• Title/Summary/Keyword: Contract Performance

Search Result 469, Processing Time 0.023 seconds

A Basic Study on the Methodology to Introduce Warranty Contracting for Pavements in Korea (도로포장 성능보증(Warranty) 계약제도 도입방안에 관한 기초연구)

  • Kim, Tae-Song;Seo, Yong-Chil;Lee, Sang-Beom;Koo, Jai-Dong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.4
    • /
    • pp.66-74
    • /
    • 2008
  • Warranty contracting for pavements construction has been widely used in Europeans countries, Japan, and the U.S. and the benefits of warranty contract has been proven. This research investigated the European, U.S., and Japanese warranty contract policies and compared pros and cons. The most appropriate warranty contract policy solution is developed to fit in the Korean construction industry culture. Three main conclusions have been developed in this study: (1) performance specifications should be developed; (2) the systematic method is required to estimate the appropriate costs of performance bond and warranty period, etc.; and (3) short and long term plans for adopting performance warranty contract in Korea are suggested.

The Effect of Consultant Competency on Consulting Performance, Customer Satisfaction, and Intention to Renew Contract: Focused on CSV Consulting in the GMP Industry (컨설턴트 역량이 컨설팅 성과, 고객만족, 재계약 의도에 미치는 영향에 대한 연구: GMP 산업의 CSV 컨설팅을 중심으로)

  • Dae-Hyun Park;Dong-Hyun Baek
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.4
    • /
    • pp.74-92
    • /
    • 2023
  • The computer system validation consulting industry is growing as domestic GMP companies' overseas exports or advancements increase, and computer system validation has been mandatory in Korea since the 2010s, but domestic CSV consulting companies are small in size and have a short history, revealing many shortcomings in terms of service quality and customer satisfaction when conducting consulting. Research related to consulting has been mainly focused on management consulting and IT consulting, and research related to computer system validation is very insufficient. This study confirmed the effect of consultant competency and service quality on consulting performance, customer satisfaction, and intention to renew contract when performing computer system validation through empirical research on food, pharmaceutical, cosmetics, and medical device companies, which are representative companies in the GMP industry. As a result, it was confirmed that consultant competency and service quality had a significant effect on consulting performance, customer satisfaction, and intention to renew contract. In addition, it was confirmed that the reputation and expertise of consulting companies had a moderating effect on the relationship between consultant competency and consulting performance.

A Study on the Remedial Cases of Anticipatory Breach in int'l Sales (국제물품매매에서 이행기전 계약위반에 대한 구제권 연구(사례를 중심으로))

  • Ha, Kang-Hun
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.39
    • /
    • pp.3-26
    • /
    • 2008
  • CISG provides the Convention's default provisions on anticipatory breach. Article 71 permits the aggrieved party to suspend the performance of his obligations if it becomes apparent that the other party will not perform a substantial part of his obligations after the conclusion of the contract. The aggrieved party must give notice of the suspension to the other party and if he provides adequate assurance of his performance, the party must continue with performance. Article 72 authorizes the aggrieved party to avoid the contract to the date of performance when it is clear that the other party will commit a fundamental breach. The aggrieved party is also required to give the other party notice of his intent to avoid the contract if time allows. The requirements for avoidance under Article 72 are more stringent than those for suspension under Article 71. Article 72 requires reasonable prior notice only if time allows, while article 71 requires immediate notice with no exceptions.

  • PDF

Cost Minimization of Solidity Smart Contracts on Blockchain Systems

  • Lee, Wan Yeon
    • International journal of advanced smart convergence
    • /
    • v.9 no.2
    • /
    • pp.157-163
    • /
    • 2020
  • Recently the blockchain technology has been actively studied due to its great potentiality. The smart contract is a key mechanism of the blockchain system. Due to the short history of the smart contract, many issues have not been solved yet. One main issue is vulnerability and another main issue is cost optimization. While the vulnerability of smart contract has been actively studied, the cost optimization has been rarely studied. In this paper, we propose two cost optimization methods for smart contracts running on the blockchain system. Triggering a function in a smart contract program code may require costs and it is repeated continuously. So the minimization of costs required to trigger a function of smart contract while maintaining the performance equally is very important. The proposed two methods minimize the usage of expensive permanent variables deployed on the blockchain system. We apply the proposed two methods to three prevalent blockchain platforms: Ethereum, Klaytn and Tron. Evaluation experiments verify that the proposed scheme significantly reduces the costs of functions in the smart contract written with Solidity.

