• Title/Summary/Keyword: Crane ship

Search Result 122, Processing Time 0.028 seconds

Forecasting of Port Productivity to Response Very Large Container Ship (초대형 컨테이너선 기항에 대응하는 항만생산성 예측)

  • Choi Yong-Seok;Ha Tae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2005.10a
    • /
    • pp.319-325
    • /
    • 2005
  • The objective of this paper is to forecast the port productivity of container terminal to response very large container ship. In general, the productivity of container terminal is evaluated by productivity of stevedoring system including container cranes, yard cranes, and yard tractors. Therefore, we analyzed the current productivity of container crane as port productivity in Pusan ports and forecast net productivity and gross productivity of container cranes to handle the containers cf very large container ship. In order to improve the productivity, we summarize alternatives of stevedoring system and operation system.

  • PDF

A Genetic Algorithm Application for the Load Balancing of Ship Erection Process (조선 탑재일정의 부하 평준화를 위한 유전 알고리듬)

  • Min, Sang-Gyu;Moon, Chi-Ung;Lee, Min-Woo;Chung, Kuy-Hoon;Park, Ju-Chull
    • IE interfaces
    • /
    • v.13 no.2
    • /
    • pp.225-233
    • /
    • 2000
  • In this paper, we develope a genetic algorithm for the erection scheduling in shipbuilding. Erection, the final manufacturing stage of shipbuilding, involves the landing and joining of blocks at drydock. Since several ships are built simultaneously at the same drydock and they compete with the common constrained production resource such as labor, space, and crane, we should consider both ship-specifics and common resource constraints for the desirable erection scheduling. Ship erection should also satisfy the predetermined dock cycle given from higher level production planning. Thus, erection schedule of a ship can be represented as a PERT/CPM project network with its own deadline. Since production resources are shared, the erection scheduling become the so-called multi-project scheduling problem with limited resources, which can not be solved easily due to the large size of project network. We propose a function as a minimization of load index which represented the load deviation over time horizon considering the yard production strategy. For the optical parameter setting, we tried various experiments. We verified that the proposed approach was effective to deal with the erection scheduling problem in shipbuilding.

  • PDF

Physics-based Salvage Simulation for Wrecked Ship Considering Environmental Loads (환경 하중을 고려한 침몰 선체의 물리 기반 인양 시뮬레이션)

  • Ham, Seung-Ho;Roh, Myung-Il;Kim, Ju-Sung;Lee, Hye-Won;Ha, Sol
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.52 no.5
    • /
    • pp.387-394
    • /
    • 2015
  • Before salvaging a wrecked ship, the physics-based simulation is needed to predict lifting force before real operation by floating crane or barge. Procedures affecting lifting force for the salvage can be divided into three stages. At the first stage, the bottom breakout force for the wrecked ship to escape from seabed sediment should be calculated. At the second step, the current force acting on the wrecked ship while lifting from the seabed to near sea surface should be considered. Finally, buoyancy change near at the sea surface when the wrecked ship start to escape from the water should be considered. In the previous studies, only the breakout force at the first stage was calculated based on simple assumption of embedment depth and contact area of the wrecked ship. Therefore, we develop a program for salvage simulation including whole stages. It is composed of four modules such as the equations of motion, time integration, force calculation, and visualization. As a result, it is applied to simulate lifting the wrecked ship according to various environmental loads including seabed sediments.

Conceptual Design for Mooring Stability System and Equipments of Mobile Harbor (모바일하버 선박의 계류안정화시스템 및 의장장치 개념설계)

  • Lee, Yun-Sok;Jeong, Tae-Gwon;Jung, Chang-Hyun;Kim, Se-Won
    • Journal of Navigation and Port Research
    • /
    • v.34 no.5
    • /
    • pp.311-317
    • /
    • 2010
  • Mobile Harbor(MH) is a new paradigm for maritime transport system introduced in Korea, the target of which is to carry out ship-to-ship cargo operation rapidly and effectively even under a condition of sea state 3. A MH ship is moored alongside a large container vessel anchored at the defined anchorage and also equipped with gantry cranes for handling containers. The MH study concerned includes rapid container handling system, optimum design for floating structure, hybrid berthing & cargo operation system, design for cargo handling crane, etc. This paper is to deal with a conceptual design of a stabilized mooring system and mooring equipment under a condition of ship-to-ship mooring. In this connection, we suggest a positioning control winch system in order to control heave motions of the MH ship which is to add constant brakepower and stabilized function to an auto-tension winch and mooring equipment used currently in large container ships.

