• Title/Summary/Keyword: Construction waste

Search Result 1,493, Processing Time 0.026 seconds

A Study on the Utilization of Combustible Construction Waste as Fuel (가연성 건설폐기물의 연료화 활용방안에 관한 연구)

  • Park, Ji-Sun;Lee, Sea-Hyun
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.2
    • /
    • pp.116-123
    • /
    • 2010
  • The current enforcement regulation of "The Act on the Promotion of Construction Waste Recycling" defines disposal method of combustible construction waste without obvious recyclging method of those. This leads most combustible construction waste to incinerate or landfill as mixed construction waste. Therefore, it needs regulations to decrease incineration or landfill and to increase recyling of combustible construction waste. This study analyzed the problems of disposal and management of domestic combustible construction waste. As well as considerated regulations relative to utilization of waste solid fuel. From these results, it suggested utilization plans of combustible construction waste as fuel.

  • PDF

Building waste management plan using BIM and RFID technology (BIM과 RFID 기술을 활용한 건설 폐기물 관리 방안)

  • Duan, Chen;An, Ie-sle;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.12 no.2
    • /
    • pp.26-39
    • /
    • 2022
  • The purpose of this study is to establish a novel system for on-site management of construction and demolition waste. Construction waste has always been one of largest waste in the world and has long lacked an effective management system. Although various countries have planned the disposal of waste at the political level, the real-time and effective management of construction sites has not been mentioned. Especially in China, the continuous development of the construction industry also generates a large amount of waste, and China is not prepared for a large amount of construction waste. In order to alleviate the huge impact of construction waste on society and the environment, this study proposes a waste management method that combines Building Information Modeling technology and Radio Frequency Identification technology. Through this research, by using information technology to manage the generation and discharge of construction waste, and record the amount and information of waste generation, also improve the management method of construction waste.

The method for the classification according to their kinds and the estimation of unit generation rate for promoting recycling of construction and demolition(c&d) debris (건설폐기물 재활용촉진을 위한 종류별 분류 및 발생원단위 산정 방안)

  • Lee, Hi Sun;Kim, Dong Sik
    • Journal of the Society of Disaster Information
    • /
    • v.4 no.1
    • /
    • pp.86-100
    • /
    • 2008
  • It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.

  • PDF

Practitioners' Perception on Relationship between Production Planning and Waste Occurrence in Construction Projects

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.3
    • /
    • pp.1-12
    • /
    • 2014
  • Construction management has been suffering from many problems, which need to be solved or better understood. Most of construction projects have not achieved efficiency as expected. In this context, waste was also considered as a problem of efficiency decrease, and poor production planning was considered as a cause for waste. This study was conducted on the basis of waste concepts and production planning processes based on the philosophies of Lean Construction. A survey to find out the relationship between them was carried out through questionnaire, which was answered by experienced people in construction projects. The results have shown that frequency of wastes occurrence is quite high, and production planning processes are superficially performed in construction phase. There is a significant negative relationship between production planning and waste occurrence (r = -0.262). Weekly Work Plan (WWP) is the most dominant plan for waste control with seventeen in total of nineteen waste factors, and phase plan is the most dominant plan for two remaining waste factors. A case study was adopted to validate the relationship between production planning and waste occurrence. The results showed that the better the project was planned, the fewer the waste would occur on construction sites.

Development of a waste recognition model at construction sites (건설현장에서 발생하는 폐기물 인식 모델 개발)

  • Na, Seunguk;Heo, Seokjae
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.219-220
    • /
    • 2021
  • It is considered that the construction industry is one of the pivotal players in the national economy in terms of Gross Domestic Production (GDP) and employment. Behind the positive role of this industrial sector to the national economy, the construction industry generates approximately 50 % of the total waste generation from all the industrial sectors. There are several measures to mitigate the adverse impacts of the construction waste such as reduce, reuse and recycle. Recycling would be one of the effective strategies for waste minimisation, which would be able to reduce the demand upon new resources as well as enhance reusing the construction materials on sites. The automated construction waste classification system would make it possible not only to reduce the amount of labour input but also mitigate the possibility of errors during the manual classification process. In this study, we proposed an automated waste segmentation and classification system for recycling the construction and demolition waste in the real construction site context. Since the practical application to the real-world construction sites was one of the significant factors to develop the system, a YOLACT (You Only Look At CoefficienTs) algorithm was chosen to conduct the study. In this study, it is expected that the proposed system would make it possible to enhance the productivity as well as the cost efficiency by reducing the manpower for the construction and demolition waste management at the construction site.

