• 제목/요약/키워드: Control blasting

검색결과 158건 처리시간 0.023초

아프가니스탄 케심-파이자베드간 도로복구사업 해외설계 사례 (Overseas Design Introduction of Road Rehabilitation Project in Keshim~Faizabad, Afghanistan)

  • 정동호;김우선;김기백;정원준;이승우
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2008년도 추계 학술발표회
    • /
    • pp.569-580
    • /
    • 2008
  • If slope height was more than 20 meters, we conducted an analysis of stereographic projection and limit equilibrium at this slope. We proposed reduction of slope face angle and reinforcement of rock bolt depending on analysis. Blasting design : Standard pattern based on result of local test blasting was made for blasting design. Vibration criterion was set for less than 3.0mm/s because of outworn buildings and inhabitants opinions. Production blasting and Controlled blasting has been done as Construction standard pattern. After Vibration Monitoring has been done, so that we can control of complement. "Bidding Document" and AASHTO 2001 "A Policy on Geometric Design of Highways and Streets" were so for design criteria of earthwork but they were different actual design criteria and left something to be desired in Afghanistan. Therefore, although "Bidding Document" and "AASHTO 2001" were basic design criteria, domestic design criteria was reflected in this design criteria for complement by discussion with supervisor. Drainage design : For stability ratio, ditch of arch block and stonework was designed by rainfall data for the 13 years and discussion with supervisor. Pavement was designed as flexible pavement. Because these days in Afghanistan postwar repair works, especially urgent repairing of roads and newly making of roads, are very highly in progress, I think that Afghanistan is the region about which our construction technical experts should have great concerns.

  • PDF

고속철도 안전확보를 위한 노선 인접 광산의 발파패턴 제안 (A Suggestion of Blasting Patterns of a Mine closed to Railway Line for Securing Safety of High Speed Train)

  • 김현기;이성혁;이진욱;최찬용
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제19권5호
    • /
    • pp.1-9
    • /
    • 2015
  • 2015년도 개통을 위하여 호남고속철도 건설사업 건설이 진행되고 있으며, 이 노선은 차세대 고속열차의 HEMU-430X가 세계 최초로 주행하게 된다. 한편, 인근에 위치한 석회석 광산이 지속적인 발파작업을 시행하고 있으며, 더욱이 향후 연결통로 개설을 통하여 이 노선의 하부를 관통할 예정이다. 이 경우에 광산 발파로 인한 고속철도의 안정성과 열차주행으로 인한 광산 안정성 모두 검토되어야 한다. 이를 위하여 광산 발파진동계측을 통하여 진동추정식을 작성하였으며, 광산발파로 인한 철도 안정성을 정량적으로 검토하였다. 특히, 계측결과 분석에 의한 계측관리기준으로 0.5 kine(cm/sec)을 설정하여, 광산 발파진동을 제어하고자 하였으며, 발파진동의 제어를 통하여 고속열차의 안정성을 확보할 수 있는 광산의 발파패턴을 제안하였다. 또한, 고속열차 주행에 따른 진동이 광산에 미치는 영향을 수치해석적으로 검토하여 광산의 안정성도 확보할 수 있도록 하였다.

터널굴착에서 다단식 발파기에 의한 전단면 발파의 적용성 연구 (Application of Full-Face Round by Sequential Blasting Machine in Tunnel Excavation)

  • 조영동;이상은;임한욱
    • 터널과지하공간
    • /
    • 제4권2호
    • /
    • pp.132-143
    • /
    • 1994
  • Many methods and techniques to reduce ground vibrations are well known. Some of them are to adopt electric millisecond detonators with a sequential blasting machine or an initiating system with an adequate number of delay intervals. The types of electric detonators manufactured in korea include instantaneous, decisecond and millisecond delays but numbers of delay intervals are only limited from No.1 to No.20 respectively. It is not sufficient to control accurately millisecond time with these detonators in tunnel excavation. Sequential fire time refers to adding an external time delay to a detonators norminal firing time to obtain sequential initiation and it is determined by sequential timer setting. To reduce the vibration level, sequential blasting machine(S.B.M) with decisecond detonators was adopted. A total of 134 blasts was recorede at various sites. Blast-to-structure distances ranged from 20.3 to 42.0 meter, where charge weight varied from 0.24 to 0.75 kg per delay. The results can be summarized as follow: 1. The effects of sequential blasting machine on the vibration level are discussed. The vibration level by S.B.M are decreased approximately 14.38~18.05% compare to level of conventional blasting and cycle time per round can be saved. 2. The empirical equations of particle velocity were obtained in S.B.M and conventional blasting. V=K(D/W1/3)-n, where the values for n and k are estimated to be 1.665 to 1.710 and 93.59 to 137 respectively. 3. The growth of cracks due to vibrations are found but the level fall to within allowable value.

