• Title/Summary/Keyword: Coordinated Inventory Management

Search Result 13, Processing Time 0.017 seconds

Coordination Under Price Protection, Mid/End Life Returns, and Quantity Discount for a Three-Level Supply Chain (가격보호 정책, 반품 정책과 물량할인 정책을 사용한 3단계 공급사슬의 협력방안)

  • Lee, Chang-Hwan
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.30 no.3
    • /
    • pp.17-39
    • /
    • 2005
  • The coordination of a three-level supply chain consisting of a supplier, a retailer, and a discount outlet (DCO) is studied here. We assume that the product is sold in two consecutive periods a Normal Sales Period (NSP) and a subsequent Clearance Salvage Period (CSP). A benchmark case is studied Initially in which the supply chain is coordinated by a s1n91e agent. Thus, the supplier the retailer, and the discount outlet design a common system that allows centralized decision making about stocking quantities, markdown time schedules, and policies on disposing of leftovers to deliver the greatest possible expected supply chain profit. Next, we consider a decentralized supply chain. Here, decisions are made without coordination. The objective is to maximize an individual party's expected profits. The focus of the study is on the following questions: what factors make the coordination an effective approach for the supply chain? How do we coordinate the supply chain so as to maximize the supply chain Joint expected profit? These and other related study issues are explored in this paper.

Priority for Developing Emission Factors and Quantitative Assessment in the Forestry Sector (산림부문의 국가온실가스 배출·흡수계수 개발 필요 우선순위 및 정량평가 방법론)

  • Han, Seung Hyun;Lee, Sun Jeoung;Chang, Hanna;Kim, Seongjun;Kim, Raehyun;Jeon, Eui-Chan;Son, Yowhan
    • Journal of Climate Change Research
    • /
    • v.8 no.3
    • /
    • pp.239-245
    • /
    • 2017
  • This study aimed to suggest priority for developing emission factor (EF) and to develop the methodology of quantitative assessment of EF in the forestry sector. Based on the stock-difference method, 17 kinds of EFs (27 EFs based on forest types) were required to calculate the carbon emission in the forestry sector. Priority for developing EFs followed the standards, which is a development plan by the government agency, importance of carbon stock for greenhouse gas, and EFs by the species. Currently, the most urgent development of EFs was carbon fraction in biomass and carbon stock in dead wood. Meanwhile, the quantitative assessment of EF consisted of 7 categories (5 categories of compulsory and 2 categories of quality evaluation) and 12 verification factors. Category in compulsory verification consisted of administrative document, determination methodology of emission factors, emission characteristic, accuracy of measurement and analysis, and data representative. Category in quality evaluation consisted of data management and uncertainty estimates. Based on the importance of factors in the verification process, each factor was scored separately, however, the score needs to be coordinated by the government agency. These results would help build a reliable and accurate greenhouse gas inventory report of Korea.

Development of Intelligent ATP System Using Genetic Algorithm (유전 알고리듬을 적용한 지능형 ATP 시스템 개발)

  • Kim, Tai-Young
    • Journal of Intelligence and Information Systems
    • /
    • v.16 no.4
    • /
    • pp.131-145
    • /
    • 2010
  • The framework for making a coordinated decision for large-scale facilities has become an important issue in supply chain(SC) management research. The competitive business environment requires companies to continuously search for the ways to achieve high efficiency and lower operational costs. In the areas of production/distribution planning, many researchers and practitioners have developedand evaluated the deterministic models to coordinate important and interrelated logistic decisions such as capacity management, inventory allocation, and vehicle routing. They initially have investigated the various process of SC separately and later become more interested in such problems encompassing the whole SC system. The accurate quotation of ATP(Available-To-Promise) plays a very important role in enhancing customer satisfaction and fill rate maximization. The complexity for intelligent manufacturing system, which includes all the linkages among procurement, production, and distribution, makes the accurate quotation of ATP be a quite difficult job. In addition to, many researchers assumed ATP model with integer time. However, in industry practices, integer times are very rare and the model developed using integer times is therefore approximating the real system. Various alternative models for an ATP system with time lags have been developed and evaluated. In most cases, these models have assumed that the time lags are integer multiples of a unit time grid. However, integer time lags are very rare in practices, and therefore models developed using integer time lags only approximate real systems. The differences occurring by this approximation frequently result in significant accuracy degradations. To introduce the ATP model with time lags, we first introduce the dynamic production function. Hackman and Leachman's dynamic production function in initiated research directly related to the topic of this paper. They propose a modeling framework for a system with non-integer time lags and show how to apply the framework to a variety of systems including continues time series, manufacturing resource planning and critical path method. Their formulation requires no additional variables or constraints and is capable of representing real world systems more accurately. Previously, to cope with non-integer time lags, they usually model a concerned system either by rounding lags to the nearest integers or by subdividing the time grid to make the lags become integer multiples of the grid. But each approach has a critical weakness: the first approach underestimates, potentially leading to infeasibilities or overestimates lead times, potentially resulting in excessive work-inprocesses. The second approach drastically inflates the problem size. We consider an optimized ATP system with non-integer time lag in supply chain management. We focus on a worldwide headquarter, distribution centers, and manufacturing facilities are globally networked. We develop a mixed integer programming(MIP) model for ATP process, which has the definition of required data flow. The illustrative ATP module shows the proposed system is largely affected inSCM. The system we are concerned is composed of a multiple production facility with multiple products, multiple distribution centers and multiple customers. For the system, we consider an ATP scheduling and capacity allocationproblem. In this study, we proposed the model for the ATP system in SCM using the dynamic production function considering the non-integer time lags. The model is developed under the framework suitable for the non-integer lags and, therefore, is more accurate than the models we usually encounter. We developed intelligent ATP System for this model using genetic algorithm. We focus on a capacitated production planning and capacity allocation problem, develop a mixed integer programming model, and propose an efficient heuristic procedure using an evolutionary system to solve it efficiently. This method makes it possible for the population to reach the approximate solution easily. Moreover, we designed and utilized a representation scheme that allows the proposed models to represent real variables. The proposed regeneration procedures, which evaluate each infeasible chromosome, makes the solutions converge to the optimum quickly.