• Title/Summary/Keyword: Contract Condition

Search Result 143, Processing Time 0.024 seconds

Legal Relations of the Contract of International Carriage of Goods by Air (국제항공화물운송계약(國際航空貨物運送契約)의 법률관계(法律關係) -화주(貨主)의 권리의무(權利義務)를 중심(中心)으로-)

  • Lee, Kang-Bin
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.1
    • /
    • pp.193-222
    • /
    • 1989
  • The purpose of this study is to review the rights and duties of cargo owners, the party to the contract of international carriage of goods by air under the Warsaw Convention System and the IATA conditions. It is generally known that air freight is the most-cost mode of transportation. However, should there be considerations of total distribution cost, the use of air freight leads exporters to be advantageous in physical distribution. The Warsaw Convention System defined and limited the rights and duties of cargo owners and air carriers paticipating in the international carriage of goods, but it does not regulate every aspect of air transportation. Therefore, the unregulated parts are governed by national laws and by individual contracts of carriage. The International Air Transport Association(lATA), a worldwide organization of airlines, has formulated model conditions of contract for the carriage of cargo. These models are not uniformly followed but they serve as a basis for many of the individual standard form of contracts prepared by air carriers. The contract of air carriage of goods is a contract of adhesion, 'the consignor recognizing and accepting the conditions laid down by the carrier'. There are consignors and carriers as the parties to the contract of international carriage of goods. In addition to his basic right, implied in Warsaw Convention Article 18 and 19, to require devery of the goods in good condition and at the date agreed upon, the consignor has the right to dispose the goods in the course of the journey up to the moment when the consignee is entitled to require delivery. If it is impossible to carry out the orders of the consignor, the carrier must so inform him forthwith. The right conferred on the consignor ceases at the moment when that of the consignee begins in accordance with Warsaw Convention Article 13. Nevertheless, if the consignee declines to accept the air waybill or the goods, or if he cannot be communicated with, the consignor resumes his right of disposition. Unless it is otherwise agreed, it is the duty of the carrier to give notice to the consignee as soon as the goods arrive. The consignee is entitled, on arrival of the goods at the place of destination, to require the carrier to hand over to him the air waybill and to deliver the goods to him, on payment of the charges due and on complying with the conditions of carriage set out in the air waybill. The air waybill is supposed to be made out by the consignor. If the carrier makes it out, he is deemed, subject to proof to the contrary, to have done so on behalf of the consignor, whether there is one air waybill or several, each must be made out in three original parts. The first is for the carrier, the second is for the consignee, and the the third is handed to the consignor when the shipment has been accepted. The consignor is responsible for the correctness of the particulars and statement concerning the cargo appearing in the air waybill. Each of the original parts of the air waybill has evidential value and possession of his part is a condition for the exercise by the consignor or consignee of his rights under the contract of carriage. Hague Protocol set forth in Article 9 that nothing in this. Convention prevents the issue of a negotiable air waybill, but Montreal Additional Protocol No. 4 deleted this article. All charges applicable to a shipment are payable in cash at the time of acceptance thereof by the carrier in case of a prepaid shipment or at the time of delivery thereof by the carrier in case of a collect shipment. The carrier shall have lien the cargo for unpaid charges and, in the event of non-payment thereof, shall have the right to dispose of the cargo at public or private sale and pay itself out of the proceeds of such sale any and all such amounts. In conclusion, the Warsaw Convention System has the character of ambiguity in various respects, not only in the part of the forms of documents but also in conditions of contract. Accordingly, the following propositions might be considered: (1) If the carrier does not obey the orders of the consignor for the disposition of the goods without proper reasons, he will be liable strictly for any damage which may be caused thereby to the cargo owner. The special agreement and carrier's conditions of carriage which limit unreasonably the consignor's right of disposition of the goods will be nullified. (2) The instrument of the Warsaw Convention System which is not yet in force(Montreal Additional Protocol No. 4) would considerably simplfy the processing and keeping of computerized records of the carriage. Until this instrument enters into force, the airlines will be faced with practical problems preventing them to substitute computerized data processing techniques for the formal issuance of the documents. Accordingly, Montreal Additional Protocol No. 4 should become effective as soon as posisble. From a practical point of view in the international trade, the issuance of negotiable air waybill should be permitted for the security of the bank.