  • PDF

발파시 터널 숏크리트의 최대입자속도와 부착상태평가 분석 (Analysis of the peak particle velocity and the bonding state of shotcrete induced by the tunnel blasting)

  • 홍의준;장석부;송기일;조계춘
    • 한국터널지하공간학회 논문집
    • /
    • 제12권3호
    • /
    • pp.247-255
    • /
    • 2010
  • 숏크리트의 부착강도는 천정부의 낙반방지와 발파진동에 의한 숏크리트 탈락방지에 중요한 역할을 하는 요소이다. 따라서, 숏크리트의 부착상태평가는 품질관리의 주요 요소가 될 수 있다. 본 연구는 터널 내 발파에 의하여 숏크리트에 미치는 최대 입자속도를 예측하고, 발파 진동에 의한 숏크리트의 부착상태를 평가하기 위하여 수행되었다. 이를 위하여 현재 시공중인 터널현장에서 피난연락갱의 발파시 본선부 및 서비스 터널의 발파진동을 측정하였으며 충격반향시험을 수행하여 숏크리트-암반의 부착상태를 평가하였다. 충격반향시험 신호분석을 위하여 시간-주파수 영역 해석 기법을 도입하였으며 평가결과, 국내에서 일반적으로 시행되는 발파조건에서는 숏크리트와 암반의 부착력 손실(들뜸 현상)은 거의 발견되지 않았으며, 숏크리트 부착력 손상 가능성은 낮은 것으로 판단되었다.

터널발파시 천공상태 평가를 통한 여굴 저감방안 연구 (A Study on Overbreak Control Methods by Evaluating Drilling Conditions in Tunnel Blasting)

  • 김양균;김인호;유정훈;김성민
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2005년도 지반공학 공동 학술발표회
    • /
    • pp.198-209
    • /
    • 2005
  • Overbreak or underbreak is one of the most important factors in evaluation the results of a tunnel blasting. Overbreak, which depends on the quality of rock, the type and quantity of explosives, and the method and condition of drilling, has been a target of challenge to many blasting engineers as it is connected with economic directly. Drilling is generally known as a primary one of overbreak producing factors. So, This study presented the practical solution to reduce overbreak, which was caused by drilling, through the analyses of how to make a drilling process accurate and how to evaluate the effect of each drilling method. Thus, this solution would give a quantitative analysis of overbreak and provide the information of how to reduce the quantity of overbreak. Moreover, for verifying this solution, we applied it to a tunnel project and then have found out that the quantity of overbreak decreased to approximately 10-40% compared with the previous way of overbreak control.

  • PDF

노치 발파공에 의한 파단면 제어 효과에 관한 연구 (Assessment of Notch Effect on Fracture Plane Control)

  • 김광염;김동규;정동호;조상호
    • 화약ㆍ발파
    • /
    • 제26권1호
    • /
    • pp.57-66
    • /
    • 2008
  • 발파에서 특정한 방향으로 균열 성장을 제어하는데 장약공 노치가 유효하다는 연구결과가 발표되어오고 있다. 본 연구에서는 장약공의 노치가 파단면 형성에 미치는 영향을 살펴보기 위하여 일반 장약공과 노치 장약공에 의한 파단면의 표면을 비교하였다. 암석시편에 노치를 형성하기 위하여 노치비트시스템이 적용되었다. 파단면의 표면은 디지털 영상 계측법을 적용하여 DEM 모델로 재구성하고, 표면 거칠기 지수를 사용하여 파단면의 거칠기를 평가하였다.

발파에 의한 터널확대 굴착 시 교통처리를 위한 교통량 분석 (Analysis of traffic volume for control during an existing tunnel enlargement)

  • 김웅구;백기현;서경원
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.1328-1332
    • /
    • 2010
  • The enlargement of existing tunnels is required to cope with problems related to traffic congestion. Sometimes, the tunnel traffic must be maintained through existing tunnels during their reconstruction due to non-availability of detours. And excavation by drill and blasting is desired for widening a hard rock tunnel. In this case, the road must be closed for some period for blasting through analyzing of traffic volume. In this paper, a case study on some traffic countermeasures for tunnel enlargement by blasting was performed. And the traffic flow characteristics of some tunnels in domestic main city were analyzed.

