• Title/Summary/Keyword: Construction work stakeholder

Search Result 19, Processing Time 0.026 seconds

Development of BIM-based bridge maintenance system for cable-stayed bridges

  • Shim, Chang-su;Kang, Hwirang;Dang, Ngoc Son;Lee, Deokkeun
    • Smart Structures and Systems
    • /
    • v.20 no.6
    • /
    • pp.697-708
    • /
    • 2017
  • Maintenance plays a critical role in the bridge industry, but actual practices show many limitations because of traditional, 2D-based information systems. It is necessary to develop a new generation of maintenance information management systems for more reliable decision making in bridge maintenance. Enhancing current work processes requires a BIM-based 3D digital model that can use information from the whole lifecycle of a project (design, construction, operation, and maintenance) through continuous exchanges and updates from each stakeholder. This study describes the development of a data scheme for maintenance of cable-stayed bridges. We implemented the proposed system for a cable-stayed bridge and discussed its effectiveness.

Survey and Analysis of Stakeholder Opinions on the Establishment Procedure of Safety Inspection System for Highway Construction Clients (고속도로 건설공사 발주자의 안전점검 체계구축 절차에 관한 이해관계자 설문조사 및 분석)

  • Eung Ho Park;Su Dong Lee;Kihyo Jung
    • Journal of the Korea Safety Management & Science
    • /
    • v.25 no.4
    • /
    • pp.57-65
    • /
    • 2023
  • The public safety management guidelines were introduced in 2019 and continue to be dedicated to advancing comprehensive measures for public safety management, with a primary focus on prioritizing the safety and well-being of the public within governmental institutions. To achieve this goal, our previous study developed a establishment procedure of risk assessment-based safety inspection system for public institutions that order construction projects and applied it to highway construction projects to evaluate its effectiveness. To enhance the practicality of the establishment procedure, it is essential to collect and analyze feedback from stakeholders regarding its performance and suitability. This study conducted a survey involving 200 participants who had experience with the establishment procedure, and performed statistical analyses to evaluate its performance and applicability. The survey results indicated that the participants reported a high level of satisfaction (scoring 4 and above on a 5-point Likert scale) in several areas: specialization of safety inspection items for different types of work (with a satisfaction rate of 65%), the evaluation process for safety ratings (64.5%), and their willingness to recommend the procedure to other institutions (75.5%). In the factor analysis with Varimax rotation, two factors emerged: (1) a specialization factor related to safety inspection items, and (2) a grading factor associated with safety evaluation results. Regression analyses of these factors unveiled significant positive relationships with improvements in safety and health performance, including the prevention of fatal accidents, heightened safety responsibility, and raised safety inspection standards. The establishment procedure of safety inspection system developed in our previous study can play a crucial role in reducing accidents resulting in fatalities and injuries at construction sites, ultimately contributing to a safer working environment for all involved parties.

A Study on Improvement of Aeronautical Study System for Potential Obstacles in the Vicinity of Aerodromes (공항 주변 잠재적 장애물에 대한 항공학적 검토 제도 개선 연구)

  • Lee, Daekyum;Yun, Seokjae;Park, Bomi;Kim, Jechul;Kim, Jun-Hyuk
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.29 no.4
    • /
    • pp.166-172
    • /
    • 2021
  • Obstacle Limitation Surfaces (OLS) are set to protect a certain amount of airspace to limit objects, such as building, other structures, penetrating OLS for safety and regularity of aircraft operations in the vicinity of aerodromes. However, many civil petitions have been raising for effective utilization of lands and permission of building construction which penetrating OLS. While Republic of Korea are limiting installation of penetrating objects based on the National law of airport facilities, such objects are possibly permitted, only if, the possible risks coming from objects are acceptable or negligible in terms of safety and regularity in aircraft operations through the evaluation process, called as an aeronautical study. However, many countries are currently applying their own criteria, processes resulting in failing secure reliable results in aeronautical study. This research aims to establish the framework on criteria, process, and methodologies how the aeronautical study works including work flows between many stakeholder and responsibilities to be specified in national regulation system.

