the present channel. 2. Total woody debris over 10cm in diameter and over 2m in length was 402 units and storage number was 35.3 units per 100m of stream. Average diameter of breast height and length were 14cm and 4m, respectively. The woody debris appeared shorter in length and greater in diameter at down-stream than up-stream. 3. Since woody debris met sediments and bed-materials of great roughness in moving, the greater amount of woody debris without root was found in up-stream and down-stream, but deformed woody debris was discovered in upper stream. Decay of woody debris was more severe in down-stream and woody debris on rotting process was found down-stream. 4. Storage direction of woody debris was mainly parallel to center line of stream, and rate of parallel and perpendicularity was 276 and 126 units, respectively. But, as woody debris storing to the perpendicular direction was unstable, the traveling debris could easily be stored. Therefore, some counterplan was required to prevent the traveling woody debris. 5. Tree species of woody debris was mainly larch, which occupied about two third of total woody debris(256 units). The woody debris of larch is easy to move due to hitting of channelbed materials or lower channelbed fluctuation because the lower part of larch is weaker than its upper part. Therefore, the section of the tree species planting in the riparian vegetation needs much more carefulness.

  • PDF

A Experimental Study on Exclusion Ability of Riprap into Bypass Pipe (저층수 배사관 내 유입된 사석 배출능력에 대한 연구)

  • Jeong, Seok Il;Lee, Seung Oh
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.1
    • /
    • pp.239-246
    • /
    • 2017
  • There are various transversal structures (small dams or drop structures) in median and small streams in Korea. Most of them are concrete structures and it is so hard to exclude low-level water. Unless drainage valves and/or gates would not be installed near bottom of bed, sediment from upstream should be deposited and also contaminants attached to the sediments would devastatingly threaten the water quality and ecosystem. One of countermeasures for such problem is the bypass pipe installed underneath the transversal structure. However, there is still issued whether it would be workable if the gravels and/or stones would roll into and be not excluded. Therefore, in this study, the conditions to exclude the rip stone which enter into the bypass pipe was reviewed. Based on sediment transport phenomenon, the behavior of stones was investigated with the concepts from the critical shear stress of sediment and d'Alembert principle. As final results, the basis condition (${\tau}_c{^*}$) was derived using the Lagrangian description since the stones are in the moving state, not in the stationary state. From hydraulic experiments the relative velocity could be obtained. In order to minimize the scale effect, the extra wide channel of 5.0 m wide and 1.0 m high was constructed and the experimental stones were fully spherical ones. Experimental results showed that the ratio of flow velocity to spherical particle velocity was measured between 0.5 and 0.7, and this result was substituted into the suggested equation to identify the critical condition wether the stones were excluded. Regimes about the exclusion of stone in bypass pipe were divided into three types according to particle Reynolds number ($Re_p$) and dimensionless critical shear force (${\tau}_c{^*}$) - exclusion section, probabilistic exclusion section, no exclusion section. Results from this study would be useful and essential information for bypass pipe design in transveral structures.

Change of Pulmonary Artery Hemodynamics and Pulmonary Vascular Resistance in Experimental Pulmonary Embolism (실험적 급성 폐색전증에서 폐동맥혈역학 및 폐혈관저항의 변화)

  • Chung, Hee-Soon;Lee, Jae-Ho;Kim, Cheol-Ho
    • Tuberculosis and Respiratory Diseases
    • /
    • v.42 no.6
    • /
    • pp.913-922
    • /
    • 1995
  • Background: When we define the pressure of pulmonary vasculature in which a recruitment of blood flow occurs as $P_I$ and the proportion of change in pulmonary artery to that in cardiac output as IR and then we compare PI and IR with pulmonary vascular resistance, we would find some problems in pulmonary vascular resistance. In other words, it is the theory that, IR should be increased mainly in pulmonary embolism in which decreases the cross sectional area of pulmonary vasculature. But there are many contradictory reports resulted from various researches and the fact is known widely that any difference exists between PVR and PI, IR. For this reason, the purpose of this study is to observe how PI and IR change at the time of the outbreak and during treatment of the pulmonary embolism, and to find out the meaning of these new indicators and the difference from the pulmonary vascular resistance used generally when we subdivide the pulmonary vascular resistance into PI and IR. Method: After making AV fistula in experimental dog, we controlled cardiac output at the intervals of 15 minute in case of three kinds(all AV fistula are obstructed, only one of fistula is open and all of fistula is open), and after evoking massive pulmonary embolism with radioactive autologous blood clots, we measured the mean pulmonary artery pressure, and calculated PI and IR. We observed the pattern of change in PI and IR, without giving the control group any specific treatment and with injecting intravenously rtPA in the Group 1 and Group 2 at the dose of 1mg per kg, for 15 minutes fot the former and 3 hours for the latter. Result: 1) Pulmonary vascular resistance showed a change similar to that of pulmonary artery pressure and in all three group, PVR increased significantly, but group 1 and group 2 showed tendency that PVR keeps on decreasing after treatment, and the rate of decrease in group 1 is more rapid than group 2 significantly. 2) Both intersection(PI) and degree(IR) are proved statistically significant, in view of the straight line relationship between cardiac output and pulmonary artery pressure, calculated by minimal regression method. 3) PI changed similarly to pulmonary vascular resistance, while in the IR which is theoretically more similar to PVR, there was no significant difference or change after rtPA infusion. Conclusion: In the pulmonary embolism, Both change in IR which means real resistance of pulmonary vasculature and PI which was developed due to secondary vasoconstriction by pulmonary embolism are reflected same time.

