• 제목/요약/키워드: Cost Estimation

검색결과 2,143건 처리시간 0.032초

Support Vector Regression을 이용한 소프트웨어 개발비 예측 (Estimating Software Development Cost using Support Vector Regression)

  • 박찬규
    • 경영과학
    • /
    • 제23권2호
    • /
    • pp.75-91
    • /
    • 2006
  • The purpose of this paper is to propose a new software development cost estimation method using SVR(Support Vector Regression) SVR, one of machine learning techniques, has been attracting much attention for its theoretic clearness and food performance over other machine learning techniques. This paper may be the first study in which SVR is applied to the field of software cost estimation. To derive the new method, we analyze historical cost data including both well-known overseas and domestic software projects, and define cost drivers affecting software cost. Then, the SVR model is trained using the historical data and its estimation accuracy is compared with that of the linear regression model. Experimental results show that the SVR model produces more accurate prediction than the linear regression model.

공동주택의 관리비 증감특성 연구 (A Study on the Maintenance Cost Elasticity of the Apartment Housing)

  • 이강희;채창우;박근수
    • 한국주거학회논문집
    • /
    • 제22권6호
    • /
    • pp.51-60
    • /
    • 2011
  • The maintenance cost depends on various factors such as building volume, floor area, number of household and so on. The maintenance cost of the apartment housing is affected by the maintenance type, building physical factor, sociogeographic aspects. Among these, the maintenance characteristics is represented and made up by the total floor area and number of household which means main factor to provide the building scale roughly. In this paper, it aimed at modelling the estimation function of the maintenance cost with the total floor area and number of household and analyzing the elasticity of the two factors. Although items of maintenance cost are various in general cost, repair cost and so on, we classified these items into the 5 categories. 5 categories are a general cost, a facility maintenance cost, a utilization cost, insurance and sanitary cost. The estimation function used a power function and it has better goodness-offitness than any other estimation methods in statistics. A power function has a three curve types with concave and convex and linear style to the origin.

지식정보 구축 대가의 개발 : 국가직무표준(National Competency Standards)과의 통합 방안을 중심으로 (A Development of a Framework Cost Estimation Model for the Digital Document Database Construction Projects)

  • 김소정;서용원;손영호
    • 한국IT서비스학회지
    • /
    • 제16권3호
    • /
    • pp.47-65
    • /
    • 2017
  • The reference guide for the cost of establishing the digital documents has been used as a basis for establishing the budget for the construction of the knowledge information resource. However, due to the abolition of the nominal unit price notification in terms of IT projects, it is necessary to conduct research to convert the standard of the current labor force grade standard to the national incompetency standard (NCS). In this study, we investigate and revise the system and contents of the current knowledge information cost estimation model. In specific, i) we conducted gap analysis of cost estimation model and existing NCS model. As the contents conforming for the construction of the knowledge information resource were not adoptable, we define the description of the construction of the knowledge information resource and to identify the core elements of NCS prior to the improvement of the cost model. ⅱ) then we proposed improve the cost model considering integration with newly proposed NCS model for knowledge information construction job. In order to ensure the validity of the application of NCS development and cost estimation model, the experts reviewed relevant contents and made plans for improvement by using experts from supply and demand groups of various fields of national knowledge informatization projects.

Parameter Impact Applied Case-based Reasoning Cost Estimation

  • Joseph Ahn;Hyun-Soo Lee;Moonseo Park;Sae-Hyun Ji;Sooyoung Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.475-478
    • /
    • 2013
  • To carry out a one-off construction project successfully, effective and accurate early cost estimation is crucial, especially during the conceptual stage where very limited minimum information of construction project is given. As the level of accuracy of the early cost estimation has huge impacts on precise budgeting and cost management of a project, in other words, reducing the risk of a project, cost must be managed with special awareness. In an effort to improve the estimate accuracy of cost during the conceptual stage, this research introduces a Parameter Impact (PI) which can quantify weights of parameters and rank them; and PI development derived from the principle of impulse in physics is explicated. For a case study, 76 public apartment building cases in Korea are analyzed. To examine the validity of the proposed PI, a validation in terms of CBR applicability test and estimate accuracy comparisons using 10-nearest neighbor cases are carried out. The validation results support that the suggested PI can be applied in quantifying the weights of the parameters and CBR method for early cost estimation.

  • PDF

설계평가를 위한 제조비용산정 시스템 (Cost Estimation System for Design Evalution)

  • 박홍석;이규봉
    • 한국정밀공학회:학술대회논문집
    • /
    • 한국정밀공학회 2000년도 추계학술대회 논문집
    • /
    • pp.281-284
    • /
    • 2000
  • For estimation manufacturing cost during the early design stage, desingers have to know compositon of manufacturmg cost. Manufacturing cost is summalion of material cost and processmg cost. To be able to control the manufacturmg cost, it is necessary to estimate the costs adequately and to store the cost data in a generic way. a generic system, which is the basis for the control of the production costs, takes into account geometric information, material information, process information and production planning information Manufacturing cost is summation of material cost and processing cost.