  • PDF

노천발파에서 비전기식뇌관의 시간차가 진동의 크기에 미치는 영향 (The effect of delay time of nonelectric detonator on the level of vibration in surface blasting)

  • 강추원
    • 터널과지하공간
    • /
    • 제6권3호
    • /
    • pp.267-273
    • /
    • 1996
  • The types of eletric detonators manufactured in korea include instantaneous, decisecond and millisecond delays but number of delay intervals are only limited from No. 1 to No. 20 respectively. It is not sufficient to control accurately millisecond time with these detonators in large surface blasting. But nonelectric system detonators with an unlimited delay time are recently obtained. In this paper the effect of delay time of nonelectric detonator on the level of vibration in surface blasting was studied. A total of 169 data were recorded in the studied area. Blast point-to-measuring point distances ranged from 25 to 100 meter, where charge weight was 1.26 kg per delay.

  • PDF

일반발파와 진동제어발파에 대한 연구 (A Study on the General Blasting and the Vibration Control Blasting)

  • 김일중;기경철;원연호
    • 화약ㆍ발파
    • /
    • 제20권2호
    • /
    • pp.33-41
    • /
    • 2002
  • 화약류를 사용하여 암반을 절취하는 작업현장에서의 발파공해는 항상 발생하고 있다. 특히 폭약의 폭발로 인해 발생하는 지반진동은 크고 작은 문제를 야기하고 있다. 일반적으로 발파현장에서 사용하고 있는 일반발파와 진동제어(미진동)발파에 대한 의미와 구분 및 시공에 대해 인식시키고자 그동안의 경험과 이론을 토대로 하여 연구하게 되었다. 본 연구에서는 일반발파와 진동제어발파를 구분하는 요소로 암분류 및 진동속도를 지발당장약량과 관계, 암분류에 따른 비장약량 및 발파공당 암절취량 그리고 천공경을 선정하여 고찰하였다. 이들 요소를 기준으로 일반발파와 진동제어발파의 경계가 되는 보안물건으로부터 거리 산출방법에 대해서 연구하였다. 일반발파나 진동제어발파 모두 보안물건에는 한계 진동속도 이내의 진동이 전달되어야 하며, 그 경계가 되는 발파공당 절취암량은 연암의 경우 약$16.67m^3$, 보통암의 경우 약$12.5m^3$, 경암의 경우 약 $10m^3$을 기준으로 하는 것이 바람직하고, 그 경계가 되는 보안물건으로부터 거리는 일정하게 정해진 것이 아니므로 현장에서 대상암반에 대해 시험발파를 실시하여 암분류, 비장약량, 지발당장약량, 한계 진동속도를 기준으로 결정하는 것이 바람직하다. 진동제어(미진동)발파구간내에서 발파설계단가는 일률적이 아닌 약2~3구간으로 분할하여 산출해야한다.

최외곽공 주변암반의 발파굴착 손상영역 저감에 관한 수치해석적 연구 (Numerical Study on the Reduction of Blast-induced Damage Zone)

  • 박세웅;오세욱;민경조;;조상호
    • 화약ㆍ발파
    • /
    • 제37권3호
    • /
    • pp.25-33
    • /
    • 2019
  • 지하광산의 갱내 굴착 과정에서 폭약을 사용하여 발파하는 경우, 최외곽공의 폭력을 조절하여 외부 암반의 손상도 감소와 원활한 파단면을 형성하는 작업은 종업자의 안전 및 작업능률을 향상시키는 결과를 가져올 수 있다. 본 연구는 2차원의 동적파괴과정해석기법인 DFPA-2D 코드를 사용하여 단일 장약공에서 발파 시, 장약공의 직경과 디커플링 지수에 따라 생성되는 균열손상범위를 수치해석적으로 확인하였고 Sweden의 발파손상영역 경험식을 이용하여 암반손상범위를 예측하고 DFPA 해석결과와 비교하였다. 추가로 DFPA코드를 지하채광발파의 최외곽공 발파균열예측에 적용하여 파단면형성 및 발파손상발생 메커니즘에 대하여 검토하였다.