• 제목/요약/키워드: Cost-Plus

검색결과 200건 처리시간 0.033초

영양플러스 사업의 비용편익분석 - 대전 동구보건소를 중심으로 - (The Cost-Benefit Analysis of the NutriPlus Program in Daejeon Dong-gu Health Center)

  • 김현주;김성한
    • 한국식품영양학회지
    • /
    • 제28권4호
    • /
    • pp.717-727
    • /
    • 2015
  • Although the NutriPlus program has shown considerable evidence of enhancing users' nutritional status, the budget does not cover all eligible mothers and children. This study aimed to conduct a cost-benefit analysis of the NutriPlus program to assess its economic efficiency. 53 families with 79 users in the NutriPlus program at Daejeon Dong-gu Health Center participated in this study with informed consent. The costs and benefits were estimated from both the administrator's and users' perspectives. We converted the time cost into Korean currency based on the minimum wage in 2014. The value of nutrition education and service (B2), estimated by contingency valuation method (CVM), was counted as an economic benefit. 6 families (11.3%) were recipients of national medical care and 22 families (41.5%) paid 10% of the food package cost by themselves. The total cost was \7,450,167 and the total benefit was \12,402,239. The budget for the health center (C1+C2+C3+C4) was \5,984,381 a month. Time and transportation cost for receiving nutrition education (C6) differed significantly according to the economic status of families. Household food consumption increase (C4-B4) was 40,379 in the poverty group, which was four times more than in the other groups. The net benefit (B-C) was \4,852,172 and the B/C ratio was 1.66. Therefore, the NutriPlus program is beneficial in the economic aspect as well as in the nutritional aspect. If the enhancement of nutritional status was also considered, the total benefit would be even higher. These results confirm the legitimacy of a secure budget for the NutriPlus program. And we suggest expanding its budget to cover more eligible individuals to improve people's health and welfare.

Empirical Analysis of Man-hour Data to Support a Cost-Plus Pricing Approach for Estimating BIM Service Costs

  • Koo, Bonsang;Lee, Ghang;Kim, Chung-woon;Shin, Byungjin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.660-661
    • /
    • 2015
  • Building Information Modeling (BIM) is a nascent technology in Korea, and currently lacks formal guidelines to assist Architectural and Engineering (AE) firms in estimating BIM service fees, while also allowing government agencies to allocate budgets for the rendered BIM services. This research provides a method to estimate costs for BIM services based on the cost-plus pricing framework. The approach requires a generalized estimate of the man hour per floor area data to calculate the direct labor costs. Man-hour data were collected from forty five projects that have implemented BIM. Interpolation of the man-hours was performed to develop a general reference table for 'Type 2' (i.e., public schools and office buildings, etc.) projects. By providing an objective approach for estimating the costs of BIM services, it allows clients and AE firms to agree upon a fair cost for BIM related services, and thus expedite its adoption in Korea.

  • PDF

EVALUATION OF COST-TIME RELATIONSHIPS FOR CONTRACTORS PARTICIPATING IN COST-PLUS-TIME BIDDING

  • Saeed Abdollahi Sean Pour;Hyung Seok David Jeong
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.479-487
    • /
    • 2013
  • State Highway Agencies (SHAs) have started utilizing cost-plus-time bidding (A+B bidding) since Federal Highway Agency (FHWA) declared it operational on May 4, 1995. Although this technique has successfully accelerated many projects by incorporating construction time in the bidding competition, a framework to illustrate the interactions of incentive/disincentive (I/D) rates on the competitiveness of contractors participating in the bid competition is yet to be developed. In a previous research, authors indicated that for each bid competition there is an efficient cap for I/D rates which are dictated by the capabilities of contractors in project acceleration. However, the results of previous study were based on the assumption that there is a statistically significant relationship between cost and time. In this study, the entire cost-plus-time projects implemented by the Oklahoma Department of Transportation (ODOT) were investigated. Then the significance of relationship between cost and time were analyzed for each contractor utilizing Analysis of Variance (ANOVA) technique, and the price-time function of each contractor was determined by regression analysis. The results of the analysis indicate that there is a significant relationship between cost and time for the majority of contractors. However, a quadratic relationship is not always significant and for some contractors a linear price-time relationship is significant. The results of this project can be used not only by ODOT to optimize the incentive/disincentive rates but also by contractors to determine the most competitive strategies of other bid participants.