  • PDF

Evaluation of Pollen Viability of Nakdongbyeo, Two Transgenic Rice Lines, Its Hybrids with Weedy Rice, and Subsequent Selfed Progenies: F2 and F3 (낙동벼, 2개의 promoter를 각각 삽입한 유전자변형 계통과 잡초성벼(Oryza sativa)인공수정 한 후 다음세대인 F1, F2, F3의 화분활력 평가)

  • Ghimire, Sita Ram;Sohn, Eun-Young;Shin, Dong-Hyun;Lee, In-Jung;Kim, Kil-Ung
    • Journal of Life Science
    • /
    • v.19 no.7
    • /
    • pp.839-844
    • /
    • 2009
  • This experiment was conducted to evaluate pollen viability of Nakdongbyeo, transgenic rice lines, an F$_1$ hybrid from a cross between Milyang weedy rice and ABC-promoter transgenic rice line containing basta-resistant (bar) gene and subsequent selfed progenies, F$_2$ and F$_3$. The reaction of pollen with 3-{4,5 dimethylthiazolyl-2}-2,5-diphenyl monotetrazolium bromide (MTT) as a staining chemical immediately after pollen shedding showed maximum pollen viability of 86% in Nakdongbeyo, 75% in ABC-promoter transgenic rice line, 62% in ubiquitin-promoter transgenic line, 68% in F$_1$, 79% in F$_2$ and 78% in F$_3$. Viability gradually declined during subsequent observations at 20-minute intervals. However, there was a drastic decline in pollen viability after 40 minutes of pollen shedding. The mean difference of pollen viability among rice lines and time was highly significant, indicating significantly different pollen viabilities at different time intervals. Maximum viability of 36.2% was observed in F$_3$ and minimum viability of 3.5% was found in F$_2$ at 90 min after pollen shedding. Results of this experiment on pollen viability and longevity elucidate potential risks of pollen-mediated flow of herbicide-resistant gene from transgenic rice lines and possible integration of it into the weedy rice population.

Selectivity and Permeability Characteristics of Pure CO2 and N2 Gases through Plasma Treated Polystyrene Membrane (플라즈마 처리된 폴리스티렌 막을 통한 순수한 CO2 와 N2 기체의 선택·투과 특성)

  • Hwang, Yui-Dong;Shin, Hee-Yong;Kwak, Hyun;Bae, Seong-Youl
    • Korean Chemical Engineering Research
    • /
    • v.44 no.6
    • /
    • pp.588-596
    • /
    • 2006
  • The surface of polystyrene membrane treated by Ar, $O_2$ plasma, and the effects were observed before and after the treatment and permeability of $CO_2$, $N_2$ and selectivity of $CO_2$ relative to $N_2$ was measured using continuous flow gas permeation analyzer (GPA). The mole ratio of O over C in the surface was increased from 0 to 0.179 with Ar plasma treatment and route mean square of surface was increased from $15.86{\AA}$ to $71.64{\AA}$. Therefore the contact angle was decreased from $89.16^{\circ}$ to $18.1^{\circ}$. Thus Plasma treatments made surface of membrane tend to be highly hydrophilic. The optimum condition for the $CO_2$ permeability and ideal selectivity of the plasma treated membrane was as follows: the measurement of Ar (60 W, 2 min, $70^{\circ}C$) plasma treatment was $1.14{\times}10^{-12}[m^3(STP){\cdot}m/m^2{\cdot}sec{\cdot}atm]$ and 4.22. In the case of $O_2$ plasma treatment, the contact angle was decreased at $13.56^{\circ}$ with increase of O/C ratio ($0.189{\AA}$) and route mean square of surface ($57.10{\AA}$). The optimum condition for the $CO_2$ permeability and ideal selectivity of the plasma treated membrane was as follows: the measurement of $O_2$ (90 W, 2 min, $70^{\circ}C$) plasma treatment was $7.1{\times}10^{-12}[m^3(STP){\cdot}m/m^2{\cdot}sec{\cdot}atm]$ and 11.5. After plasma treatment, the changes of membrane surface were all subtly linked with both cross-linking and etching effects. Finally, it was confirmed that the gas permeation capacity and selectivity of the modified membrane with plasma could be improved by an appropriate control of the plasma conditions such as treatment time, the power input and sort of plasma gas.