A Canonical Correlation Analysis of the Relationship between Menu Management Variables and Performance in Contract-Foodservice Operations (위탁 급식 점포의 메뉴 운영 요인과 성과의 연관성에 관한 연구)

  • Park, Ju-Yeon;Kim, Tae-Hee
    • Journal of the East Asian Society of Dietary Life
    • /
    • v.18 no.6
    • /
    • pp.1089-1098
    • /
    • 2008
  • The principal objective of this study was to reveal the relationship between the menu management indicators and menu performance indicators in contract-foodservice operations. Menu indicators differed according to the type of business, type of contract, type of serving, and number of service lines. In accordance with the results of our correlation analysis, we noted significant correlations between menu performance indicators and menu management indicators. The first of these was the correlation between the food cost ration and meal counts, food loss, and the use of prepared vegetables. The second of these was the correlation between food cost per meal and forecasting error, food loss, and inventory turnover. The last of these correlations was the negative correlation between menu CSI(customer satisfaction index) and the use of prepared vegetables. According to the results of our canonical correlation analysis, 2 significant functions were identified. In the first function, we noted significant correlations between meal counts, use of prepared vegetables, food loss, and food cost ratio. Additionally, we noted significant correlations between forecasting error, inventory turnover, food loss, and food cost per meal in the second function. Menu management indicators had no influence on customer satisfaction.

  • PDF

A Study on Foreign Arbitral Awards related to Seller's Notice Fixing Additional Final Period for Performance and Right to Avoid the Contract under the CISG (CISG상 매도인의 부가기간지정권과 계약해제권에 관한 외국중재판정사례 연구)

  • Yi, Ki-Sub;Ahn, Keon-Hyung
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.42
    • /
    • pp.163-186
    • /
    • 2009
  • On April 11, 1980, the "United Nations on Contracts for the International Sale of Goods" ("CISG") was prepared by the United Nations Commission on International Trade Law (UNCITRAL) and approved by a diplomatic conference in Vienna providing uniform law for international sales of goods. It took effect as of March 1, 2005, in Korea. It is set forth on the seller's remedies for breach by the buyer Section III (Art. 61 - 65) under the CISG. In this study, the focus is only on the seller's notice fixing additional final period for performance (Art. 63) and the right to avoid the contract (Art. 64), with examination on some relevant foreign arbitral awards rendered by the ICC and the CIETAC together. Article 63 provides that the seller may fix an additional period of time for reasonable length for performance by the buyer of his obligation. It was found from the above arbitral awards that the concept of 'reasonable length' should be decided on a case-by-case basis, given the specific circumstances in the case [Art. 63(1)]. It is provided that unless the seller has received a notice that he will not perform within the period so fixed, the seller may not, during that period, resort to any remedy for breach of contract in accordance with Article 63(2). Article 64(1) provides the means and grounds for avoidance of the contract, which can be avoided 1) when the breach of the buyer amounts to a fundamental breach of contract, or 2) when the additional period of time is fixed by the seller, unless the buyer declares that he will not perform so within the period of fixed time. As we examined in the above arbitral awards, it was held that the contract is avoided when the seller sends the final notice stating that he will avoid the contract, after the expiration of the additional period of time fixed by the seller in the ICC award. On the contrary, it was held that the contract should be deemed to be avoided exactly when the expiration of additional period noted in the avoidance notice is elapsed in the CIETAC award. Article 64(2) sets time limits for avoidance.

  • PDF

Legal Issues in Specific Performance under International Business Transactions: The scope and application of Article 28 of the CISG (국제물품매매계약상 특정이행에 관한 법적 쟁점 - CISG 제28조의 해석과 적용을 중심으로 -)

  • KIM, Young-Ju
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.71
    • /
    • pp.1-36
    • /
    • 2016
  • Unlike continental European legal systems (civil law systems), specific performance in common law refers to an equitable remedy requiring exactly the performance that was specified in a contract. It usually granted only when money damages would be an inadequate remedy and the subject matter of the contract is unique. Thus, under common law specific performance was not a remedy, with the rights of a litigant being limited to the collection of damages. Consistent with the practice in civil law jurisdictions, United Nations Convention on Contracts for the International Sale of Goods (CISG) makes specific performance the normal remedy for breach of a contract for the sale of goods. Therefore, the buyer may require a breaching seller to deliver substitute goods or to make any reasonable repair. Likewise, the sellermay require the buyer to taker delivery of goods and pay for them. Despite this, Article 28 of the CISG restricts the availability of specific performance where it would be unavailable under the domestic law of the jurisdiction in which the court is located. Thus, the CISG's more liberal policy toward specific performance is restricted by common law. There are some legal issues in CISG's specific performance availability by Article 28. This paper analyzes these issues as interpreting Article 28 of CISG, by examining various theories of application to actions for specific performance and comparing CLOUT cases involving CISG Article 28.

