Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.393-396
/
2002
Purpose of this study is to suggest some modules to integrate schedule and change control. The study has been performed through the process of literature review, effect comparison of being not integrated and integrated of the schedule and change control, and finally suggest new integrated modules. The results of this study are as follows: 1) Suggestion of a Predicted Change Information Control Module: This nodule can be used to assess the impact of changes in advance and to prepare counteraction. 2) Suggestion of a Change Information Control Module: This module is used to update current schedule for the realized changes. 3) Suggestion of a Revision History Maintenance Module: This module is used to record schedule and cost revision history and to analyze the overall change trend.
Project Monitoring and Control is one of the required activities in project management. This activity provides the information about whether a project is making a progress as it is planned. It is usually performed in weekly meetings or milestone meetings where the project manager checks the project's current status based on project measures such as schedule, cost and work performance. One of the popular method for project monitoring and control is EVM(Earned Value Management). The major characteristic of EVM is that it uses only one measure 'cost' for schedule and work performance so that it enables 2 independent graphs to be illustrated in one integrated graph based on cost. For applying EVM to a project, it is essential to break whole work to work packages and to assign value of cost to each work package at the initial stage of the project. Therefore EVM is well matched with the lifecycle which requires whole plan at the beginning of project. However, in XP(eXtreme Programming), whole customer requirements are difficult to define and to make a complete plan at the beginning and are more detailed in each Iteration. Therefore EVM is not comfortable method for XP. Therefore in this research we suggest 3 layer EVM which can be applied in XP, and develop a process guidelines based on CMMI(Capability Maturity Model Integration) PMC(Project Monitoring and Control) process area.
BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.
Seo, Min-gi;Shin, Ju-chul;Baek, Gyong-hoon;Kim, Seong-woo
Journal of Advanced Navigation Technology
/
v.23
no.5
/
pp.345-351
/
2019
Avionics System Integration Laboratory is an integrated test environment for the integration and the verification of avionics systems. Recently, in order to fully consider the requirements verification of avionics system from the aspect of the entire system integration, the participation in the development of the SIL field is advanced from the requirement analysis of the aircraft. Efforts are being made to minimize the cost and the period of development of a SIL so that it does not affect the overall schedule of the aircraft development. We propose the avionics simulation model framework (ASMF) based on the modeling formalism applicable to SIL in order to reduce development period/cost and increase maintenance by standardizing the modeling methods of SIL.
Journal of the Korea Institute of Building Construction
/
v.4
no.1
/
pp.105-110
/
2004
Resource procurement is an important management area because cost of resource covers 40% of total construction project cost and resource delivery has direct relationship with project performance. Integration of cost provides various potentials for effective and efficient project control. This study investigates the usefulness of time in resource procurement management focused on materials. These days, construction projects have characterized manufacture because of industrialization and component. Therefore, application of systematic resource planning has been requested in the construction. There are many companies conducting procurement of resource on the web by applying MRP, ERP etc. in the construction. However, in applying them in the construction yet, there is obstruction. MRP has the character doing its function under accurate cost prediction of resource. But prediction of resource is difficult in industry mechanism of the construction. If accurate cost prediction of resource is possible in the construction, it will be expected to reduce cost of procurement of resource substantially by applying successful resource planning model in the manufacture. On the basis of recent current, the purpose of study is to present procurement of resource system that period observance of construction and minimization of stock is possible by reflecting accurate lead-time to apply proactive thought to be able to cope with alteration of construction schedule efficiently in analyzing resource planning of the construction site.
Purpose The purpose of this study is to investigate to investigate the effects of cloud system on the efficiency improvement and cost-saving of production processes. It also tries to provide small- and medium-sized companies and IT practitioners with a practical guideline for a successful implementation of could systems. Design/methodology/approach This study was conducted by observing and analyzing a case of implementing a cloud system at a small-sized company having multiple job sites in terms of the improvement in data-sharing efficiency and cost-saving of production processes. Findings This study found that cloud system was an effective way of sharing data between and among production processes of geographically scattered job sites and thus, helped the company to remedy problems of work schedule and load-balance along sequential production processes. Cloud system also allowed the company to reduce the number of visits made by 3-inspectors to four job sites by 75% and the personnel cost related to inspectors' site visit.
Journal of the Society of Naval Architects of Korea
/
v.42
no.5
s.143
/
pp.542-549
/
2005
Naval ships are complex weapon systems which play the integrated performance by system integration of many kinds of weapon systems and their leading ships are usually not disposed after test and evaluation but militarised. Then, strict project management is required for naval ship building projects by identifying problems early and by taking prefer measures in time against unexpected situations encountered in the process of the projects. EVMS is a project management system which can manage the schedule and the budget of a project concurrently and estimate the project's time duration and the cost at project completion. In this paper, the applicability and usefulness of WMS is studied for a assumed navai ship building project, in the environment of monetary fluctuations such as price index, wage increase rate and exchange rate.
Lee Yoo-Seob;Cho Chang-Yon;Oh Kyu-Hoan;Kim Jung-Hun
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.123-130
/
2002
Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.
Korean Journal of Construction Engineering and Management
/
v.5
no.1
s.17
/
pp.168-174
/
2004
Project plan and control is a highly skilled task which is vital for business success, and Project control systems are important for successful project execution. To support construction process management effectively, an integrated cost and schedule control function is required to collect quality data in a timely manner and to provide quality historical data for future planning of new projects. In Korea construction industry, the development and implementation cases of a project control system which to efficiently support construction project planning and controlling processes, have been increased to ensure a project success and the profitability of a construction company. To contribute to improving practical effectiveness of a project control system, the paper reviewed and analyzed the current trends and functional features of current project control systems. And it also described the pending issues and their solutions faced on previous project control systems.
Korean Journal of Construction Engineering and Management
/
v.17
no.3
/
pp.43-51
/
2016
Recently, the cost of construction projects has escalated due to a significant increase in size and complexity. Many construction projects have failed to meet their originally intended project deadline due to various factors such as weather, labor supply, equipment, procurement, accidents, etc. Consequently, emergency construction work scenario has to be implemented in order to shorten the duration and satisfy the original estimated schedule. However, many critical decisions in emergency scenario rely solely on the experience of a construction manager. Thus, this paper proposes TCTO optimization model to decide the most effective alternative out of various working scenarios which are generated by the combination of work group and work time. The developed TCTO model provides the optimum schedule that satisfies the practical constraints. Future research could involve the integration of resource leveling with the proposed model. This would make the model more versatile.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.