Influences of Histamine on Permeability across Blood-brain Barrier (혈액-뇌장벽 투과성에 대한 히스타민의 영향)

  • Kim, Kee-Jin;Shin, Dong-Hoon
    • The Korean Journal of Physiology
    • /
    • v.2 no.2
    • /
    • pp.33-43
    • /
    • 1968
  • Histamine, 0.5 mg as histamine base in 4 ml of normal saline solution, was injected into rabbits anesthetized with nembutal and the mean blood pressure was kept in the range of $52{\sim}80\;mmHg$ for over one hour by supplemental additions. Following the injection of the test substances, 300 mg of urea and 200 mg of antipyrine intravenously, serial blood samples were obtained from the femoral artery and the internal jugular vein at $0.5{\sim}3$ minutes interval. The decreasing patterns in the concentrations of arterial and venous blood plasma samples were compared with each other. The ratio of the concentration of brain tissue to that of the final arterial plasma was also studied. By these measures the degrees of penetration of the test substances in the brain in the control and in the histamine treated rabbits were observed. The concentrations of antipyrine and urea in the arterial blood plasma were decreasing exponentially with respect to the time elapsed. The venous concentrations were anticipated to increase initially and to cross the arterial concentration curve in the point of equlibrium between the plasma and the tissue. On the contrary to the expectation venous concentration also revealed the decreasing tendency similar to that of arterial plasma. The similarity between these two curves, arterial and venous, would be atributable to the fact that the cerebral blood flow rate was large enough and the rising phase in the venous concentration curve was instantly over before serial blood samples were taken. Inspite of some similarity in the decreasing tedency in both concentration curves there were appreciable discrepancies between the arterial and venous plasma which would reflect the situation far from the equlibria among several compartments in the brain. Changes in plasma potassium levels caused by the injection of histamine or bleeding were observed, too. Using 8 rabbits as the control and 12 rabbits for the histamine treated group following results were obtained: 1. Both of the concentration curves, arterial and venous, declined rapidly at_first and slowly later on and approached same equilibrium concentration with the passage of time after a single injection. The time at which attained the same concentration was $2.0{\pm}0.54\;min.$ in the control and $4.3{\pm}1.92\;min.$ in the histamine treated group with respect to antipyrine. On the other hand in the case of urea they were $2.4{\pm}0.59\;min.$ in the control and $4.4{\pm}1.31\;min.$ in the histamine group, respectively. In the histamine treated group enlarged spaces for distribution of test substances were postulated. 2. The concentration of antipyrine in the brain tissue water revealed no significant differences between the control and experimental groups, showing $212{\pm}40.2\;mg/l$ in the control and $206{\pm}64.1\;mg/l$ in the histamine treated group. On the other hand urea revealed higher value in the histamine treated group than in the control, showing an enhanced penetration of urea into the tissue after injection of histamine. Urea concentration in the brain water was $32.3{\pm}3.36\;mg%$ in the control and $39.2{\pm}4.25\;mg%$ in the histamine treated group. 3. The distribution ratio of antipyrine in the brain tissue was very close to unity in the histamine treated animals as well as in the control. 4. The average of the distribution ratio of urea in the control animals was 0.77 and it showed the presence of blood-brain barrier with regard to urea. However in the histamine treated animals the distribution ratios climbed up to 0.86 and they were closer to unity than in the control animals. Out of 12 cases 5 were greater than 0.9 and 8 exceeded 0.85. It appeared that histamine enhanced the penetration of urea through the barrier. 5. Histamine injection and or hemorrhage caused an elevation of the concentration of potassium in plasma. In the event that histamine and hemorrhage were applied together the elevation of potassium exceed the elevation seen at the histamine alone. There was no evidence that the leakage of potassium from the brain tissue was dominant in comparison with the general leakage from the whole body.