  • PDF

건설공사 사후평가 용역대가기준 개선방안 (A Study on Improving Pricing Criteria for Post-Construction Evaluation)

  • 김석;이두헌;박재우
    • 한국콘텐츠학회논문지
    • /
    • 제16권8호
    • /
    • pp.661-670
    • /
    • 2016
  • 건설공사 사후평가는 공공건설사업을 대상으로 수요 공사비 공사기간 기대효과 및 사업관리 내용 등을 준공 이후에 재평가하고, 차후 유사사업 추진 시 그 평가결과를 참고하여 발주청의 시행착오를 줄이기 위한 목적으로 2000년부터 도입되었다. 하지만 용역대가 산정기준이 마련되지 않아 사후평가 용역의 질적 저하 및 분쟁발생의 원인이 되고 있다. 본 연구에서는 사후평가 용역데이터를 기반으로 공사비요율방식 및 실비정액가산방식의 용역대가 산정기준을 제시하였다. 용역대가 분석을 위해 기존의 사후평가 용역비와 공사비를 조사하고 공사비요율방식 및 실비정액가산방식을 통해 산출된 용역비를 비교분석하였다. 분석결과 실비정액가산방식을 통해 산출한 용역비가 공사비요율방식에 비해 더 정확함을 확인하였다. 실비 정액가산방식은 시설물별 사업특성을 반영할 수 있도록 거리보정계수, 면적보정계수, 통합보정계수 등 다양한 보정계수가 적용되었으며, 선형공사(도로, 철도), 비선형공사 I(주택 산업단지), 비선형공사 II(공항, 항만, 댐, 상하수도), 기타공사로 시설물 구분을 세분화하여 산정기준을 제시하였다.

군집시설물 건설공사의 안전점검 대가 산정모델 제안 및 평가 (Proposal and Evaluation of the Safety Inspection Cost Estimation Model for Multi-building Construction Project)

  • 김진원;방종대;손정락
    • 대한건축학회논문집:구조계
    • /
    • 제33권12호
    • /
    • pp.11-18
    • /
    • 2017
  • The safety inspection cost of the construction work was based on commercial facilities classified as a single building. Therefore, it is not possible to fully reflect the characteristics of the multi-building construction project such as apartment houses. Therefore, this study suggests a reasonable estimation model that can fully reflect the characteristics of the multi-building construction project. The safety inspection cost estimation model proposed two models such as construction cost ratio method and cost plus fixed fee method. And these models were simulated by the apartment construction work and compared with the current standard. As a result, the current construction cost ratio method has shown that the safety inspection cost tends to be overestimated as the construction size increases. Therefore, the proposed model has reflected characteristics of the multi-building construction project, so that it can reasonably estimate the safety inspection cost more than the current standard.

경쟁적인 통신서비스 시장에서 MVNO 도매대가 산정에 관한 연구 (A study on the MVNO Wholesale Price in Competitive Communication Service Market)

  • 송영화;배기수;전흥주
    • Journal of Information Technology Applications and Management
    • /
    • 제19권2호
    • /
    • pp.217-231
    • /
    • 2012
  • In the past, companies should make enormous facility investment and acquire a right to do business in order to join communication markets, but now they can do business without important facilities, such as communication networks. Such a movement to ease regulations about companies which want to newly join the communication industry is expected not only to change a competition frame of the mobile communication market but also to greatly affect the entire communication industry. Through this study aiming to look into a way to calculate a reasonable wholesale price related to the government's introduction of the Mobile Virtual Network Operator (MVNO) system, I came up with a following result. I applied the operating profit percentage and the ratio of operating gain to cost to the cost plus model and retail minus model, respectively, to calculate the wholesale price and found that when I calculated with the cost plus model applying the operating profit percentage, I could get the highest wholesale price. On the other hand, I got the lowest wholesale price with the retail minus model by applying the operating profit percentage. Division of expenses and calculation of profit percentage are important factors in calculating the wholesale price and such results are expected to help accurate calculation of the MVNO wholesale price.