  • PDF

Improvement on the Managerial Method of Price Fluctuation System (물가변동제도 운영방식 개선방안)

  • Lee, Jae-Seob;Shin, Young-Chul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.3-11
    • /
    • 2011
  • There are several causes to recalculate the contract amount in public construction projects. Among them, the escalation clause was introduced in 1969 and now the condition to recalculate the cost is effective after 90 days from the date of contract and the rate of fluctuation should be more than 3% from the date of bidding. The two calculation methods for the rate of fluctuation are item-adjustment and index-adjustment. According to the results of investigation into 4 public institutions and 163 projects, all of them have used the method of index-adjustment and the rate of projects that spend over 6 months obtaining the approval of contract amount adjustment is more than 90%. The reason for spending lots of time is caused by problems of the calculation method on the price fluctuation rate. Therefore, it is necessary that the calculation method should be diversified to cope with the problems and a option of the builder should be expanded as well. Furthermore, if the way to apply correction factors to construction price index and average index based on the producer and consumer price index made by the bank of Korea is added, then the duration will be reduced without additional expenses. This study proposed the diversification of the calculation method using price fluctuation rate and builders' expanded options as improvement on the managerial method of Price Fluctuation System for the prompt and efficient contract amount adjustment.

A study on Problems of Charterparty for Tug & barge Ship which Employed in Marine Construction and its Systematic Improvement Plan (해상공사에 투입된 예·부선 용선계약의 문제점과 개선방안에 관한 연구)

  • Jang, Yeong-Jun
    • Journal of Navigation and Port Research
    • /
    • v.38 no.5
    • /
    • pp.471-477
    • /
    • 2014
  • In general, a regular charterparty form is used as a charterparty for tugboats which are employed in marine construction and a bareboat charter form is generally used for barge boat charterparty. As the tug-barge charterparty which are currently used do not have a standardised form, contracting parties arbitrarily decide on the terms and conditions of the contract. As a result, provisions of the charterparty usually do not specify in the contract which party bears the burden of liability in case of accident. Furthermore, the terminologies used in the charterparty are different from legal terms of current commercial law which causes confusion. These problems can be solved mostly by clarifying the legal character of the charterparty between the contracting parties and by conforming the terminologies. In addition, endeavour to standardise the contract form must be carried forward at the same time. This research purports to study actual condition of current charterparty for tug-barge ship which are employed to marine construction and to suggest systematic improvement plan. For this purpose, this research focuses on studying cases in which dispute arose due to lack of clarity in the provisions of the contract with regard to which party bears the burden of liability in case of accident. This research also purports to suggest forming the standardised contract terms of the charterparty as one way of solution and examine matters to be attended in writing a standardised form.

A Study on the Using Situation in Korea and Suggestions for Improvement of INCOTERMS (우리나라 무역업계의 INCOTERMS 사용현황과 개정방향에 관한 고찰)

  • Park, Kwang-So;Kim, Jae-Seong
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.43
    • /
    • pp.53-74
    • /
    • 2009
  • INCOTERMS have been changed almost every 10 years since ICC established INCOTERMS as trade terms for International transaction. Recently transportation has become bigger, and modernized by means of electronic appliances such as RFID, IT, and containerization. FRC, FOR/FOT, FOA were added in INCOTERMS1980 and every conditions are unified into three alphabets in INCOTERMS1990. The best features of INCOTERMS2000 are that FCA substitute FRC, FOR/FOT, FOA and customs formalities were simplified to make clear for each party of contract. It seems that business circles still stick to old customs of their trade like FOB or CIF not only in Korea but in an international practice even though there have been several revisions of INCOTERMS until now. ICC have tried to provide INCOTERMS3000 to solve problems between a theory and an actual condition of international trade. This study has tried to suggest opinions against INCOTERMS3000 and has surveyed a recognition, an actual using situation and issues of INCOTERMS to get improvements. For a recognition of INCOTERMS has been spread as you can find at tables many kinds of business circles still stick to old customs of their trade terms FOB and CIF. Now there are two alternative plans. Firstly, we need to suggest improvements against inconsistency of INCOTERMS to be applied on newly revised INCOTERMS3000 and educating business circles to use proper conditions of INCOTERMS for their doing business. Secondly, we shall participate in revising INCOTERMS to activate multimodal transport conditions of INCOTERMS and provide solutions to fill gap between a theory and an actual condition of international trade. It seems that terms of multimodal transport such as FCA, CPT, or CIP can be a perfect condition for each party of contract. We have examined the inconsistent features of Ship's rail and notions of on board, and observed how to activate multimodal transport terms. These would be hot issues of next revision of INCOTERMS and we provided improvements on each trade terms, THC charges, or others against INCOTERMS.

