• 제목/요약/키워드: Cost allocation

검색결과 605건 처리시간 0.032초

배전계통 운영비용의 최소화에 의한 분산전원의 최적용량과 위치결정 (Optimal capacity and allocation of distributed generation by minimum operation cost of distribution system)

  • 박정훈;배인수;김진오;심헌
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2003년도 하계학술대회 논문집 A
    • /
    • pp.360-362
    • /
    • 2003
  • In operation of distribution system, DGs(Distributed Generations) are installed as an alternative of extension and establishment of substations, transmission and distribution lines according to increasing power demand. Optimal capacity and allocation of DGs improve power quality and reliability. This paper proposes a method for determining the optimal number, size and allocation of DGs needed to minimize operation cost of distribution system. Capacity of DGs for economic operation of distribution system can be estimated by the load growth and line capacity during operation planning duration. DG allocations are determined to minimize total cost with failure rate and annual reliability cost of each load point using GA(Genetic Algorithm).

  • PDF

지정식 보관방식 창고시스템에서 보관위치 할당계획 (The Allocation Planning of Storage Location in a Dedicated Storage Method Warehuse System)

  • 장석화
    • 산업경영시스템학회지
    • /
    • 제30권1호
    • /
    • pp.8-14
    • /
    • 2007
  • This paper addresses the allocation planning of the storage location in a warehouse system that the dedicated storage method is used. In the discrete finite time period model, the demands for storage location of products are dynamic for time periods. The planning is to determine the reallocation time period and the storage location of the products in reallocation time period, which minimizes costs. The cost factors are the reallocation cost, the travel cost within warehouse and the surplus storage location cost. A model is formulated, and the property of optimal solution is characterized. The dynamic programming algorithm is developed, and a numerical example is shown.

시간/비용의 트레이드-오프를 고려한 2목적 스케쥴링 문제 (A Bicriterion Scheduling Problems with Time/Cost Trade-offs)

  • 정용식;강동진
    • 한국산업정보학회논문지
    • /
    • 제4권2호
    • /
    • pp.81-87
    • /
    • 1999
  • 본 연구에서는 단일 공정의 생산시스템을 대상으로 n개 작업에 있어서의 시간/비용의 트레이드-오프에 있어서 작업순서의 평가기준과 자원할당 비용의 평가기준을 동시에 고려한 2목적 스케쥴링 문제들을 제안한다. 우선 가공작업의 총체류시간(total flow time)과 납기(due date)의 평가기준에 관한 2목적의 유효스케쥴을 구하는 해법을 제안한다. 그리고 이러한 평가기준과 이에 관련된 자원할당의 비용을 동시에 최소화하는 2목적의 해법을 제안한다.

  • PDF

부반송파 그룹간 기회 비용 상호 비교에 기반한 적응 부반송파 할당 기법 (An Adaptive Subcarrier Allocation Scheme based on Comparison of Group Opportunity Cost)

  • 김영억;윤병완;이영탁
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 한국정보통신설비학회 2007년도 학술대회
    • /
    • pp.55-58
    • /
    • 2007
  • An adaptive subcarrier allocation scheme based on comparative superiority of opportunity cost between groups is proposed for the enhancement of system capacity and its simple implementation at the base station of a multiuser OFDM system. The proposed algorithm is similar to the blockwise or the decentralized subcarrier allocation algorithm proposed by Xiaowen et al and Alen et al, respectively. In the proposed algorithm, however, all subcarriers are grouped according to the coherence bandwidth and the comparative superiority concept, which swaps the groups between users if the system capacity is increased, is adopted for the enhancement of system capacity. In addition, the proposed algorithm provides a simple solution for the conflict problem among users by reallocating only the conflicted groups and unassigned groups instead of reallocating entire groups. Simulation results demonstrate that the proposed algorithm increases the system capacity effectively over a static, an adaptive blockwise, and a decentralized subcarrier allocation algorithms.

  • PDF

선단구성을 위한 초기배선 (Initial Ship Allocation for the Fleet Systematization)

  • 이철영;최종화
    • 한국항해학회지
    • /
    • 제8권1호
    • /
    • pp.1-16
    • /
    • 1984
  • The economical property of a shipping enterprise, as well as other transportation industries, is determined by the difference between the freight earned and expense paid. This study can be regarded as a division of optimizing ship allocation to routes under the integrated port transport system. Fleet planning and scheduling require complicated allocations of cargoes to ships and ships to routes in order to optimize the given criterion function for a given forecast period. This paper deals with the optimum ship allocation problem minimizing the operating cost of ships in a shipping company. Optimum fleet operating for a shipping enterprise is very important, since the marine transportation is a form of large quantity transport requiring long-term period, and there is a strong possibility to bring about large amount of loss in operation resulting from a faulty ship allocation. Where there are more than one loading and discharging ports, and a variety of ship's ability in speed, capacity, operating cost etc., and when the amount of commodities to be transported between the ports has been determined, then the ship's schedule minimizing the operating cost while satisfying the transport demand within the predetermined period will be made up. First of all a formula of ship allocation problems will be established and then will be constructed to solve an example by the Integer Programming application after consideration of the ship's ability, supply and demand of commodity, amount of commodity to be transported, operating costs of each ship etc. This study will give good information on deciding intention for a ship oprator or owner to meet the computerization current with shiping management.