A Study on the Reinforcement of Disaster Prevention for Construction Stakeholders in Korea (국내 건설공사 이해관계자에 관한 재해예방 강화 연구)

  • Ki-Taek Oh
    • Journal of the Society of Disaster Information
    • /
    • v.20 no.1
    • /
    • pp.192-198
    • /
    • 2024
  • Purpose: In order to establish a safety management system led by an orderer in the construction industry, the orderer should be positioned at the peak of the construction industry safety management system and a system that can effectively support safety supervisors who can assist the orderer's role should be reflected. Method: This study collected and analyzed data on the status of safety management of construction business owners through prior research on safety management of construction business owners and a survey on the actual condition of those involved in the construction business. Results: The top priority is to improve the safety awareness and safety management capabilities of the orderer, and through these efforts, the orderer-led safety management system will be established when a national consensus on the responsibility of the orderer, such as the Serious Accident Punishment Act and the Occupational Safety and Health Act, is formed in the event of an accident such as a serious accident. Conclusion: In order to establish a safety management system led by an orderer in the construction industry, it contributes to disaster prevention by positioning the orderer at the peak of the construction safety management system and reflecting a system that can effectively support safety supervisors who can assist the orderer's role.

Development of Business Model for Partnership Support Management (PSM) in Private Infrastructure Projects (민간투자사업 파트너쉽지원관리(PSM) 업무모델 개발)

  • Jung, Pyung Ki;Baek, Hyeon Gi;Seo, Jong Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.99-109
    • /
    • 2011
  • In order to maintain construction industry and to improve efficiency, the Korean government legislated private investment system. Private sector takes advantages by adopting CM (Construction Management) project system, however, public sector has relatively less capability and experience than private sector. In this paper, PSM (Partnership Support Management) is addressed in order to actively strengthen the project capabilities for public sector. PSM maintains existing CM project system because it is a concept of expended business model of CM. PSM needed to categorize the private participated project into 5 phases; project development phase, project announcement phase, project evaluation phase, project agreement phase and agreement changing phase. PSM business structure and business process considering stakeholder's interrelationship and participation are suggested in this research. Suggested PSM business model may not only increase a comprehensive understanding of government and project capability, but also may reduce work load and responsibilities for project momentum of private participation in infrastructure.

A Study on The Conflict Management for Apartment Reconstruction Project (공동주택 재건축사업의 갈등관리에 관한 연구)

  • Lee, Ro-Na;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.467-470
    • /
    • 2008
  • Apartment Reconstruction project causes lots of conflicts among stakeholders who don't have professional knowledge on a complicated work-flow In case these conflicts occur, the project might not be well by the damage passed to parties, and so the project cost might be increased, the project might be delayed and hazy as well if the conflicts are not resolved quickly. However, the damage would be indirectly and directly brought to the main parties in apartment reconstruction project because the conflicts aren't managed. Thus, an effective conflict assessment should be preceded, and a process and a system for managing the conflicts should be developed to prevent and settle the conflicts. The purpose of this study classifies the conflicts which are occurred on each phase of the project based on principal facts, and presents the process to develop conflict management system through conflict assessment to each stakeholder.

  • PDF

Scoping for Marine Environmental Impact Assessment of Tidal Power Plant Construction (조력에너지 개발사업의 해양환경영향평가 스코핑 방안)

  • Kam, Min-Jae;Kim, Gui-Young;Jeon, Kyeong-Am;Yu, Jun;Lee, Dae-In;Eom, Ki-Hyuk
    • Journal of the Korean Society for Marine Environment & Energy
    • /
    • v.15 no.1
    • /
    • pp.30-37
    • /
    • 2012
  • This paper assessed environmental impact of tidal power plant construction in the western sea of Korea, and diagnosed problems of the related assessment. We also proposed key assessment items (scoping) and system improvement for environmental impact assessment (EIA). The establishment of a broad consensus of the appropriateness and a clear purpose for business is an important aspect of the aptness of using the waters, and the aggressive collecting of opinions of the stakeholder and institutions will have to be fulfilled. In addition, we presented the following scoping plan in order to minimize the negative effects of the marine ecosystem and the conflict between the people who work in the fishing industry which result due to the construction of the tidal power plants. (1) the change in seawater exchange rates and the aspect of erosion/sedimentation which result from the change in the velocity of running fluid, (2) the destruction of spawns/habitats of fish due to the damage of tidal flats, (3) fishery resources, impacts of fishing grounds, and the spread of suspended sediments, etc. will have to be applied to the key assessment items(scoping). In addition, every citizen will have work hard for an establishment of an active plan which achieves the harmony and balance of environmental preservation and for the policy to be applied through changing their consciousness of environmental preservation.

