• Title/Summary/Keyword: Conventional project

Search Result 452, Processing Time 0.025 seconds

Effects of Inquiry-oriented Differential Equations Instruction Based on the Realistic Mathematics Education (탐구 지향 미분방정식 교수-학습의 효과 분석)

  • Kwon, Oh-Nam;Ju, Mi-Kyung
    • The Mathematical Education
    • /
    • v.44 no.3 s.110
    • /
    • pp.375-396
    • /
    • 2005
  • This paper reports on the main results of 3 study that compared students' beliefs, skills, and understandings in an innovative approach to differential equations to more conventional approaches. The innovative approach, referred to as the Realistic Mathematics Education Based Differential Equations (IODE) project, capitalizes on advances within the discipline of mathematics and on advances within the discipline of mathematics education, both at the K-12 and tertiary levels. Given the integrated leveraging of developments both within mathematics and mathematics education, the IODE project is paradigmatic of an approach to innovation in undergraduate mathematics, potentially sewing as a model for other undergraduate course reforms. The effect of the IODE projection maintaining desirable mathematical views and in developing students' skills and relational understandings as judged by the three assessment instruments was largely positive. These findings support our conjecture that, when coupled with careful attention to developments within mathematics itself, theoretical advances that initially grew out research in elementary school classrooms can be profitably leveraged and adapted to the university setting. As such, our work in differential equations may serve as a model for others interested in exploring the prospects and possibilities of improving undergraduate mathematics education in ways that connect with innovations at the K-12 level

  • PDF

Development of Wide Area DAS for Distribution Control Center (배전센터용 광역 배전자동화시스템 개발)

  • Shin, Chang-Hoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.9 no.5
    • /
    • pp.1145-1149
    • /
    • 2008
  • This paper presents KEPCO research project for developing wide area DAS by reengineering conventional DAS and its functional upgrade. Through the research project system design requirements were prepared based on the local operation status and oversea examples. Application softwares were also developed supporting integrated operation of several area. The system implementation was performed on Choongnam regional head office for pilot operation. The developed wide area DAS will be fully installed on 41 DCC nation wide and expected to contribute on innovation of our distribution network operation.

A study on Improvement of Automatic Generation Control Related Systems for New Energy Management System (자동발전제어(AGC) 운용기선에 관한 연구)

  • Jeon, D.H.;Choo, J.B.;Yoon, Y.B.;Kim, S.H.;Lee, J.S.;Kim, K.H.;Kweon, S.M.
    • Proceedings of the KIEE Conference
    • /
    • 2000.07a
    • /
    • pp.357-359
    • /
    • 2000
  • This paper is to introduce the R&D project called "Improvement of Automatic Gene-ration Control Related Systems for New Energy Management system". The principal objective of this project is to demonstrate AGC operation capabilities that are suitable to new EMS environment and to show the validity of Set-Point Control Method. A number of developments and enhancements have been made to the generator's Remote Terminal Unit in which new ASTC is being developed and installed. The so-called ACC Signal Transfer Card(ASTC) will include RTU's Set-Point Control capabilities. It is expected that over next few months both RTU & DCS software modifications will be given and a relatively new Set-Point Control Method will be chosen instead of those from more conventional method, pulse control method.

  • PDF

Dynamic Valuation of the G7-HSR350X Using Real Option Model (실물옵션을 활용한 G7 한국형고속전철의 다이나믹 가치평가)

  • Kim, Sung-Min;Kwon, Yong-Jang
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.137-145
    • /
    • 2007
  • In traditional financial theory, the discount cash flow model(DCF or NPV) operates as the basic framework for most analyses. In doing valuation analysis, the conventional view is that the net present value(NPV) of a project is the measure of the present value of expected net cash flows. Thus, investing in a positive(negative) NPV project will increase(decrease) firm value. Recently, this framework has come under some fire for failing to consider the options of the managerial flexibilities. Real option valuation(ROV) considers the managerial flexibility to make ongoing decisions regarding the implementation of investment projects and the deployment of real assets. The appeal of the framework is natural given the high degree of uncertainty that firms face in their technology investment decisions. This paper suggests an algorithm for estimating volatility of logarithmic cash flow returns of real assets based on the Black-Sholes option pricing model, the binomial option pricing model, and the Monte Carlo simulation. This paper uses those models to obtain point estimates of real option value with the G7- HSR350X(high-speed train).

Collaborative Process to Facilitate BIM-based Clash Detection Tasks for Enhancing Constructability

  • Seo, Jung-Ho;Lee, Baek-Rae;Kim, Ju-Hyung;Kim, Jae-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.299-314
    • /
    • 2012
  • One of reasons for introducing Building Information Modeling (BIM) is to support clash detection tasks by means of a 3D product model. In the conventional construction project process, clashes have been found during construction phase. However, it can cause cost overrun and time delay. In order to investigate and correct clash detections at design phase, relevant business process and guide for this task should be provided. This study aims to identify hindrances in clash detection tasks at the design phase and analyze its current process using IDEF0 model. Despite the convenience of IDEF0 as a systems analysis tool, professional participants might have difficulties to understand their own tasks according to business process. For this reason, in this research, Business Process Model and Notation (BPMN) is introduced to provide ideal process and required decision making governance. The provide BPMN model will provide insights for a BIM-based collaborative environment to enhance the constructability through the construction project.