  • PDF

교량 안전성과 공용년수를 고려한 적정 보수보강 예산 배분 (Bridge Appropriate Maintenance Budget Allocation Considering Safety and Service Life)

  • 선종완;이후석;박경훈
    • 한국산학기술학회논문지
    • /
    • 제18권11호
    • /
    • pp.130-137
    • /
    • 2017
  • 교량의 목표 수명 동안 통행 안전성을 유지하기 위해서는 적정한 보수보강 예산의 확보와 확보된 예산의 합리적인 배분이 필요하다. 기존의 단순 교량 규모 기반 예산 배분 방식을 개선하여 다양한 영향인자를 고려한 합리적인 예산 배분 결정 체계를 제안하였다. 전체 교량을 하위 관리주체별로 일정한 관리 수준이 확보되도록 교량의 보수보강 예산을 적정하게 배분하기 위하여 과거 보수보강 이력에 기초한 조치율 모델과 단위 비용 모델을 개발하였다. 제안된 모델을 이용하여 관리주체별 적정 예산 배분 비율 결정 방법을 제안하고 사례 분석을 수행하였다. 교량의 보수보강 예산 배분의 영향 인자로 교량 규모뿐만 아니라 종별 현황과 현재 안전등급, 공용년수가 고려되어야 적정 예산 배분이 이루어지는 것으로 나타났다. 개발된 방법을 활용하여 관리 주체별 예산 소요를 명확하게 반영한 예산 분배를 시행함으로서 불필요한 예산 낭비를 방지하고 예산 배분의 합리적인 근거를 제공할 수 있을 것으로 판단된다.

A novel approach for optimal DG allocation in distribution network for minimizing voltage sag

  • Hashemian, Pejman;Nematollahi, Amin Foroughi;Vahidi, Behrooz
    • Advances in Energy Research
    • /
    • 제6권1호
    • /
    • pp.55-73
    • /
    • 2019
  • The cost incurred by voltage sag effect in power networks has always been of important concern for discussions. Due to the environmental constraints, fossil fuel shortage crisis and low efficiency of conventional power plants, decentralized generation and renewable based DG have become trends in recent decades; because DGs can reduce the voltage sag effect in distribution networks noticeably; therefore, optimum allocation of DGs in order to maximize their effectiveness is highly important in order to maximize their effectiveness. In this paper, a new method is proposed for calculating the cost incurred by voltage sag effect in power networks. Thus, a new objective function is provided that comprehends technical standards as minimization of the cost incurred by voltage sag effect, active power losses and economic criterion as the installation and maintenance costs of DGs. Considering operational constraints of the system, the optimum allocation of DGs is a constrained optimization problem in which Lightning Attachment procedure optimization (LAPO) is used to resolve it and is the optimum number, size and location of DGs are determined in IEEE 33 bus test system and IEEE 34 bus test system. The results show that optimum allocation of DGs not only reduces the cost incurred by voltage sag effect, but also improves the other characteristics of the system.

대단위 농업종합개발사업의 사회경제적 기대편익 추정과 결합비용의 배분 -금강지구를 중심으로- (Estimation of the Expected Socio-economic Benefits of the Largescale Comprehensive Agricultural Development Project and Jointcost Allocation -In the Case of Kumgang Project Area-)

