Medium size rotorcraft consist of approximately 5,000 key components. The components must satisfy the target weight and performance requirement through optimization. Therefore a rotorcraft component has approximately 100 times higher unit cost for mass production than the equivalent of an automobile's, along with huge development cost. Configuration management consists of four main parts : configuration identification, configuration control, configuration audit, and data management. In development programme, configuration management is one of the methods to save development cost, and setting a well-structured configuration management system according to the Military Standard is an important factor in success of the programme. The paper proposes a configuration management system suitable for development of various multi-use components development and presents that the configuration management was performed successfully during dual-use component development programme using the established system.
Many in the industrial world that consume high amounts of energy are trying to reduce energy when manufacturing their products. Energy saving during manufacturing is a cost reduction. Reduced cost is necessary for profit improvement. The Piston Under Drive Brake used in the current study is an automotive transmission part. The original machining after hot forging was changed to machining after cold forging of a plate in order to save energy and cost. Two extrusion shapes along the outer diameter caused decreased tool life because of the interrupted cut during turning. Therefore, a thickness reduction of two extrusion areas in the outer diameter was needed. The current study suggests an effective way to reduce the thickness of interrupted cut by using progressive blanking.
As the competition in the liner shipping industry is becoming fiercer, the shipping company is trying to find the way to keep the best competitive position by reducing the cost level as low as possible and offering the best quality of service to their customer. In order to achieve this goal, the selection of port and terminal that have the best quality of service and cost effective structure is essential for the shipping line, where they can only have a chance to save the money. In this context, the paper compares three European container terminals in order to understand the factors that have to be considered in the decision making process for the selection of terminal. And its advantages and disadvantages of each type of container terminal operation system were analyzed from the liner shipping company's point of view in terms of cost, time, flexibility, stability, hinterland connection, geographical position and terminal productivity. It is obvious that the cost factors are very important for liner shipping company to select their terminal. However, there might be even more important factors than the cost factors, such as quality of port and terminal service, mutual trust, and possibility of future development.
Activated sludge sewage treatment processes are difficult to be controlled because of their complex and nonlinear behaviour, however, the control of the dissolved oxygen level in the reactors plays an important role in the operation of the facility. For this reason, this study is designed to present a system which accurately measures DO, MLSS, pH and ORP in the aeration tank to alleviate situations above and provide the automatization of a sewage treatment plant (STP) using new DO control system. The automatic control systems must be guaranteed the accuracy. Therefore, the proposed automatic DO control system in this study could be commercial applications in the aeration tanks by means of operating cost analysis and user-friendly for operation and maintenance. We could get accurate data from the lab tank which has water quality checker because there was no vortex and air bubble during the measurement process. Improvement of confidence in the lab tank enabled effective and automatic operation of sewage treatment plants so that operation costs and manpower could be saved. If this result is put in place in every sewage treatment plant nationwide for practical purposes, it is estimated to cost 18.5 million dollars in installing the lab tank and to save 9.8 million dollars in management cost a year, except for cost saved by automation.
The micro grid considered in this paper consists of a diesel generator, a photovoltaic array, a wind turbine, a fuel cell, and a energy storage system. This paper explains and simulates the micro grid components in terms of accuracy and efficiency of having a system model based on the costs of fuel as well as operation and maintenance. For operational efficiency, the objective function in a diesel generator consists of the fuel cost function similar to the cost functions used for the conventional fossil-fuel generating plants. The wind turbine generator is modeled by the characteristics of variable output. The optimization is aimed at minimizing the cost function of the system while constraining it to meet the customer demand and safety of micro grid. The operating cost in fuel-cell system includes the fuel costs and the efficiency for fuel to generate electric power. To develop the overall system model gives a possibility to minimize of the total cost of micro grid. The application of optimal operation can save the interruption costs as well as the operating costs, and improve reliability index in micro grid.
In continuous review inventory model, (${\varrho}$, ${\gamma}$) system, order quantity(${\varrho}$) and reorder point(${\gamma}$) should be determined to calculate inventory-related cost that consists of setup, holding, and penalty costs. The procedure to obtain the exact value of ${\varrho}$ and ${\gamma}$ is complex. In this paper, a regression analysis is proposed to get the approximate inventory-related cost without the determination of ${\varrho}$ and ${\gamma}$ in the case that the standard deviation(${\sigma}$) of the lead time demand is small or that the mean(${\mu}$) of the lead time demand is proportional to ${\sigma}$. To save inventory-related cost, central warehouses with (${\varrho}$, ${\gamma}$) system can be built. Central warehouse can provide some stores with products with the consideration of the tradeoff between inventory-related cost and transportation cost. The number and the location of central warehouses to cover all the stores are determined by a regression-based approach. The performance of the proposed approach is tested by using some computational experiments.
