Transactions of the Korean Society for Noise and Vibration Engineering
/
v.24
no.8
/
pp.600-605
/
2014
Two mufflers for a large-size sedan are suggested aiming (1) sporty-sound and (2) quiet-sound as well as both satisfying low back-pressure and low manufacturing cost. Transmission loss prediction considering heat and flow may increase the accuracy and reduce the development cost in muffler design; thus, GT-power prediction considering heat, flow, and acoustics is utilized. By understanding the fundamentals of flow-acoustic theory in small orifice(hole), an effective muffler design concept is proposed. Vehicle tests show the consistence with predictions for sound; also a back-pressure test bench confirms the advantage in pressure drop for both suggested mufflers. Those suggested mufflers also have advantages in manufacturing cost due to simplicity of the design.
Kim, Ho-Yeon;Hong, Young-Soo;Noh, Joo-Young;Eom, Yun-Seong;Kim, Cheol-Man
Journal of Energy Engineering
/
v.17
no.3
/
pp.139-144
/
2008
Recently due to march as the high oil price, It is necessary for Korea to grope a plan, which is to increase the energy efficiency of existing facilities as well as to develop overseas gas and oil resources. With this point, this work carried out to approach the high pressure LNG pipeline network of Inchon receiving terminal with Newton method as corrective flowrate. We found that the high pressure network mainly depends on FCVs(Flow Control Valves). The high pressure pump showed the maximum efficiency at the FCVs of 50% opening and could discharge LNG only above the LNG head of 1,500m from a system curve obtained. The operating cost of pumps was estimated from their operating points. We compared the operating cost under normal operation with the operating cost under maximum efficiency. Especially, we obtained the day savings of a year as wells as the hour savings of a day. From the results, the high pressure network win be able to reduce the operating cost of 138 million wons in a year. This means that a pump can reduce the operating cost of 9,823 thousands won. Consequently, this work could find the operating features of the pumps under the complicated high pressure LNG network and the savings effect of the pump operating cost. Also, the results will be able to macroscopically contribute the heightening of national energy competitiveness as well as to microscopically contribute the future effective operation of LNG receiving terminal.
Time and cost of construction are key factors in decision-making during a tunnel project's planning and design phase. Estimations of time and cost of tunnel construction projects are subject to significant uncertainties caused by uncertain geotechnical and geological conditions. The Gaussian Process Regression (GPR) technique for predicting ground condition and construction time and cost of mountain tunnel projects is used in this work. The GPR model is trained with data from past mountain tunnel projects. The model is applied to a case study in which the predicted time and cost of tunnel construction using the GPR model are compared with the actual construction time and cost for model validation and reducing the uncertainty for the future projects. In addition, the results obtained from the GPR have been compared with to other models of artificial neural network (ANN) and support vector regression (SVR) that the GPR model provides more accurate results.
Kim, In Kyum;Lee, Jun S.;Choi, Il Yoon;Lee, Hoo Seok
Journal of the Korean Society for Railway
/
v.20
no.2
/
pp.275-287
/
2017
During the feasibility study of new rail lines, maintenance cost of railway infrastructure has mostly been estimated based on the track length and on simplified parameters; however, the estimation reliability can be improved by employing the correction factor from UIC 715, as well as the line classification in UIC 714. The correlations between maintenance cost and various parameters such as weighted track length based on line classification, radius of curvature, gradient and worn -out rate have been analyzed according to the case studies. Prediction of the maintenance cost has been carried out using the cost data, which were representative of the whole cost data; as a result, it was demonstrated that a cost model based on the line classification and the correction factor was more reliable than the existing models. Furthermore, possibilities of using data from both the track measurement vehicle and from the maintenance information system, which are under development, have been investigated and, based on this investigation, a combined cost model using line classification, radius of curvature, gradient and worn-out rate, among other factors, will be proposed in the near future.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.11
/
pp.128-134
/
2016
Estimating the repair and reinforcement (R&R) costs for each bridge member is essential for managing the life cycle of a bridge using a bridge management system (BMS). Representative members of a bridge were defined in this study, and detailed and representative R&R methods for each one were drawn in order to develop a systematic maintenance cost model that is applicable to the BMS. The unit cost for each detailed R&R method was established using the standard of estimate and historical cost data, and a systematic procedure is presented using an integration program to enable easy renewal of the R&R unit cost. Also, the average unit cost of the representative R&R methods was calculated in the form of a weighted average by considering the unit cost and application frequency of each detained R&R method. The appropriateness of the drawn average unit cost was reviewed by comparing and verifying it with the previous historical unit cost. The suggested average R&R unit cost can be used to review the validity of the required budget or the appropriateness of the R&R performance cost in the stage to establish the bridge maintenance plan. The results of this study are expected to improve the reliability of maintenance cost information and the rationality of decision making.