  • 임재환
    • 농업과학연구
    • /
    • 제23권1호
    • /
    • pp.159-176
    • /
    • 1996
  • This study is aimed at reviewing the methods of joint cost allocation and allocating the joint cost of estuary dam with specially repect to Kumgang Large-scale Agricultural Comprehensive Development Project. Apart from the water resource development project propelled by Water Resource Development Corporation in connection with Law of Multipurpose Dam Development, the Largescale Comprehensive Agricultural Development Projects couldn't ins-titutionally be carried out cost allocation of common facilities, even though it were concerned with irrigation, municipal and industrical water supply, flood control, sightseeing and industrial zone development components. To decrease farmer's burden of the project costs and, operation and maintenance costs, the joint costs of common facilities like estuary dam included in agricultural development projects have to be allocated by suitable method as alternative cost-remaining benefit method and the analytical activity should be supported by revising the concerned laws as Rural Development and Promotion and, Rural Rearrangement conpatible with the law for multipurpose dam development. Kumgang Agricultural Comprehensive Development Project was selected as a case study for the estimation of socio-economic benefits by project components and joint cost allocation of the estuary dam. The main results of the study are as follows; Joint cost allocation and unit charges by components 1. The project area will be 25,554ha with total project cost of 624,860 million won including the estuary dam cost of 120,843 million won. The project costs were ex-pressed by 1994 constant price. 2. Total quantity of water was estimated 365 million tons which were consisted of 245 million tons for irrigation, 73 million tons for municipal water and 47 million tons for industrial water. 3. The rates of joint cost allocation were amounted to 34.2% for agriculture, 2.5% for sightseeing, 45.7% for transportation, 11.8% for M & I water supply and 5.8% for flood control respectively. 4. The unit financial charges by project components were estimated at 7.88 won per ton for irrigation, 16.11won for M & I water, 1,686won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The financial charges using straitline method for depreciation were estimated at 7.88won per ton for irrigation, 9.12won per ton for M & I water, 624won per vehicle one pass for transportation and 331won per Pyeong for sightseeing area. 5. The unit economic charges by project components were estimated at 21.1 won per ton for irrigation, 15.2won for M & I water, 977won per vehicle one pass, 977won per Pyeong according to the capital recovery method. The economic charges using straitline method for depreciation were estimated at 11.72won per ton for irrigation, 8.61won per ton for M & I water, 331won per vehicle one pass for transportation. Policy recommendation 1. The unit operation and maintenance costs for irrigation water in the paddy field couldn't be imposed as the water resource cost untreated. 2. The dam costs including investment cost and O & M cost, as a joint cost, had to be allocated by each benefited components as transportation, M & I water supply, flood control, irrigation and drainage, and sightseeing. But the agricultural comprehensive project have been dealt as an irrigation project without any appraisal socio-economic benefits and any allocating the joint cost of estuary dam. 3. All the associated project benefits and costs must be evaluated based on accounting principle and rent recovery rate of the project costs and O & M costs should be regulated by the laws concerned. 4. The rural development and promotion law and rural rearrangement law have to be revised comprising joint cost allocation considering free rider problems. 5. The government subsidy for the agricultural base development project has to be covered all the project costs. In case of common facilities representing joint cost allocation problems, all the allocated casts for other purposes like transportation and M & I water supply etc. should be recovered for formation in investment fund for agricultural base development and to procure O & M costs for irrigation facilities.

  • PDF

어업경영합리화의 원리에 대한 고찰 (A Study on the Principle of Rationalization in Fisheries Management)

  • 공용식
    • 수산경영론집
    • /
    • 제14권1호
    • /
    • pp.1-18
    • /
    • 1983
  • This study has examined the principle of rationalization as a guiding principle in fisheries management. Generally speaking, the guiding principle of business management is the principle of profitability which is oriented to the profit maximization, but it has been insisted by Dr, Mohri that the principle of profitability should be translated into the maximization of ratio of added value on gross capital, According to Dr. Durcker, added value (contributed value) can be used to analyze productivity only if the allocation of costs which together make up the figures is economically meaningful. Therefore, the rationalization of fisheries management can be measured as a result of economic allocation of costs, The analysis of economic allocation of costs divides into macro-allocation of costs and micro-allocation of costs. In fisheries management, the former makes use of the analysis of break-even point, and the latter analyzes the efficiency of individual cost respectively and the state of division of costs which allocate into above-the-line expenses of lay system and management's burden expenses. In macro-allocation of costs, it is advisable that fixed costs be converted into variable costs. This is characteristically possible in fisheries management, because wages belong to variable costs in fisheries management while they are regarde as fixed cost in the other industires. Because we could find that all costs would belong to above-the-line expenses, in micro-allocation analysis, the very costs which are directly related to fisherman's poduction activity should be classified into above-the-line expenses, and the other costs into management's burden expenses. This is a central problem in the rationalization of fisheries management.

  • PDF

A Joint Allocation Algorithm of Computing and Communication Resources Based on Reinforcement Learning in MEC System

  • Liu, Qinghua;Li, Qingping
    • Journal of Information Processing Systems
    • /
    • 제17권4호
    • /
    • pp.721-736
    • /
    • 2021
  • For the mobile edge computing (MEC) system supporting dense network, a joint allocation algorithm of computing and communication resources based on reinforcement learning is proposed. The energy consumption of task execution is defined as the maximum energy consumption of each user's task execution in the system. Considering the constraints of task unloading, power allocation, transmission rate and calculation resource allocation, the problem of joint task unloading and resource allocation is modeled as a problem of maximum task execution energy consumption minimization. As a mixed integer nonlinear programming problem, it is difficult to be directly solve by traditional optimization methods. This paper uses reinforcement learning algorithm to solve this problem. Then, the Markov decision-making process and the theoretical basis of reinforcement learning are introduced to provide a theoretical basis for the algorithm simulation experiment. Based on the algorithm of reinforcement learning and joint allocation of communication resources, the joint optimization of data task unloading and power control strategy is carried out for each terminal device, and the local computing model and task unloading model are built. The simulation results show that the total task computation cost of the proposed algorithm is 5%-10% less than that of the two comparison algorithms under the same task input. At the same time, the total task computation cost of the proposed algorithm is more than 5% less than that of the two new comparison algorithms.