Investigations into a Multipurpose Dam in Tasman District-New Zealand

  • Thomas, Joseph Theodore
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.40-48
    • /
    • 2008
  • The Waimea Basin is located on the northern tip of the South Island of New Zealand. It is a highly productive area with intense water use with multi-stakeholder interest in water. Irrigation from the underground aquifers here makes up the largest portion of used water; however the same aquifers are also the key urban and industrial sources of water. The Waimea/Wairoa Rivers are the main sources of recharge to the underlying aquifers and also feed the costal springs that highly valued by the community and iwi. Due to the location of the main rivers and springs close to the urban centre the water resource system here has high community and aesthetic values. Recent enhanced hydrological modelling work has shown the water resources in this area to be over allocated by 22% for a 1:10 year drought security for maintaining a minimalistic flow of 250 l/s in the lower Waimea River. The current irrigated land area is about 3700 hectares with an additional potential for irrigation of 1500 hectares. Further pressures are also coming on-line with significant population growth in the region. Recent droughts have resulted in significant water use cutbacks and the threat of seawater intrusion in the coastal margins. The Waimea Water Augmentation Committee (WWAC) initiated a three year stage 1 feasibility study in 2004/2005 into the viability of water storage in the upper parts of the catchment for enhancing water availability and its security of supply for consumptive, environmental, community and aesthetic benefits downstream. The project also sought to future proof water supply needs for the Waimea Plains and the surrounding areas for a 50 - 100 year planning horizon. The broad range stage 1 investigation programme has identified the Upper Lee Catchment as being suitable for a storage structure to provide the needs identified and also a possibility for some small scale hydro electricity generation as well. The stage 2 detailed feasibility investigations that are underway now (2007/2008), and to be completed in two years is to provide all details for progressing with the next stage of obtaining necessary permits for construction and commissioning a suitable dam.

  • PDF

Conflict Structure Analysis on the Construction of stork Eco-Village in Yesangun Using Q methodology (Q 방법론을 이용한 예산 황새마을 조성사업의 갈등구조 분석)

  • Lee, Jae-Hyuck;Park, Se-Jin;Jeon, Soo-Hyun;Son, Yong-Hoon
    • Journal of Korean Society of Rural Planning
    • /
    • v.20 no.4
    • /
    • pp.77-87
    • /
    • 2014
  • Ecotourism has the potential to boost the energy of a village as it pays keen attention to the ecosystem and the residents of the village. It is empowered by participation of and cooperation among stakeholders who are closely involved in ecotourism. However, many of them express difficulty in striking a right balance between development and conservation with regard to promoting ecotourism. Against this backdrop, this research paper investigates the structure of conflict that the stakeholders, especially those in Stork Village in Yesan County, South Chungcheong Province of Korea, experience during the process of establishment of government-led ecotourism. In addition, this study examines the problems of government-led ecotourism model and how they can be addressed. To analyze conflict structure, this paper used Q methods and found out that the budget-related stakeholders are largely divided into four groups as who; a) complain about how business profits are distributed; b) secure profits by expanding programs; c) consider human settlement, and; d) broaden people's participation. The biggest contributor to the conflicts is found that compensation was given discriminately to different jurisdictions. The second finding is that residents became less cooperative when the financial compensation did not live up to their expectation. For instance, they would demand the tourism facility physically expanded, repeatedly complain about the process of the work, and even accuse the government of degrading ecosystem. In other words, unless the compromise is reached with the residents regarding financial compensation, it could be difficult to encourage their participation and develop as a program-oriented tour. Lastly, the tour program needs to induce voluntary participation of the residents and deliver proper information on ecosystem and natural resources so as to last as sustainable ecotourism. The success of ecotourism will be subject to the cooperation of stakeholders in a region, conservation of our fragile ecosystem, and realization of sustainable growth through sharing economic benefits. This study looks into the cause of the conflicts of ecotourism sites and their structure. If this paper can bring about cooperation of stakeholders, the management and operation of ecotourism sites would be more sustainable.