A project manager is required to have systematic knowledge in the project management in fashion and apparel industry. The Network Technique is a modern project management technique and applies to almost all industry sectors, including fashion and apparel industry. Through the Network Technique, we can save project time and cost. The purpose of present study are - to introduce the Network Technique into fashion and apparel industry management area, and - to make an practical application of he Network Technique to fashion and apparel industry. For these purpose, fist we define the Network Technique, and then we apply it to fashion show as an example. Only time component is considered in this study. Cost component can be dealt with later on in the project planning area.
Chemical mechanical polishing (CMP) technology has been widely used for global planarization of multi-level interconnection for ULSI applications. However, the cost of ownership and cost of consumables are relatively high because of expensive slurry. In this paper, we studied the mixed abrasive slurry(MAS). In order to save the costs of slurry, the original silica slurry was diluted by do-ionized water (DIW). And then, $ZrO_2$,$CeO_2$, and $MnO_2$ abrasives were added in the diluted slurry in order to promote the mechanical force of diluted slurry. We have also investigate the possibility of mixed abrasive slurry for the oxide CMP application.
한옥에서 축부는 건물의 외관과 실내 환경, 공사기간 및 공사비와 밀접한 관련을 지닌 부분이다. 본 연구에서는 전통적인 시공법을 분석하여 전통 한옥의 장점으로서의 특성을 유지하면서 개선된 한옥 축부의 시공법을 제안하였다. 그 개선안은 기성품의 사용, 전체 공정의 건식 조립공법화, 기둥과 벽체의 일괄 시공, 기밀성과 단열성능 향상 등의 특성을 지닌다. 앞으로 시제품의 제작과 성능 시험 등의 단계를 거쳐야 하겠지만 한옥의 형태적 특성을 유지하면서 공사기간과 공사비를 줄이는데 일조할 수 있을 것으로 기대한다.
In recent years, Korea's aviation industry has been developing rapidly due to the emergence of low-cost airlines. In order to survive in such competition, airlines are making various efforts to save the operation cost as much as possible. Fuel costs account for more than 25% of operating costs. For airlines, reducing aircraft fuel costs is an important part of improving profitability. In this study, analyzing the difference weight between flightplan and W&B Manifest for calculated the fuel that was unnecessarily loaded. As a method to calculate the unnecessary fuel was used by Airbus company flight planning program.
In this paper, a low-csst ECG system using a digital filter was implemented. After amplifying the analog ECG signal, it is converted into a digital signal and filtered. The developed ECG module is miniaturized by removing the analog filter element that occupies the existing volume and replacing it with a digital filter using a 3-stage Butterworth filter which is one of IIR filters. It uses a serial monitoring program with C# to check and save the ECG waveform measured on a computer screen. The ECG system using a developed digital filter in this paper uses a low-cost processor instead of an expensive, high-end processor, and its size and price are reduced by converting the analog filter to a digital filter. In addition, since the waveform of the developed ECG system is similar to the actual ECG waveform of MIT-BIU, it is considered that the existing analog filter can be replaced with the developed digital filter.
The 3th International Conference on Construction Engineering and Project Management
/
pp.1328-1333
/
2009
On the construction area, Information Technology (IT) has been a considerably significant part over the all phases; plan, design, procurement, construction and post-construction. For example, CALS, CITIC, PMIS, FMS, BIM and etc, designed and applied for managing construction industry are already valuable to improve on the Construction Management (CM). To develop these management methods, lots of mixed-systems are studied and progressed so far. In this paper, more useful and efficient system modules are proposed through investigating PMIS cases implemented, especially medical projects, to improve into FMS on the post-construction. Because most PMIS on the construction phase is used not to continue as FMS, considerable cost and time is consumed to rebuild the system, even both systems have common modules. As these wastes are faced to design systems, the important modules on PMIS are derived and analyzed to apply to FMS to save time and cost on CM.
Kyoungmin Kim ;Seok Kim ;Chan-Hyuk Park ;Kyong Ju Kim
국제학술발표논문집
/
The 1th International Conference on Construction Engineering and Project Management
/
pp.1193-1198
/
2005
The pre-assembly takes a large portion of the fabrication cost of steel bridges. In order to save the fabrication cost through the improvement of the conventional pre-assembling process, this research investigates a numerical pre-assembly simulation as an alternative to current pre-assembling process. The 3D laser scanning was utilized in site and measuring data for steel box were analyzed. The productivity of pre-assembly simulation system is compared with the conventional pre-assembling system. This paper identifies feasibility on the alternative pre-assembling process and then proposes the scheme of the pre-assembly simulation system development satisfying the current pre-assembly inspection of standards.