  • PDF

The Roles of Seeds on Preparation the Silica Glass by Sol-Gel Process (졸-겔법에 의한 실리카 유리의 제조에 있어서 Seed첨가의 역할)

  • 이경희;이병하;오부근;안광훈;김종옥
    • Journal of the Korean Ceramic Society
    • /
    • v.26 no.5
    • /
    • pp.677-681
    • /
    • 1989
  • On the preparation of silica glass by sol-gel process, we used fine powder of silica gel to prevent cracking. In this case, the best condition of silica glass preparation is the contents of 10~40wt% seed and the gelation time of solution in contract. The dried gels conversed to silica glass by heat treatment up to 125$0^{\circ}C$.

  • PDF

A Study on the Efficient Technical Assistance for Small-sized Construction Sites (소규모 건설현장의 효율적인 기술지원 방안 연구)

  • Lee, Gi-Tae
    • Journal of the Korean Society of Safety
    • /
    • v.21 no.5 s.77
    • /
    • pp.72-76
    • /
    • 2006
  • This study deals with problems of technical assistance through accidents analysis and questionnaires on small-sized construction sites which are difficult to understand real condition and administrate legally and indicated following efficient methods of technical assistance. (1) Ensuring access to the small-sized construction sites. (2) Delegation technical assistance service to civilian and supporting selected. (3) Raising of the person's safe consciousness concerned with the small-sized construction sites. (4) Safety consulting for the head office of small-sized construction sites.

A Comparative Study of Sea WaybilI and Electronic B/L in the International Contract of Carriage (국제운송계약상 해상화물운송장과 전자선하증권의 비교연구)

  • Kim, Eun-Joo
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.51
    • /
    • pp.317-358
    • /
    • 2011
  • The purpose of this study aims to analyse the key differences of the sea waybill and electronic B/L in the international transport documents. Sea waybills look remarkably like ordinary bills of lading. Indeed, in two important ways, they are just like bills of lading: the front of the document will near a description of the quantity and apparent condition of the goods; and the back of the document provides evidence of the terms of the contract of carriage. They differ from bills of lading in that, far from indicating that the goods described are deliverable to the order of the shipper or of the consignee, they will make it explicit that the goods are deliverable only to the consignee. Again, different carries will do thai in a variety of ways. For example, the document may call itself non-negotiable, omitting the word order from the consignee box on the front of the document, and stating explicitly that the goods will be deliverable to the consignee or his authorised representative on proper proof of identity and authorisation. The Hague-Visby Rules and Hamburg Rules give no guidance as to any right to instruct the carrier in respect of goods while they are in transit. However, in applying Article 50 of the Rotterdam Rules, in particular when applying it in the context of seawaybills, straight bills of lading or ship's delivery orders, regard would need to be had to preserve the shipper's rights under any of those three documents even after the buyer of goods covered by them has acquired rights of its own. And, the right of control is defined at Article 1.12 of the Rotterdam Rules. The right to give instruction is further limited by the terms of Article 50.1 to three particular types of instruction in respect of the goods, relating broadly to the goods, their delivery en route, and the identity of the consignee. And, the CMI formulated the CMI Uniform Rules for Sea Waybills for voluntary incorporation into any contract of carriage covered by such a document. Recognising that neither the Hague nor the Hague-Visby Rules are applicable to sea waybills, the CMI Rules provide that a contract of carriage covered by a waybill shall be governed by whichever international or national law, if any, would have been compulsorily applicable if the contract had in fact been covered by a bill of lading or similar document of title.