  • PDF

신뢰성 보정된 발사체 개발비용 추정방안 연구 (Studies for Reliability-corrected Cost Estimation Methodology of Launch Vehicle Development)

  • 김홍래;유동서;장영근
    • 한국항공우주학회지
    • /
    • 제40권4호
    • /
    • pp.364-374
    • /
    • 2012
  • 본 연구에서는 발사체의 개념설계 단계 동안 성능 변수뿐만 아니라 신뢰성에 따른 개발비용 추정방안을 분석하고자 하였다. 과거에는 발사체의 개발비용을 예측하기 위해서 주로 발사체의 성능과 건조 질량 등을 독립변수로 하는 추정 방법이 많이 이용되었다. 이러한 접근 방법은 비교적 근사하였지만 신뢰성 수준에 따른 비용 변화를 반영할 수 없기 때문에 원하는 신뢰성을 가진 발사체의 개발비용을 근접하게 예측하기는 쉽지 않았다. 본 논문에서는 이러한 비용추정 방법의 한계를 개선하기 위해 성능과 질량을 기반으로 한 비용 모델인 TRANSCOST에 신뢰성 개념을 도입하여 발사체 비용을 추정할 수 있는 방법론을 제시하였다. 이를 기반으로 신뢰성에 따른 한국형발사체(KSLV- II)의 개발비용을 추정했다.

융합시대의 이러닝 콘텐츠 개발대가 산정기준의 실효성 제고 정책 (A Study on Policy for Actualizing the Development Cost Estimation Guidelines of e-Learning Contents in Era of Convergence)

  • 노규성;한태인
    • 디지털융복합연구
    • /
    • 제13권9호
    • /
    • pp.49-56
    • /
    • 2015
  • 최근 정부는 이러닝 콘텐츠 개발의 대가 기준에 대한 조사를 기반으로 명확한 대가 기준을 수립하고 이러닝 산업의 특성을 반영한 이러닝 콘텐츠 개발 대가 산정 가이드라인(기준)을 공개하였다. 그러나 제도적인 뒷받침이 없으면 제도가 취지와 목적을 달성하지 못하고 사문서화될 소지를 안고 있어 정책적 기반 마련이 필요하다 이에 본 연구는 대가기준 활용 활성화를 위해 이론적 배경 정리와 분석을 통해 대가기준의 단계적 적용 활성화, 대가기준의 제정 고시 및 정기적 조정, 대가기준운영위원회 운영, 이러닝산업 실태조사와의 연계성, 저작권 공동 소유 문화 확산, 개발과정의 체계적인 모니터링, 대가기준 적용 활성화 정책 연구, 표준계약서와 연동을 통한 정책 실효성 제고 등의 정책을 제언하게 되었다.

시멘트 액체방수 공사의 작업조 기반 품셈을 위한 생산량 및 노무량 분석 (Analysis of Actual Labor and Productivity for Based Work Crew Standard of Cement Liquid Watertight Construction)

  • 하기주;최민권;이동렬;하민수;하재훈;김외곤
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.171-174
    • /
    • 2009
  • The standard estimation system, used to estimate the predetermined cost of construction work, is measured by the standard and typical construction methods and field conditions. And the standard estimation system is applied to basic data for the measuring of construction cost, such as the consumed quantity of material, labor hours, and machinery cost. However it does not reflect sufficiently for the diversity and reality of constructions work Therefore, this study is recognized the necessity of new cost estimation models for the rational construction cost estimation. To improve estimation technique and construction ability, it was analyzed labor hours, production volume based on the work crew in construction work.

  • PDF

스마트건설 공사비산정기준 사례조사 연구 - 일본사례를 중심으로 - (Case Study on the Cost Estimation standard for Smart Construction - Focused on Japan)

  • 송태석;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2020년도 봄 학술논문 발표대회
    • /
    • pp.171-172
    • /
    • 2020
  • Recently, the need for smart construction technologies related to the Fourth Industrial Revolution has been increasing in order to improve productivity of the construction industry. The Ministry of Land, Infrastructure and Transport has established Smart construction technology road map to commercialize the smart construction, and research and development is also underway. However, due to the lack of cost estimation standards for such smart construction technologies to be deployed to actual sites, smart construction technologies are not actively applied to construction sites. In particular, cost estimation standards are needed for construction machinery equipment with ICT technology that is currently available for commercialization. Therefore, as a preliminary study for the development of smart construction cost estimation standards, a case study was conducted on ICT construction estimation standards in Japan and present them as basic data for standards in Korea.

  • PDF

비용을 고려하고 아키텍처 평가를 지원하는 소프트웨어 아키텍처 비용 추정 기법 (A Software Architecture Cost Estimation Method to Support Architecture Evaluation with Consideration of Cost)

  • 조시호;이준하;박수용
    • 한국정보과학회논문지:소프트웨어및응용
    • /
    • 제37권2호
    • /
    • pp.95-103
    • /
    • 2010
  • 소프트웨어 제품의 시장 경쟁력을 향상시키기 위해서는 이해관계자의 요구사항에 부합하는 품질을 제공하는 동시에 개발 예산 내에 개발 가능한 아키텍처를 획득할 수 있는 방안이 요구된다. 하지만 아키텍처의 품질 검토 및 선정을 위해 사용되는 기존 아키텍처 평가 기법은 아키텍처 설계를 통해 획득 가능한 품질속성에만 초점을 맞추고 있어 아키텍처가 개발 비용에 미치는 영향을 체계적으로 고려하지 않는다. 본 논문에서는 소프트웨어 비용 추정 모델인 COCOMO II를 적용한 아키텍처 비용 추정 기법을 제안하여 기존 아키텍처 평가와 병행 가능한 비용 분석을 통해 기존 아키텍처 평가 기법을 보완하며 품질과 비용이 함께 고려된 아키텍처 선정을 지원한다. 제안 기법의 정확성 검증을 위해 본 논문의 기법을 RPS (Robot Patrol System)의 아키텍처 후보 목록에 적용한 뒤 비용 추정 결과를 각 아키텍처 후보의 실측 공수와 비교하였다.