• 제목/요약/키워드: Cooling power

검색결과 1,667건 처리시간 0.031초

냉각탑 성능 예측을 위한 프로그램 개발 (Program Development for the Prediction of Cooling Tower Performance)

  • 정재형;정재현;최영기
    • 설비공학논문집
    • /
    • 제26권3호
    • /
    • pp.130-136
    • /
    • 2014
  • The present study is performed to set up the framework of cooling tower performance predictions. The performance of mechanical forced draft cooling tower is directly related to the state of a nuclear power plant system, such as the condenser and evaporator. The main parameters related to the state of systems are as follows : wet bulb temperature, dry bulb temperature and absolute humidity. The performance evaluation of cooling tower must be considered at the power plant design. In this study, the toolkit developed by the American Cooling Tower Industry association (CTI) has been used for the framework construction. In order to validate the framework, it is being applied to the cooling tower constructed for the U.S. Nuclear Power Plant. The test results have shown good agreements with the cold water temperature on the cooling tower performance curves provided by manufacturers.

가스냉방 전력대체효과 분석 (Analysis of Electric Power Peak-Cut Effect by Gas Cooling)

  • 정시영;김대환;박기웅
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.208-211
    • /
    • 2009
  • To reduce the peak demand the promotion of gas cooling(absorption chillers and GHPs) is required. In this study the effect of electric power peak-cut has been analyzed using two methods. One is based on monthly LNG consumption data and the other is using the gas cooling capacity installed. Both methods agreed well with each other within the uncertainty of 20%. It was found that the gas cooling had the peak cut effect of 1,500-2,000 MW for recent 5 years (2003 - 2007). The ratio of gas cooling to the whole cooling demand was 12-15%, which is needed to be increased.

  • PDF

한전 초전도 전력케이블 냉각시스템 설치 및 시험 (Installation and Performance Test of Cooling System for the KEPCO HTS Power Cable)

  • 양형석;김동락;이병섭;최연석;류희석;손송호;임지현;황시돌
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제9권1호
    • /
    • pp.82-85
    • /
    • 2007
  • A cooling system for a 22.9kV, 1.25kA 100m HTS power cable has been installed and tested. The cooling system consists of decompression cooling system with the cooling capacity of 3kW and a closed circulation system of subcooled liquid nitrogen. This paper describes the outline of the installed cooling system and performance test results.

Cryogenic cooling system for HTS cable

  • Yoshida, Shigeru
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제19권2호
    • /
    • pp.1-8
    • /
    • 2017
  • Recently, Research and development activity of HTS (High Temperature Superconducting) power application is very progressive worldwide. Especially, HTS cable system and HTSFCL (HTS Fault current limiter) system are proceeding to practical stages. In such system and equipment, cryogenic cooling system, which makes HTS equipment cooled lower than critical temperature, is one of crucial components. In this article, cryogenic cooling system for HTS application, mainly cable, is reviewed. Cryogenic cooling system can be categorized into conduction cooling system and immersion cooling system. In practical HTS power application area, immersion cooling system with sub-cooled liquid nitrogen is preferred. The immersion cooling system is besides grouped into open cycle system and closed cycle system. Turbo-Brayton refrigerator is a key component for closed cycle system. Those two cooling systems are focused in this article. And, each design and component of the cooling system is explained.

하나로 2 차 냉각탑의 공장분해수리 (Cooling Tower Overhaul of Secondary Cooling System in HANARO)

  • 박용철;이용섭;김양곤;정환성;임인철
    • 대한기계학회:학술대회논문집
    • /
    • 대한기계학회 2007년도 춘계학술대회B
    • /
    • pp.2714-2719
    • /
    • 2007
  • HANARO, an open-tank-in-pool type research reactor of 30 MWth power in Korea, has been operating normally since its initial criticality in February, 1995. For the last about ten years, A cooling tower of a secondary cooling system has been operated normally in HANARO. Last year, the cooling tower has been overhauled for preservative maintenance including fills, eliminators, wood support, water distribution system, motors, driving shafts, gear reducers, basements, blades and etc. This paper describes the results of the overhaul. As results, it is confirmed that the cooling tower maintains a good operability through a filed test. And a cooling capability will be tested when a wet bulb temperature is maintained about 28 $^{\circ}C$ in summer and the reactor is operated with the full power.