  • PDF

Improvement of Construction Waste Treatment when Dismantling Building (건축물 해체 시 발생하는 건설폐기물 처리의 문제점 및 개선방향)

  • Chae, Kyeong-Seok;Park, Jin-Gu;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.536-539
    • /
    • 2008
  • Construction waste is given a great deal of weight on the total waste. Because of many reconstructions, urban redevelopment projects and dismantlement of dilapidated building, construction waste that generated by dismantlement is having a great effect on total construction waste. Problems about waste treatment are increasing along with an amount of construction waste. Therefore, environmental problems that related to waste treatment become a social issue recently and problems about waste treatment are confronted with a major subject. A study focuses on giving solutions to treat construction waste through quantitative analysis of the problems about waste treatment.

  • PDF

Comparison of the Construction Waste Generated by the Project and the Estimation of the Waste Generation Unit (건설공사 공정별 건설폐기물 발생량 비교 및 폐기물 발생 원단위 산정에 관한 연구)

  • Song, Tae-Hyeob;Seong, Jin-Uk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.5 no.4
    • /
    • pp.427-434
    • /
    • 2017
  • The generation of construction waste can be divided into a decommissioning phase and a new construction phase, and most of the waste is generated at the decommissioning stage. However, recently, domestic new construction construction has expanded to 150 trillion yards per year, so construction work is increasing rapidly. Especially, as the size of the construction work with much waste of construction waste exceeds 100 trillion, the management of the amount of construction waste in the new construction site is required. Unlike the dismantling work site, the new construction site can separate waste generated by each property, and relatively low foreign matter content is generated. The purpose of this study was to investigate the amount of construction waste generated by new construction sites and to calculate the unit amount of construction waste based on this. In addition, since the existing unit cost is centered on concrete and mixed waste, we set the basic unit by setting synthetic resin, waste wood, and waste board as additional items. The basic unit survey was carried out to investigate the wastes according to the characteristics of each construction period. As a result of the survey, the new construction site showed that most wastes were discharged in the first 30% and after 70% of the process, and the ratio of mixed construction waste was as high as 45%. As a result of this study, it was found that about twice as much waste was produced as compared with the conventional standard product.

A study on application of RFID technology for optimum Processing and management of construction waste (건설폐기물의 적정 처리 및 관리를 위한 RFID기술 적용방안)

  • Lee, Seul-Ki;Jeon, Sang-Min;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.774-780
    • /
    • 2007
  • Occurrence amount of construction waste dominates weight that is the most as 44.6% if examine domestic waste occurrence present condition, scales of construction becomes jumbo gradually depending on social environment that change and occurrence amount of construction waste is steadily increasing real condition. Construction waste processing and recycling expense have held about 0.5% to 1% of whole construction cost, but if do not manage construction waste efficiently in each construction site, ratio that construction waste processing and recycling expense hold in whole construction cost is expected that will rise more. This does hint that environmental harm and economical damage are serious by construction waste. In this study, system is activated in each construction site at information interchange system and waste electron succession and waste government official makes radio frequency realization technology (RFID) purpose suggest plan that can be applied efficiently through example analysis that a RFID technology is already applied by efficiently attained plan.

  • PDF

A Study on Estimation of Construction Wastes Units in Urban Development (도시개발지구내 건설폐기물 발생원단위 특성연구)

  • Kim, Sang-Keun;Chung, Ha-Ik;Kwon, Ki-Bum;Yu, Jun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1452-1455
    • /
    • 2008
  • In order to establish active and effective recycling plans on construction wastes, the study seeks to built unit generation data per construction waste types on each sector, prepare units data on urban construction waste generation and serve as meaningful data on the establishment of policies on construction waste recycling targeting urban regions. The significance of the study is on the establishment of construction waste recycling plan prior to generation, not as complementary measures on construction waste generated.

  • PDF

The Investigation on Application of Construction Waste Unit to Establish Resource Recycling System through Case Study (건설폐기물 자원순환체계 구축을 위한 발생원단위 적용에 관한 연구)

  • Son, Byeung Hun;Hong, Won Hwa
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.181-186
    • /
    • 2010
  • Research on construction waste unit was in progress in the 1995 when 'Proper Disposal and Recycling Measures for Construction Waste' was made by the Seoul Development Institute. Such an effort has been made in order to cope with the lack of natural resources in Korea and to utilize the reusable resources. Furthermore, these efforts have also increased due to the improved standing of Korea in the international community. A large number of residential buildings were built in the response to the government's policy by increasing the supply of houses between the 1970's and 1980's. In 2000, more reconstruction and redevelopment was done because of the aged buildings and change of use for those buildings. And the project has been actively promoted until now, which caused a sharp increase in the generation volume of construction waste. In Korea, 8 kinds of construction waste unit, including the standard construction manpower and materials estimation, are introduced. Currently, they provide standards to different building categories and waste properties while for construction sites different standards are applied. This study aims to measure the actual amount of construction waste after sample buildings are dismantled and analyzes the estimation of the waste quantity by using various standard units. Through comparison, this study will figure out the differences among the standard units in order to find out how to apply the standard units properly. Moreover, this research will provide practical measures to apply such units to construction sites.