• 제목/요약/키워드: Conventional project

검색결과 452건 처리시간 0.028초

A STUDY ON ANALYSIS OF DELIVERY & CONTRACT SYSTEM FOR INTRODUCTION OF THE INTEGRATED PROJECT DELIVERY (IPD) TO KOREA - Focusing on Delivery and Contract of Public Works -

  • Sulmin Song;Seong-Ah Kim;Yea-Sang Kim;Sangyoon Chin
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.142-148
    • /
    • 2011
  • Recently, much attention has been increasingly paid to the efficiency of the delivery system in order to manage construction project in a smooth and effective way. The integrated plan in consideration of the life cycle of building is required for the effective and integrated management of information in a huge amount. To this end, collaboration between each field is indispensable from the beginning of project. But there is a limitation that the designer and the constructor sign the contract separately in the conventional delivery system. In the US, the recent trend is that the Integrated Project Delivery (IPD) has been introduced to improve the effectiveness of project management in an increasing number of the cases where project is implemented by utilizing the IPD. In Korea, there is also an increasing need to introduce the IPD for the integrated project management. Consequently, the purpose of this study is to examine and analyze the laws and the contracts that are applied to domestic cases of placing order and signing contract based on the concept and principle of the IPD before the actual introduction of the IPD. Based on such examination and analysis, this study intends to figure out the constraints to the introduction of the IPD. It is expected that the results of this study will be used as basic data for IPD-related study in the future.

  • PDF

공급자 관점에서 정보시스템 개발 프로젝트의 범위관리활동이 프로세스성과와 결과물성과에 미치는 영향에 대한 연구 (The Effects of Scope Management on Process Performance and Output Performance in the Information System Development Project : An Analysis from Project Supplier's Perspective)

  • 박봉구;임규건;유원상
    • 한국IT서비스학회지
    • /
    • 제8권3호
    • /
    • pp.83-100
    • /
    • 2009
  • Even though the success of the information system (IS) protect becomes a critical issue to an enterprise and there has been a lot of research about finding critical success factors of IS projects, the scope management for the success of IS protect has received little attention in the literature. The purpose of this research is to investigate the effects of the project scope management activities defined by PMI (Project Management Institute) on the performance of the information system project. The focus of this paper is on the project supplier's point of view. This study shows the priority of the scope management activities during the IS Project. The results show the different results depending on the types of the project clients and the project scale. This research reveals that the scope verification is important for the project supplier from the project process view, and that the scope planning/definition is important for the protect client from the project result view. It also shows different results comparing to the conventional recognition about project success. The research results show that the positive relationships between the project scale and the importance of scope management activities, and between the familiarity of suppliers and clients and the importance of the scope management activities. Through this research, we expect that the importance of the scope management in a project will be considered as an important issue, and that this research will lead to various detailed research about this issue.

AN INTEGRATED REAL OPTION-RISK MANAGEMENT FRAMEWORK FOR PPP/PFI PROJECTS

  • Jicai Liu;Charles Y.J. Cheah
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.729-738
    • /
    • 2007
  • The Public Private Partnership/Private Finance Initiative (PPP/PFI) schemes have made the private sector become a major participant involved in the development of infrastructure systems along with the government. Due to more integrated efforts among project participants and longer concession period, PPP/PFI projects are inherently more complex and risky. It is therefore very important to proactively manage the risks involved throughout the project life cycle. Conventional risk management strategies sometimes ignore managerial flexibility in the planning and execution process. This paper starts with a revised risk management framework which incorporates the real option concept. Following the presentation of the framework, a new risk classification is proposed which leads to different ways of structuring options in a project according to the stage of the project life cycle. Finally, the paper closes by discussing other issues concerning option modeling and negotiation.

  • PDF

NEW INTELLIGENT APPROACH FOR PROJECT MANAGEMENT IN CONSTRUCTION INDUSTRY

  • D. Aparna;D. Sridhar;J. Rajani;B. Sravani;V.S.S. Kumar
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.366-370
    • /
    • 2005
  • The construction environment is dynamic in nature and is characterized by various degrees of uncertainties. The uncertainties such as lack of coordination, non availability of resources, condition of temporary structures and varying weather conditions have a significant impact on estimating the duration of activities. These are subjective, vague and imprecisely defined and are expressed in subjective measures rather than mathematical terms. Conventionally, various quantitative techniques such as CPM and PERT have emerged in construction industry. These techniques cannot solve the above problems and rely on human experts which may not always be possible. In such situations Artificial Intelligence tools such as fuzzy sets and neural networks handle such variables and provide global strategies. The present paper evaluates the effect of qualitative factors to identify the activity duration using new intelligent approach. The results are compared with conventional methods for effective project management. A case study is considered to demonstrate the applicability of fuzzy logic for project scheduling.

  • PDF

A Stochastic Linear Scheduling Method using Monte Carlo Simulation

  • Soderlund, Chase;Park, Borinara
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.169-173
    • /
    • 2015
  • The linear scheduling method or line-of-balance (LOB) is a popular choice for projects that involve repetitive tasks during project execution. The method, however, produces deterministic schedule that does not convey a range of potential project outcomes under uncertainty. This results from the fact the basic scheduling parameters such as crew production rates are estimated to be deterministic based on single-point value inputs. The current linear scheduling technique, therefore, lacks the capability of reflecting the fluctuating nature of the project operation. In this paper the authors address the issue of how the variability of operation and production rates affects schedule outcomes and show a more realistic description of what might be a realistic picture of typical projects. The authors provide a solution by providing a more effective and comprehensive way of incorporating the crew performance variability using a Monte Carlo simulation technique. The simulation outcomes are discussed in terms of how this stochastic approach can overcome the shortcomings of the conventional linear scheduling technique and provide optimum schedule solutions.