  • PDF

A Study on the Unfair Calling under the Independent Guarantee (독립보증상의 수익자에 의한 부당청구(unfair calling)에 관한 연구)

  • Oh, Won-Suk;Son, Myoung-Ok
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.42
    • /
    • pp.133-160
    • /
    • 2009
  • In International trade the buyer and seller are normally separated from on another not only by distance but also by differences in language and culture. It is rarely possible for the performance of obligations to be simultaneous and the performance of contracts therefore calls for trust in a situation in which the parties are unlikely to feel able to trust each other unless they have a longstanding and successful relationship. Thus the seller under an international contract of sale will not wish to surrender documents of title to goods to the buyer until he has at least an assurance of payment, and no buyer will wish to pay for goods until he has received them. A gap of distrust thus exists which is often bridged by the undertaking of an intermediary known and trusted by both parties who will undertake on his own liability to pay the seller the contract price in return for the documents of title and then pass the documents to the buyer in return for the reimbursement. This is a common explanation of the theory behind the documentary letter of credit in which the undertaking of a bank of international repute serves as a "guarantee" to each party that the other will perform his obligations. The independence principle, also referred to as the "autonomy principle", is at the core of letter of credit or bank guarantee law. This principle provides that the letter of credit or bank guarantee is independent of the underlying contractual commitment - that is, the transaction that the credit is intented to secure - between the applicant and the beneficiary ; the credit is also independent of the relationship between the bank and its customer, the applicant. The most important exception to the independence principle is the doctrine of fraud in the transaction. A strict interpretation of the rule that the guarantee is independent of the underlying transaction would lead to the conclusion that neither fraud nor manifest abuse of rights by the beneficiary would constitute an objection to payment. There is one major problem related to "Independent guarantees", namely abusive or unfair callings. The beneficiary may make an unfair calling under the guarantee. The countermeasure of beneficiary's unfair calling divided three cases. First, advance countermeasure namely by contract. In other words, when the formation of the contract, the parties must insert the Force Majeure Clause, Arbitration Clause to Contract, and clear statement to the condition for demand calling. Second, post countermeasure namely by court. Many countries, including the United States, authorize the courts to grant an order enjoining the issuer from paying or enjoining the beneficiary from receiving payment under the guaranty letter. Third, Export Insurance. For example, the Export Credit Guarantees Department is prepared, subject to certain conditions, to cover the risk of unfair calling. Of course, KEIC in Korea is cover the risk of the all things for guarantees. On international projects, contractor performance is usually guaranteed by either a standby letters of credit or Independent guarantee. These instruments will be care the parties.

  • PDF

The Harmony and Moderation of Between Defect Liability and Default Liability in the Construction Contract (도급계약에서 하자담보책임과 채무불이행책임의 조화와 중용 - 대법원 2020.6.11. 선고 2020다201156판결에 대한 고찰 -)

  • Ahn, Sanghyo;Sin, Manjoong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.2
    • /
    • pp.65-75
    • /
    • 2022
  • On 11 June 2021, the Supreme Court ruled that the judgment of the lower court was justified for the subject case, that the plaintiff could assert the defendant's liability for default due to incomplete performance even though the warranty period for defects which stipulated in the particular condition of the contract has expired. In Korean civil law, the concurrent between the exclusion period for defect warranty and the extinctive prescription for default liability is conceded, since the exclusion period and the extinctive prescription have their respective purposes in law, therefore these two should be judged by harmonizing them based on that they are mutually related. If the subject judgment is generalized, there is no reason to exist for the provisions of defect liability in the construction contract any longer. This study examines the subject judgments through the general theory and precedent case studies on the defect liability and default liability, then derived any problems that may arise if the subject judgment is generalized. In addition, based on a realistic model, it was suggested for a practical improvement method that both the provisions of the warranty period shall be changed realistic and to stipulate the character of its nature as written provisions in the contract.

The problems for the usage and practical application of INCOTERMS 2010 in international trade contracts (국제 물품매매계약에서 INCOTERMS 2010의 사용 현황과 실무적 적용의 문제점)

  • Kim, Hae-suk;Jang, Jae-hun
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.19 no.12
    • /
    • pp.2993-3002
    • /
    • 2015
  • INCOTERMS 2010 apply to the International Trade Contract for the last 5 years. The export trade condition and the document type for last 10 years was researched to analysis of the practical problems of INCOTERMS 2010 application. The result of the research; First, several rules which are against the official INCOTERMS 2010 rules are used. Second, the conventional rules like FAS FOB, CIF and CFR which are used for the ocean and inland transportation are applied without any changes. Third, the issue of the time of delivery(transfer of ownership) at the CPT and CIP affects not to activate these two rules. Fourth, the frequency of the DAT use is low. Because, the terminal designate is hard at the point of the contract and the terminal is changeable during the transport. According to these issues, the active publicity campaign is needed for the INCOTERMS 2010. And, the analysis of the terms and the solution of conflict are also needed.