A Revamping of Pickling and Tandem Cold Rolling Mill for Producing Stainless Steel (Stainless 생산을 위한 냉연 합리화)

  • Lee D. H.;Ki E. D.;Cho S. B.;Lee K. B.;Kim D. H.
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2004.08a
    • /
    • pp.109-118
    • /
    • 2004
  • No.2 PCM (Pickling and tandem cold rolling mill) at Pohang works was revamped in 2003. The purpose of this project is to produce carbon and stainless steel using conventional carbon production process, rolling and annealing. This paper introduces the applied facilities and technologies of PCM which are used in production of carbon and stainless steel. To realize the main purpose of this project, POSCO have developed laser weld technology in normal carbon and special steel (stainless, high carbon and high silicon). And this report describes the method which is developed to get down the surface defect of stainless 400 series. After revamping, No.2 PCM can have competitive power in this field and can supply the special steel using carbon rolling process.

  • PDF

Strain Improvement Based on Ion Beam-Induced Mutagenesis (이온빔을 이용한 미생물의 균주 개량)

  • Jeong, Hae-Young;Kim, Kye-Ryung
    • Microbiology and Biotechnology Letters
    • /
    • v.38 no.3
    • /
    • pp.235-243
    • /
    • 2010
  • For decades, traditional mutation breeding technologies using spontaneous mutation, chemicals, or conventional radiation sources have contributed greatly to the improvement of crops and microorganisms of agricultural and industrial importance. However, new mutagens that can generate more diverse mutation spectra with minimal damage to the original organism are always in need. In this regard, ion beam irradiation, including proton-, helium-, and heavier-charged particle irradiation, is considered to be superior to traditional radiation mutagenesis. In particular, it has been suggested that ion beams predominantly produce strand breaks that often lead to mutations, which is not a situation frequently observed in mutagenesis induced by gamma-ray exposure. In this review, we briefly describe the general principles and history of particle accelerators, and then introduce their successful application in ion beam technology for the improvement of crops and microbes. In particular, a 100-MeV proton beam accelerator currently under construction by the Proton Engineering Frontier Project (PEFP) is discussed. The PEFP accelerator will hopefully prompt the utilization of ion beam technology for strain improvement, as well as for use in nuclear physics, medical science, biology, space technology, radiation technology and basic sciences.

Coupled thermal and structural analysis of roller compacted concrete arch dam by three-dimensional finite element method

  • Bayagoob, Khaled H.;Noorzaei, Jamaloddin;Abdulrazeg, Aeid A.;Al-Karni, Awad A.;Jaafar, Mohd Saleh
    • Structural Engineering and Mechanics
    • /
    • v.36 no.4
    • /
    • pp.401-419
    • /
    • 2010
  • This paper focuses on the development, verification and application of a three-dimensional nite element code for coupled thermal and structural analysis of roller compacted concrete arch dams. The Ostour Arch dam located on Ghezel-Ozan River, Iran, which was originally designed as conventional concrete arch dam, has been taken for the purpose of verication of the nite element code. In this project, RCC technology has been ascertained as an alternative method to reduce the cost of the project and make it competitive. The thermal analysis has been carried out taking into account the simulation of the sequence of construction, environmental temperature changes, and the wind speed. In addition, the variation of elastic modulus with time has been considered in this investigation using Concard's model. An attempt was made to compare the stresses developed in the dam body five years after the completion of the dam with those of end of the construction. It was seen that there is an increase in the tensile stresses after five years over stresses obtained immediately at the end of construction by 61.3%.

ASTROMETRIC OBSERVATION OF MIRA VARIABLES WITH VERA

  • NAKAGAWA, AKIHARU;OMODAKA, TOSHIHIRO;HANDA, TOSHIHIRO;KAMEZAKI, TATSUYA;PROJECT, VERA
    • Publications of The Korean Astronomical Society
    • /
    • v.30 no.2
    • /
    • pp.189-191
    • /
    • 2015
  • The calibration of the period luminosity relation (PLR) for Galactic Mira variables is one of the principle aims of the VERA project. We observe $H_2O$ maser emission at 22 GHz associated with Mira variables in order to determine their distances based on annual parallaxes. We conduct multi-epoch VLBI observations over 1-2 years with a typical interval of one month using VERA in order to obtain annual parallaxes with an accuracy of better than than 10%. Recently, the annnual parallax of T Lep was determined to be $3.06{\pm}0.04$ mas corresponding to a distance of $327{\pm}4pc$ (Nakagawa et al., 2014). The circumstellar distribution and kinematics of $H_2O$ masers was also revealed. With accurate distances to the sources, calibrations of K-band absolute magnitudes ($M_K$) can be improved compared to conventional studies. By compiling Mira variables whose distances were determined with astrometric VLBI, we obtained a PLR of $M_K=3.51logP+1.37{\pm}0.07$.

A Comparative Study of Estimation by Analogy using Data Mining Techniques

  • Nagpal, Geeta;Uddin, Moin;Kaur, Arvinder
    • Journal of Information Processing Systems
    • /
    • v.8 no.4
    • /
    • pp.621-652
    • /
    • 2012
  • Software Estimations provide an inclusive set of directives for software project developers, project managers, and the management in order to produce more realistic estimates based on deficient, uncertain, and noisy data. A range of estimation models are being explored in the industry, as well as in academia, for research purposes but choosing the best model is quite intricate. Estimation by Analogy (EbA) is a form of case based reasoning, which uses fuzzy logic, grey system theory or machine-learning techniques, etc. for optimization. This research compares the estimation accuracy of some conventional data mining models with a hybrid model. Different data mining models are under consideration, including linear regression models like the ordinary least square and ridge regression, and nonlinear models like neural networks, support vector machines, and multivariate adaptive regression splines, etc. A precise and comprehensible predictive model based on the integration of GRA and regression has been introduced and compared. Empirical results have shown that regression when used with GRA gives outstanding results; indicating that the methodology has great potential and can be used as a candidate approach for software effort estimation.