  • PDF

냉각공기 예냉각과 연료예열에 의한 복합발전 시스템의 성능변화 (Performance Variation of a Combined Cycle Power Plant by Coolant Pre-cooling and Fuel Pre-heating)

  • 권익환;강도원;김동섭;김재환
    • 한국유체기계학회 논문집
    • /
    • 제15권3호
    • /
    • pp.57-63
    • /
    • 2012
  • Effects of coolant pre-cooling and fuel pre-heating on the performance of a combined cycle using a F-class gas turbine were investigated. Coolant pre-cooling results in an increase of power output but a decrease in efficiency. Performance variation due to the fuel pre-heating depends on the location of the heat source for the pre-heating in the bottoming cycle (heat recovery steam generator). It was demonstrated that a careful selection of the heat source location would enhance efficiency with a minimal power penalty. The effect of combining the coolant pre-cooling and fuel pre-heating was also investigated. It was found that a favorable combination would yield power augmentation, while efficiency remains close to the reference value.

태양광발전 어레이 표면의 냉각/세정에 대한 장기 실증 실험 (Long-term Experiments of the Cooling/Cleaning on the surface of the PV Power Array)

  • 한준선;김이현;지희관;유상필
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2012년도 춘계학술발표대회 논문집
    • /
    • pp.248-254
    • /
    • 2012
  • In the situation of expanding domestic solar power supply business long-term performance modeling of a proposed solar-cooling and cleaning system to increase electromotive force and light transmission is carried out to test the effectiveness of the system. To test the effectiveness of the system, the data which comparing the solar power planet installing the system to not installing at the same time is used. A difference between the utilization factor of each comparison group were recorded. Approximately from one year to two years Field Test was performed, Result of apply to cooling/cleaning technology, Each of plant by From least 7 percent up to 16 percent utilization factor increased, and the cooling / cleaning is output through improved as a result of the determined.

  • PDF

디젤발전 자켓냉각시스템 열성능 향상 연구 (Performance Research of a Jacket Cooling Water System in a Diesel Electric Generation)

  • 이재근;문전수;윤석원;박필양
    • 한국수소및신에너지학회논문집
    • /
    • 제20권6호
    • /
    • pp.534-539
    • /
    • 2009
  • One of the most efficient techniques improving the heat transfer performance of a diesel electric generation is a corrosion control in jacket cooling water system. The environmental parameters most affecting corrosion are dissolved salt concentration, temperature, and pH of cooling water. No corrosion occurs in carbon steel probe at pH 11 in normal operating condition of diesel electric generation cooling water. pH control agent in this study is trisodium phosphate. pH control appears to be the most convenient way to enhance the thermal performance of a diesel electric generation.

건물냉난방설비관련 전력피크관리사업 지원방안 연구 (The research on supporting method of electric peak management for building facilities of heating and cooling)

  • 양승권;이한별
    • 한국조명전기설비학회:학술대회논문집
    • /
    • 한국조명전기설비학회 2008년도 추계학술대회 논문집
    • /
    • pp.379-382
    • /
    • 2008
  • This paper gives the support method of DSM program(power load leveling for heating and cooling facilities on building). As the national power peak load increases recently, the peak load reduction is needed. So we studied about remote controlling of power load from heating/cooling facilities on building during peak times. To adopt new DSM program, it is very important to design DSM customer supporting system. So in this paper, we dealt with the result of customer survey, and the DSM potential regarding heating/cooling facilities on building. In conclusion, the peak reduction program of heating/cooling facilities is very important and the incentive of customer should be consist of two incentive types as an installation and power reduction.

  • PDF

HILS 기반의 수중체 냉각 시스템 개선 (Improvement of Submarine Cooling System using HILS Simulation)

  • 정성영;오진석
    • 대한조선학회논문집
    • /
    • 제49권5호
    • /
    • pp.376-383
    • /
    • 2012
  • Owing to rapid development of power device and inverters, most of submarines adopt an eletric propulsion system. Although PMPM(Permanent Magnet Propulsion Motor) propulsion system has relatively higher power, energy conversion efficiency and smaller volume than engine propulsion system, it also produces large amount of heat due to current flowing inside motor coils and change of magnetic field induced by iron core. The produced heat in stator and inverter largely affects motor efficiency and bearing lubrication and causes thermal aging while the system is on operation. So, we analyze the existing cooling system and submarine ESS (Energy Saving System) cooling system whose power consumption is reduced. HILS(Hardware In the Loop System) technique is used for the modelling of the submarine cooling system. To confirm the ESS cooling system characteristic, HILS is simulated using LabVIEW with hardware. As a result, the ESS cooling system has the characteristic of better temperature stability and less power consumption than the existing one.