  • PDF

Evaluation of Marginal and Internal Integrity of Modified Resin-Bonded Fixed Partial Dentures: An In Vitro Study

  • Ahn, Sung-Hyeon;Choi, Jae-Won;Jeon, Yong-Chan;Jeong, Chang-Mo;Yoon, Mi-Jung;Lee, So-Hyoun;Huh, Jung-Bo
    • Journal of Korean Dental Science
    • /
    • 제10권1호
    • /
    • pp.29-34
    • /
    • 2017
  • Purpose: The purpose of this study was to evaluate the microleakage of various types of resin-bonded fixed partial dentures (RBFPDs) after artificial aging. Materials and Methods: Forty models with missing first molar were fabricated using artificial resin teeth and were divided into four groups: Group A, conventional RBFPDs design; Group B, modified RBFPDs design; Group C, assembled 3-piece RBFPDs design; and Group D, assembled 3-piece RBFPDs with different occlusal rest positions. Half of the specimens underwent chewing simulation process (240,000 cycles, 50 N load, 1.7 Hz) and thermocycling (temperatures $5^{\circ}C{\sim}55^{\circ}C$, dwelling time 30 seconds) and the remaining 20 specimens didn't receive any treatment. All the specimens were immersed in 2% methylene blue solution for 24 hours to evaluate microleakage, and were sectioned at the middle part of abutment teeth. To evaluate the microleaskage, a dye penetration was calculated. Result: With artificial aging, cyclic loading and thermocycling, a 3-piece RBPFD and a 2-piece RBPFD using original tooth undercuts have significantly lower microleakge (P<0.05) compared to the conventional design of RBPFD and modified RBPFD. Conclusion: Within the limit of this experiment, the assembled RBFPDs exhibited a smaller microleakage than the conventional RBFPDs, implying that the assembled RBFPDs can be more effective for reducing the dislodgement of the RBFPDs.

Risk Analysis on Offshore Windfarm Industry in South Korea: Based on the Jeonnam Offshore Windfarm Project

  • Kim, Tae Hyun;Kim, Yea-Sang;Chin, Sangyoon;Pallesen, Kristian
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.204-212
    • /
    • 2022
  • Recently, the Korean government has been actively promoting the smart city as their strategic agenda. However, to build smart cities that are greener, the authors believe it is essential to rapidly transit conventional energy sources such as fossil fuels to renewable energy. Although there is a big potential for Offshore wind in Korea, there has not been a full-scale commercial offshore wind farm until today. Since Korea is relatively a new market compared to the EU, it can be risky for developers. The authors will introduce risk management best practices in the offshore wind industry applicable to the Korean environment. This paper will mainly introduce an offshore wind project size of 99 MW. The project is expecting a Finance Close (FC) in Q3 2022, so the project team has prepared a risk register with over 150 risks and levers throughout the project lifecycle. Overall risks include risks with Development Expenditure (DEVEX) impact, a Capital Expenditure (CAPEX) impact, and an Operating Expenditure (OPEX) impact. Based on the identified risks, a more qualitative assessment of Cost and Schedule Impact was conducted. In conclusion, a Monte Carlo simulation was performed to propose a quantitative risk assessment to evaluate a benchmark contingency of the project cost.

  • PDF

기존선에서 고속전철 운행시 소음평가 (Noise Effects of High Speed Train on Coventional Track)

  • 나희승
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2002년도 추계학술대회 논문집(II)
    • /
    • pp.948-953
    • /
    • 2002
  • As the delay of the Kyungbu High Speed Railroad, HST should use conventional line through Daegoo to Pusan until the new railroad build. High speed railroad noise is one of the main causes of environmental impact. Whenever HST on conventional railroad line is planned or a housing project near an existing railroad is proposed, an estimate of the relevant noise levels is usually required. For this, it is necessary to quantify those parameters that affect the railroad noise. This paper deals with an estimation of high speed railroad noise on conventional line.

  • PDF

레이스트랙형 초전도계자코일의 AE 신호 특성평가 (Investigation of Acoustic Emission Signals in Racetrack Superconducting Field Winding Coils)

  • 손명환;백승규;고락길;이언용;배준한;권영길;류강식
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1998년도 하계학술대회 논문집 A
    • /
    • pp.186-188
    • /
    • 1998
  • Acoustic emission monitoring on two racetrack superconducting field winding coil was performed during excitation and quenches to diagnose the integrity of the field winding coils. Two field windings were not impregnated with epoxy The results confirm that the acoustic emission signals are mainly due to conductor motions which cause premature quenching of the winding. The quench current of modified racetrack type field winding coil (Type B) are more higher than that of conventional field winding coil (Type A).

  • PDF

기획특집: 경부고속철도의 성과와 교훈 -시행착오와 혼선$\ldots$ 향후 사업의 소중한 교훈으로- (Experiences & Lessons Learned from Kyeongbu Highspeed Rail Project - Getting beyond Trials & Erros : Valuable Knowledges for Future Project -)

  • 강기동
    • 기술사
    • /
    • 제43권6호
    • /
    • pp.23-26
    • /
    • 2010
  • The first high speed railway in Korea was opened to traffic on April 1, 2004 and the second phase will be opened on November 1. 2010. Many technical problems that occurred during construction have been solved. In its early period of project, difficulties were encountered in design, construction of high speed line. because most of Korean railway engineers were familiar only with conventional railway. Now they understand the various phenomena occuring during operation of the KTX and have accumulated extensive technical knowhow. Valuable experiences and knowledges that have been obtained from frials and errors will lead to further improvement for the future project.

  • PDF