In this study, In order to apply the U-flanged truss hybrid beam to the actual construction site, the structural design of the basic module of the middle and low-rise neighborhood living facilities was performed according to the Korea Design Standard, and the construction cost and construction period were compared with the traditional reinforced concrete structure system. As a result of analyzing the construction cost for the basic module, if the U-flanged truss hybrid beam and D-Deck slab system are used, the construction cost can be reduced by 86% compared to the traditional reinforced concrete structure system. In addition, as a result of analyzing the construction period for a floor area of 1,000m2, using the U-flanged truss hybrid beam and D-Deck slab system can save 2.0days in construction period compared to the traditional reinforced concrete structure system. Therefore, the U-flange truss hybrid beam can secure sufficient economic feasibility compared to the existing reinforced concrete method in terms of cost reduction and shortening of construction period.
최근 정부는 임대형민간투자사업(BTL, Build Transfer Lease)방식을 적극 도입함으로써 민간의 축적된 지식과 경험을 이용하여 보다 효율적인 사회간접자본(Social Overhead Capital) 확충을 도모하고 있다. 공공부분 및 사업시행자 등 민간투자사업의 사업기획단계에서 운영단계에 이르기 까기 전문화된 기술과 경험을 바탕으로 한 설계를 통하여 시설물 사용자의 요구를 충족시키는 동시에 창의적 기법을 총동원 예산과 리스크 범위내에서 최대한의 효율과 수익 창출을 극대화하려는 노력이 필요하다. 이처럼 BTL등 민간투자사업의 투자가치(Value for Money)를 극대화시키기 위해서는 VM(Value Management) 방법론의 효과적인 사용이 불가피하다. 여기서는 BTL 사업에서의 "VE job Plan" 활용 절차 및 적용방안을 제시하였다. BTL 사업에서의 효율적인 "VE job Plan"을 제시하기 위하여 국내 민간투자사업 및 VE 추진을 위한 법적제도의 변화를 분석하였다. 국내 BTL 사업 수행절차 및 BTL 사업에서의 VE적용방안을 "VE job Plan"과 함께 제시하였다. 실제 적용사례 연구를 통하여 BTL 사업에서의 "VE job Plan"의 작성과 작성된 프로세서를 활용한 의사결정 및 대안평가 방법을 제시하였으며, 속성 중 비용은 LCC(Life Cycle Cost : 이하 LCC) 분석결과를 바탕으로 평가하였고, 프로젝트 기능개선을 위한 평가방법으로는 기술적 FAST도를 사용하여 분석하였다. 사례는 "대구시립미술회관" 사업자 선정을 위한 BTL VE 활동을 통해 보다 향상된 가능의 개선, 비용절감 및 양질의 서비스 수준을 제공한 VM사례를 소개하였다.
The aim of this study was to compare medical cost of hospice care and that of conventional care during the last year of life, and identify factors that influenced the cost. From January to August 2003 592 terminal cancer patients receiving care from 5 hospice care units and 2 hospice care teams in general hospitals were enrolled to case group. Two hundreds and seventy two terminal cancer patients receiving conventional care from 7 general hospitals were enrolled to hospital-based control group, and 1,636 terminal cancer patients from 122 general hospitals located in same regions with the 7 hospitals were enrolled to community-based control. We used characteristics and medical cost from data of National Health Insurance Cooperation. Total medical cost per beneficiary in cases was about 10 millions won, 14.5 millions in hospital-based controls and 11.1 millions in community-based controls. The hospice care saved $45\%$ over the last year of life compared with hospital-based controls (p<0.0001). Saving of inpatient cost account for approximately $80\%$ of saving per beneficiary. Hospice care saved $29\%$ of medical cost per hospitalization day compared with hospitalbased controls and $17\%$ compared with community-based controls (p<0.0001). Multiple regression analyses showed that hospice care significantly saved the medical cost. This study suggest that hospice care save medical cost compared with hospital-based control and community-based control. Most of saving of inpatient cost account for approximately $80\%$ of saving of medical cost.
The energy storage system is considered to be one of the useful devices for energy storing and recycling. the energy storage system can save energy cost and stabilize the system voltage. This paper presents the development of two energy storage systems. One is 750V system for light rail system. the other is 1500V system for heavy rail system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.