  • PDF

How effective has the Wairau River erodible embankment been in removing sediment from the Lower Wairau River?

  • Kyle, Christensen
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.237-237
    • /
    • 2015
  • The district of Marlborough has had more than its share of river management projects over the past 150 years, each one uniquely affecting the geomorphology and flood hazard of the Wairau Plains. A major early project was to block the Opawa distributary channel at Conders Bend. The Opawa distributary channel took a third and more of Wairau River floodwaters and was a major increasing threat to Blenheim. The blocking of the Opawa required the Wairau and Lower Wairau rivers to carry greater flood flows more often. Consequently the Lower Wairau River was breaking out of its stopbanks approximately every seven years. The idea of diverting flood waters at Tuamarina by providing a direct diversion to the sea through the beach ridges was conceptualised back around the 1920s however, limits on resources and machinery meant the mission of excavating this diversion didn't become feasible until the 1960s. In 1964 a 10 m wide pilot channel was cut from the sea to Tuamarina with an initial capacity of $700m^3/s$. It was expected that floods would eventually scour this 'Wairau Diversion' to its design channel width of 150 m. This did take many more years than initially thought but after approximately 50 years with a little mechanical assistance the Wairau Diversion reached an adequate capacity. Using the power of the river to erode the channel out to its design width and depth was a brilliant idea that saved many thousands of dollars in construction costs and it is somewhat ironic that it is that very same concept that is now being used to deal with the aggradation problem that the Wairau Diversion has caused. The introduction of the Wairau Diversion did provide some flood relief to the lower reaches of the river but unfortunately as the Diversion channel was eroding and enlarging the Lower Wairau River was aggrading and reducing in capacity due to its inability to pass its sediment load with reduced flood flows. It is estimated that approximately $2,000,000m^3$ of sediment was deposited on the bed of the Lower Wairau River in the time between the Diversion's introduction in 1964 and 2010, raising the Lower Wairau's bed upwards of 1.5m in some locations. A numerical morphological model (MIKE-11 ST) was used to assess a number of options which led to the decision and resource consent to construct an erodible (fuse plug) bank at the head of the Wairau Diversion to divert more frequent scouring-flows ($+400m^3/s$)down the Lower Wairau River. Full control gates were ruled out on the grounds of expense. The initial construction of the erodible bank followed in late 2009 with the bank's level at the fuse location set to overtop and begin washing out at a combined Wairau flow of $1,400m^3/s$ which avoids berm flooding in the Lower Wairau. In the three years since the erodible bank was first constructed the Wairau River has sustained 14 events with recorded flows at Tuamarina above $1,000m^3/s$ and three of events in excess of $2,500m^3/s$. These freshes and floods have resulted in washout and rebuild of the erodible bank eight times with a combined rebuild expenditure of $80,000. Marlborough District Council's Rivers & Drainage Department maintains a regular monitoring program for the bed of the Lower Wairau River, which consists of recurrently surveying a series of standard cross sections and estimating the mean bed level (MBL) at each section as well as an overall MBL change over time. A survey was carried out just prior to the installation of the erodible bank and another survey was carried out earlier this year. The results from this latest survey show for the first time since construction of the Wairau Diversion the Lower Wairau River is enlarging. It is estimated that the entire bed of the Lower Wairau has eroded down by an overall average of 60 mm since the introduction of the erodible bank which equates to a total volume of $260,000m^3$. At a cost of $$0.30/m^3$ this represents excellent value compared to mechanical dredging which would likely be in excess of $$10/m^3$. This confirms that the idea of using the river to enlarge the channel is again working for the Wairau River system and that in time nature's "excavator" will provide a channel capacity that will continue to meet design requirements.

  • PDF

Dataset of Long-term Investigation on Change in Hydrology, Channel Morphology, Landscape and Vegetation Along the Naeseong Stream (II) (내성천의 수문, 하도 형태, 경관 및 식생 특성에 관한 장기모니터링 자료 (II))