해외사례 비교를 통한 2014년 개정 건설기술용역 대가기준 분석 (An Analysis of the 2014 Pricing Guide for Technical Service Contracts through Comparison with Foreign Countries' Cases)

  • 이태원;이강
    • 한국건설관리학회논문집
    • /
    • 제16권3호
    • /
    • pp.152-164
    • /
    • 2015
  • 건설기술용역 대가기준이 명확하고 투명해지면, 발주자와 입찰자 입장에서는 용역 투입비용에 대해 예측 및 정산이 가능하며, 실제 업무를 수행하는 엔지니어 입장에서도 실질적인 혜택이 돌아갈 수 있게 된다. 최근 정부는 건설기술용역 국제경쟁력 향상을 위해 그간 사업의 규모와 상관없이 사용해오던 공사비요율방식에 의한 대가산정방식의 사용은 지양하고 점차 실비정액가산 방식으로 개선하고 있다. 그런데 개정된 실비정액가산방식의 대가산정기준을 적용하였을 경우, 기존 방식에 비하여 153%~197% 용역비가 상승하기 때문에, 개정된 대가산정기준 적용에 논란이 없으려면 기존 정산방식이나 정산근거에 대한 검토가 필요하다. 이를 위하여 미국, 영국을 비롯한 해외 사례와의 비교 분석을 통하여 2014년 개정된 건설기술용역 대가기준을 분석하였다. 분석결과, 큰 틀에서는 선진국과 같이 실비정액가산방식으로 원가계산방식을 일원화한 것은 매우 중요한 변화이지만, 상세내역계산에서는 해외와 달리 산정방식이 복잡하고, 직접인건비에 일부 간접경비가 포함되어 있으며, 제경비 기술료 등 간접경비를 포괄적으로 인정하여, 경비의 중복산정 문제나 집행내역의 불투명성 문제가 여전히 존재하는 것으로 나타났다. 이에 대한 여러 해결방안을 제안하였다.

투광형 비정질 BIPV 시스템의 LCC 평가에 관한 연구 (A Study on the Life Cycle Cost Analysis of the See-through a-si Building Integrated Photovoltaic System)

  • 이한명;오민석;김회서
    • 한국태양에너지학회 논문집
    • /
    • 제29권1호
    • /
    • pp.1-10
    • /
    • 2009
  • This study was carried out to evaluate the Life Cycle Cost(LCC) of three types of RTPV(Building Integrated Photovoltaic) systems-Glass plus Granite. Crystalline BIPV and See through Amorphous BIPV-which were vertically installed to generate the same power output(76 kW level). Initial investment costs. cost. savings and maintenance costs had been predicted during the period of analysing the LCC of three types of BIPV(Building Integrated Photovoltaic) systems installed for the purpose of evaluating the LCC. In case of cost savings, it had been analyzed by measuring the amount of electric power generated, reduction in lighting load and heat & cooling loads through simulation. From this analysis, it was predicted that the See-through amorphous BIPV offering cost saving advantages demonstrated the economical efficiency similar to the Class plus Granite when it is backed by more than 20 years of durability.

S-PLUS의 소개 및 SAS 와의 그래픽 비교 (Introduction to S-PLUS and graphical comparison with SAS)

  • 김성수;한경수
    • 응용통계연구
    • /
    • 제6권1호
    • /
    • pp.1-11
    • /
    • 1993
  • 통계자료분석에서 그래픽에 의한 분석방법은 컴퓨터의 급속한 발전과 더불어 많은 기법이 개발되어 왔으며, 이는 자료에 내포된 정보 및 통계적인 모형선택방법에 유용하게 이용될 수 있다. 개인용 컴퓨터에서 그래픽 자료 분석방법에 다양하게 응용될 수 있는 소프트웨어로서 S-PLUS(version 2.0)를 소개하고, 그래픽기능의 관점에서 SAS/GRAPH(version 6.04)와 비교, 논의하고자 한다.

  • PDF

지속가능한 건설사업관리를 위한 발전방안 (Suggestions for Sustainable Construction Project Management)

  • 이승훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.240-241
    • /
    • 2021
  • For the sustainable development of the domestic construction project management field, each CM company should try to diversify in terms of service contract types and scope of work while having internationally competitive technical and service capabilities as follows. First, from the initiation of the service to the completion, the CMr should be able to establish and execute a plan to create specific outcomes. Second, CMr must have the capability to produce weekly or monthly cost, schedule, risk, and scope management reports. In addition, it should be possible to apply the cost plus sliding fee method or to systematically and continuously accumulate and process data generated during the construction process.

  • PDF