A Study on RFID Based Productivity Improvement of Container Terminals (RFID 기술을 활용한 컨테이너 터미널의 생산성 개선 방안 연구)

  • Park, Doo-Jin;Choi, Young-Bok;Kim, Hyun;Nam, Ki-Chan
    • Proceedings of the IEEK Conference
    • /
    • 2005.11a
    • /
    • pp.1071-1074
    • /
    • 2005
  • This paper suggests how can we guarantee terminal quality of service like ship waiting time ratio and ship residing time applying RFID(Radio Frequence IDentification) technology, raising up rapidly as a fundamental solution of new growing industry, to port information system. Also, lead time of whole port logistics can be decreased for reduction of loading & discharging time resulted from productivity improvement of G/C(Gantry Crane) and YT(Yard Tract) etc as applying RFID technology to terminal operation.

  • PDF

Conceptual Design of SMART HARBOR (스마트 하버의 개념설계)

  • Shin, Hyun-Kyoung;Kim, Min-Su
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.48 no.1
    • /
    • pp.84-92
    • /
    • 2011
  • This paper presents the primary conceptual design results of Smart Harbor. As the world trade becomes active, so container cargo volume is increasing constantly. Since the coming of very large container ships, It's necessary that a harbor handles many containers more than before. Therefore, we designed the new concept of SMART HARBOR which overcomes land site problem for port expansion and geographic constraints of very large container ships in harbor.

Real-time Job Reallocation Problem in Container Terminals (컨테이너 터미널의 효율적인 실시간 작업 재할당 연구)

  • Bak, Na-Hyun;Shin, Jae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2012.10a
    • /
    • pp.82-83
    • /
    • 2012
  • To achieve higher customer service, the operational efficiency of container terminal is important. So, to improve loading/unloading speed and reduce the time spending of berth, efficient ship planning is performed in advance. But, the condition of container terminal can be changed frequently and the pre-planning is not enough to operate container terminal sufficiently, so that we need real-time planning. This paper aims to define the problem of job reallocation of quay crane to minimize total operation time, and find the solution.

  • PDF

A study on the THD reduction of single phase 2 level inverter for grid connection for ship (선박 계통연계형 단상 2레벨 인버터의 THD 저감에 관한 연구)

  • Kim, Jung-Hoon;Kim, Sung-Hwan;Lee, Sung-Geun
    • Journal of Advanced Marine Engineering and Technology
    • /
    • v.38 no.1
    • /
    • pp.64-69
    • /
    • 2014
  • There are 440V and 220V electric source in ship. A 440V source is used to drive the power system such as crane and winch on deck and pump in engine room, and a 220V source is used to drive the power source for residential zones, control devices in engine room. In this paper, we made single phase inverter system for grid connection with 220V source for ship, and analyzed THD(Total harmonic distortion) by variation of parameters of L-C low pass filter and deadtime of inverter switching.

A CSP-based Load Leveling Algorithm for Ship Block Erection Network

  • Ryu, Ji-Sung;Park, Jin-Hyoung;Kim, Hong-Tae;Lee, Byung-No;Shin, Jong-Gye
    • Journal of Ship and Ocean Technology
    • /
    • v.10 no.2
    • /
    • pp.37-44
    • /
    • 2006
  • The erection in shipbuilding is the process to assemble all the blocks one by one in certain order and requires more leveled and efficient schedule than other processes do. However, erection schedule includes too many constraints to be systemized with simple programs and constraints are changed frequently. These difficulties make it rare to find automatic erection schedule generation system with load leveling ability. In this paper, a CSP (Constraint Satisfaction Problem)-based load leveling algorithm using a maximum load diminution technique is proposed and applied to the block erection scheduling of a dock in a shipyard. The result shows that it performs better than currently used scheduling method based on empirical logics. The maximum load of welding length and crane usage are reduced by 31.63% and 30.00% respectively. The deviation of resource usage amount also decreases by 8.93% and 7.51%.

Conatiner Terminal Operation Method for the Efficient Dual Cycle Operation (효율적인 듀얼 사이클을 위한 터미널 운영방법)

  • Chung, Chang-Yun;Shin, Jae-Young
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2010.10a
    • /
    • pp.110-111
    • /
    • 2010
  • Recently, container terminal managers make an experiment on the double cycle and dual cycle operation, which ship loading and unloading were carried out simultaneously, for increasing the productivity of quay side. However, if we make an experiment on dual cycle operation in a real job site, the efficiency is poor up to terminal operation method as YTs(Yard Tractors)' allocation method, QCs(Quay Cranes)' working speed, and position of export containers. So, this paper examine more efficient terminal operation method, when terminal uses dual cycle operation.

  • PDF