In this research, it is proposed that optimization method is introduced and applied to the design of pipeline system in multi-regional water supply project, which has been constructed to settle the regional unbalance problems of available water resources. For the purpose, interface programs are developed to integrate linear programming model and KYPIPE model which is used for optimization and hydraulic analysis, respectively. The developed program is applied to the pipeline system design of multi-regional water supply project. The optimal diameters from the application of linear programming technique are compared with those from conventional method that is time-consuming and tedious trail and error process. Since the conventional design largely depends upon the experience of designers and the results of general hydraulic analysis, it can not be reasonable and consistent. The application of linear programming technique can make it possible to design pipeline system optimally by using same design factors of general hydraulic models. The model can select commercial discrete pipe diameter as optimal size by using pipe length as decision variables. The developed model is applied to Pohang multi-regional water supply system design with two different objective functions, which are initial construction cost and annual cost including electric cost. As results, it is calculated that the initial construction cost of 1,449,740 thousand won is saved and annual cost of 128,951 thousand won is saved for a year within study year. Also, the optimal site of pump station is selected on 5th pipe, which is located between the diverging junction to Kangdong(2) province and the diverging junction to Cheonbuk province. It is explained that pump cost is less than pipe cost in this application case study due to little pump station scale. In the case of water supply with large pump capacity, it is reasonal that the increase of pipe size is more efficient instead the increase of pump station capacity to save annual cost.
Park, Jin-Young;Kim, Seo-Hoon;Jang, Cheol-Young;Kim, Jong-Hun;Lee, Seung-Bok
KIEAE Journal
/
제15권5호
/
pp.13-20
/
2015
Purpose: In order to upgrade the energy performance of existing building, energy audit stage should be implemented first because it is useful method to find where the problems occur and know how much time and cost consumption for retrofit. In overseas researches, three levels of audit is proposed whereas there are no standards for audit in Korea. Besides, most studies use dynamic simulation in detail like audit level 3 even though the level 2 can save time and cost than level 3. Thus, this paper focused on audit level 2 and proposed the audit method with the simple linear regression analysis model. Method: Two parameters were considered for the simple regression analysis, which were the monthly electric use and the mean outdoor temperature data. The former is a dependent variable and the latter is a independent variable, and the building's energy performance profile was estimated from the regression analysis method. In this analysis, we found the abnormal point in cooling season and the more detailed analysis were conducted about the three heat source equipments. Result: Comparing with real and predicted models, the total consumption of predicted model was higher than real value as 23,608 kWh but it was the results that was reflected the compulsory control in 2013. Consequently, it was analyzed that the revised model could save the cooling energy as well as reduce peak electric use than before.
The earth is a huge magnet. All organisms live under the magnetism of earth. The magnetism influences the ions in the cells of organisms and variously functions to lives as well. The medical treatment with magnet has come down from the ancient, it has an effect on the plants' growth. But there are no scientific studies about the influences of magnetism on plant growth. Accordingly, the experiment about the influence of magnetism on several foliage plants was carried out in this study. The promotion of plants' growth led by magnetism will be the method to save the management cost of horticultural market by early shipment. As a results of this experiment, plants treated with magnets showed excellent growth especially in length growth. The experiment results of the respective plants are the following. 1. Rhapis flabelliformis : This have grown so very well in the container lined with magnets as time goes by. Showing the significant(p<0.05) differences, the length growth of Height and Length of leaves was especially distinguished. 2. Howea belmoreana : This has grown well in all containers. Showing the significant(p<0.05) differences, the length growth of Height and Length of leaves was especially distinguished. 3. Chamaedorea seifrizii : There have been the growth differences between Height and Length of leaves as time goes by. The growth of Height and Length of leaves in the container lined with magnets has been excellent. The number of leaves and number of branch generally had no big differences but the growth of Height and Length of leaves was excellent in the magnet container. The method of plant growth promotion with magnet should save the management cost for this reason. Therefore the succeeding studies about the plant growth under the influence of magnet intensity and kind must be performed. The studies with various plants are needed to activate the program for growing plants with magnet.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.