  • PDF

Product Liability in the Shipbuilding in the "MSC Carla" case (MSC Carla 사례상 선박의 제조물책임)

  • Seo, Jeong Woo;Jo, Jong Joo
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.64
    • /
    • pp.155-185
    • /
    • 2014
  • Liability for the manufacture or supply of defective products can arise in two principle ways, in tort and in contract. English law has long regarded shipbuilding contract as agreement for the sale and purchase of goods. The consequence of which is that unless the Buyer and Builder agree otherwise, terms will automatically be implied into the contract between them as to the quality and performance of the completed vessel. The same principle applies to sub-contracts allied to the shipbuilding contract. On the other hand, one case decisions established that ".... a contract to build a ship, though a contract of sale of goods, has also some characteristics of a building contract", Recently the liability of a manufacturer in tort for physical damage i.e. personal injury and damage to property other than alleged to be defective is now well settled in most countries. Accordingly the Builder may face third party claims in tort more regularly than they have in the past, if the statutory implied terms have not been expressly excluded in contract. In such circumstances, it is necessary for the Builder to be prepared with counter measures to secure the stability of the vessel from its design development, building process, delivery and operation etc. The purpose of this paper is, from the case of "MSC Carla", to review product liability, jurisdiction and the initial date of extinctive prescription, then to suggest counter measures to the Builder.

  • PDF

Force Majeure and Hardship - Focusing on the UNIDROIT Principles of International Commercial Contracts - (불가항력과 Hardship에 관한 연구 - 국제상사계약에 관한 UNIDROIT원칙을 중심으로 -)

  • Heo, Kwang-Uk
    • Journal of Korea Port Economic Association
    • /
    • v.21 no.3
    • /
    • pp.219-238
    • /
    • 2005
  • The purpose of this study is to analyze the concept, requirement and the effect of Force majeure and Hardship under the UNIDROIT Principles of International Commercial Contract. Under the UNIDROIT Principles Non-performance by a party is excused if that party proves that the non-performance was due to an impediment beyond its control and that it could not reasonably be expected to have taken the impediment into account at the time of the conclusion of the contract or to have avoided or overcome it or its consequence. There is hardship where the occurrence of events fundamentally alters the equilibrium of the contracts and the events occur or become known to the disadvantaged party after the conclusion of the contract; the events could not reasonably have been taken ito account by the disadvantaged party at the time of the conclusion of the contract; the events are beyond the control of the disadvantaged party; and the risk of the events was not assumed by the disadvantaged party.

  • PDF

A Study on Cost Analyses and an Efficient Financial Management in Self-Operated and Contract-Managed Secondary School Foodservices (중.고등학교 급식비용 분석과 효율적 재무관리체계를 위한 연구)

  • 곽동경;장혜자;이나영
    • Journal of Nutrition and Health
    • /
    • v.36 no.10
    • /
    • pp.1083-1093
    • /
    • 2003
  • Efficient financial management is a critical factor in achieving school foodservice goals. The objective of this study was to suggest efficient financial management practices in secondary school foodservices. In pursuit of this objective, we first identified performance indexes for measuring the success of financial management. Second, we suggested financial management standards, financial data classification methods and a report system. Last, we analyzed operating ratios with the financial data of self-operated and contract-managed school food services. The data were collected through an open-ended questionnaire from 10 middle/high school foodservices in Seoul and Kyeonggi Provincial during on-sites visits and interviews with dieticians and managers. Student participation, sales goals, re-contract frequency and number and cost of disaster loss were identified as the performance indexes for financial management. Income statements were compiled by identifying and classifying financial data. Total revenues consisted of subsidies, meal sales, other revenue and interest. Expenditures consisted of purchased food, salaries and wages, utility costs, office supplies, kitchen supplies, purchased services, company overhead indirect costs, facility investment and maintenance, facility usage expenses, employee benefits and miscellaneous. Mean price of a meal was 2,326 won at self-operated foodservices when the subsidies were included as revenues and 2,360 won at contract-managed foodservices. When including the subsidies as revenues, the operating ratios of self-operated foodservice showed that the food cost percentage was 66.9%, labor cost 23.2%, operation cost 9.9% and profit 0%. The correspond figures at contract-managed foodservices were 57.6%, 21.5%, 15.3%, and 5.5%, respectively. Food costs in self-operated foodservices was significantly higher than that for contract-managed foodservices, however, facility investment and maintenance and facility usage expenses at self-operated foodservices was significantly lower than those for contract-managed foodservices. Based on this study, the methodology and classification system of financial data was found to be applicable to assess the financial structure of school foodservices.