Park, Young Cheol;Lee, Tai-yong;Park, Jaehyeon;Ryu, Ho-Jung
Korean Chemical Engineering Research
/
v.47
no.1
/
pp.65-71
/
2009
In this study, performance and economic analysis of natural gas/syngas fueled 100 MWth chemical-looping combustion (CLC) combined cycle plant were performed. Net efficiency of both cases was 53~54%, corresponding to previous research. We used Chemical Engineering Plant Cost Index and Guthrie method to evaluate plant cost. For syngas fueled CLC combined cycle plant, the plant cost was higher since lower heating value(LHV) of syngas was lower than that of natural gas and cost of electricity(COE) was also higher since the cost of syngas was higher than that of natural gas. By sensitivity analysis, it was shown that the cost of syngas should be less than 5.3 $/GJ in order to make COE lower than 5.8 ¢/kWh which was COE of natural gas fueled CLC combined cycle plant.
In the telecommunication industry, estimation of the cost of network facilities is very important since depreciation cost of the facilities accounts for a large portion of the product cost. Moreover, cost estimation in the industry becomes more difficult because of increasing indirect cost upon digital convergence, expanding multi-purpose facilities, complexity of service product, etc. Nevertheless, not much seem to have been done in improving estimation methodology of the cost of network facilities. As a result, the quality of cost information on network facilities has deteriorated, and now even decision-makers in the industry dismiss the information. Recently, two major telecommunication companies adopted a new network cost estimation method to deal with the issue. In this paper, we study the concept of new cost estimation method and the procedure to develop and apply it. We also suggest the method to carry out the cost allocation using Matlab which is more efficient and time-saving than other commercial cost calculation packages.
Kim, Seul-Ki;Cho, Kyeong-Hee;Kim, Jong-Yul;Kim, Eung-Sang
The Transactions of The Korean Institute of Electrical Engineers
/
v.62
no.10
/
pp.1390-1396
/
2013
The paper estimated the reasonable market price of lead-acid battery energy storage system (BESS) intended for demand management of electricity customers. As time-of-use (TOU) tariffs have extended to a larger number of customers and gaps in the peak and off-peak rates have gradually risen, deployment of BESS has been highly needed. However, immature engineering techniques, lack of field experiences and high initial investment cost have been barriers to opening up ESS markets. This paper assessed electricity cost that BESS operation could save for customers and, based on the possible cost savings, estimated reasonable prices at which BESSs could become a more prospective option for demand management of customers. Battery scheduling was optimized to maximize the electricity cost savings that BESS would possibly achieve under TOU tariffs conditions. Basic economic factors such as payback period and return on investment were calculated to determine reasonable market prices. Actual load data of 12 industrial customers were used for case studies.
Seo, Ho-Seok;Song, Kyo-Young;Jeon, Hae-Myung;Park, Cho-Hyun
Journal of Gastric Cancer
/
v.12
no.2
/
pp.126-131
/
2012
Purpose: We developed a standardized critical pathway for gastric cancer surgery and then determined the increase of application, which resulted in an improvement in terms of measurable indices, such as hospital stay and cost. Materials and Methods: A critical pathway was revised and used widely from the 2nd quarter of 2009. We collected clinical data, such as length of stay and complication rate, as clinical indices of quality prospectively. The total cost paid at the patient's discharge, as well as the daily hospital income, were calculated and compared by each quarter from January 2008 to December 2009. Results: The application rate of critical pathway was 11.8% and 87.8% in 2008 and 2009, respectively. There were no perioperative deaths. There was no difference in the complication rates between 2008 and 2009 (P=0.45). However, the mean length of stay was significantly different between the 2 years (P<0.05). Although the total cost was not different, the daily hospital income was significantly higher in the latter year (P<0.05). Conclusions: An increase in the application of critical pathway for gastrectomy resulted in significant decreases in length of stay and increases in the daily hospital income without a compromise on the clinical indices.
Korean Journal of Construction Engineering and Management
/
v.22
no.2
/
pp.42-52
/
2021
The cost of remodeling parking lots of apartment houses accounts for about 20 percent of the total cost of remodeling. This means that when the remodeling cost of the underground parking lot is known, it becomes possible to estimate the total construction cost. The standard of estimation referenced when calculating the construction cost is difficult to apply to calculating the remodeling cost. Thus, a construction cost estimation model that reflects the characteristics of remodeling construction is necessary. This study developed a basic construction cost estimation model for expansion remodeling of underground parking lots of apartment houses that calculates the approximate cost of construction by reflecting the characteristics and design elements of remodeling. Based on literature review and consultation with experts, 37 activities of underground parking lot remodeling construction were derived. In order to enable calculation of approximate construction cost before the remodeling design drawing is finalized, the quantity calculation formula and unit price for each activity were presented. Based on expert advice, 13 factors that affect the increase in construction cost and weights of each factor were determined. As a result of applying three cases of remodeling complexes to the basic cost estimation model, the accuracy was confirmed to be 93 percent on average.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.