  • Lee, Chanjoo;Kim, Dong Gu;Hwang, Seung-Yong;Kim, Yongjeon;Jeong, Sangjun;Kim, Sinae;Cho, Hyeongjin
    • Ecology and Resilient Infrastructure
    • /
    • v.6 no.1
    • /
    • pp.34-48
    • /
    • 2019
  • Naeseong Stream is a natural sand-bed river that flows through mountainous and cultivated area in northern part of Gyeongbuk province. It had maintained its inherent landscape characterized by white sandbars before 2010s. However, since then changes occurred, which include construction of Yeongju Dam and the extensive vegetation development around 2015. In this study, long-term monitoring was carried out on Naeseong Stream to analyze these changes objectively. This paper aims to provide a dataset of the investigation on channel morphology and vegetation for the period 2012-2018. Methods of investigation include drone/terrestrial photography, LiDAR aerial survey and on-site fieldwork. The main findings are as follows. Vegetation development in the channel of Naeseong Stream began around 1987. Before 2013 it occurred along the downstream reach and since then in the entire reach. Some of the sites where riverbed is covered with vegetation during 2014~2015 were rejuvenated to bare bars due to the floods afterwards, but woody vegetation was established in many sites. Bed changes occurred due to deposition of sediment on the vegetated surfaces. Though Naeseong Stream has maintained its substantial sand-bed characteristics, there has been a slight tendency in bed material coarsening. Riverbed degradation at the thalweg was observed in the surveyed cross sections. Considering all the results together with the hydrological characteristics mentioned in the precedent paper (I), it is thought that the change in vegetation and landscape along Naeseong Stream was mainly due to decrease of flow. The effect of Yeongju Dam on the change of the riverbed degradation was briefly discussed as well.

Knowledge graph-based knowledge map for efficient expression and inference of associated knowledge (연관지식의 효율적인 표현 및 추론이 가능한 지식그래프 기반 지식지도)

  • Yoo, Keedong
    • Journal of Intelligence and Information Systems
    • /
    • v.27 no.4
    • /
    • pp.49-71
    • /
    • 2021
  • Users who intend to utilize knowledge to actively solve given problems proceed their jobs with cross- and sequential exploration of associated knowledge related each other in terms of certain criteria, such as content relevance. A knowledge map is the diagram or taxonomy overviewing status of currently managed knowledge in a knowledge-base, and supports users' knowledge exploration based on certain relationships between knowledge. A knowledge map, therefore, must be expressed in a networked form by linking related knowledge based on certain types of relationships, and should be implemented by deploying proper technologies or tools specialized in defining and inferring them. To meet this end, this study suggests a methodology for developing the knowledge graph-based knowledge map using the Graph DB known to exhibit proper functionality in expressing and inferring relationships between entities and their relationships stored in a knowledge-base. Procedures of the proposed methodology are modeling graph data, creating nodes, properties, relationships, and composing knowledge networks by combining identified links between knowledge. Among various Graph DBs, the Neo4j is used in this study for its high credibility and applicability through wide and various application cases. To examine the validity of the proposed methodology, a knowledge graph-based knowledge map is implemented deploying the Graph DB, and a performance comparison test is performed, by applying previous research's data to check whether this study's knowledge map can yield the same level of performance as the previous one did. Previous research's case is concerned with building a process-based knowledge map using the ontology technology, which identifies links between related knowledge based on the sequences of tasks producing or being activated by knowledge. In other words, since a task not only is activated by knowledge as an input but also produces knowledge as an output, input and output knowledge are linked as a flow by the task. Also since a business process is composed of affiliated tasks to fulfill the purpose of the process, the knowledge networks within a business process can be concluded by the sequences of the tasks composing the process. Therefore, using the Neo4j, considered process, task, and knowledge as well as the relationships among them are defined as nodes and relationships so that knowledge links can be identified based on the sequences of tasks. The resultant knowledge network by aggregating identified knowledge links is the knowledge map equipping functionality as a knowledge graph, and therefore its performance needs to be tested whether it meets the level of previous research's validation results. The performance test examines two aspects, the correctness of knowledge links and the possibility of inferring new types of knowledge: the former is examined using 7 questions, and the latter is checked by extracting two new-typed knowledge. As a result, the knowledge map constructed through the proposed methodology has showed the same level of performance as the previous one, and processed knowledge definition as well as knowledge relationship inference in a more efficient manner. Furthermore, comparing to the previous research's ontology-based approach, this study's Graph DB-based approach has also showed more beneficial functionality in intensively managing only the knowledge of interest, dynamically defining knowledge and relationships by reflecting various meanings from situations to purposes, agilely inferring knowledge and relationships through Cypher-based query, and easily creating a new relationship by aggregating existing ones, etc. This study's artifacts can be applied to implement the user-friendly function of knowledge exploration reflecting user's cognitive process toward associated knowledge, and can further underpin the development of an intelligent knowledge-base expanding autonomously through the discovery of new knowledge and their relationships by inference. This study, moreover than these, has an instant effect on implementing the networked knowledge map essential to satisfying contemporary users eagerly excavating the way to find proper knowledge to use.