• Title/Summary/Keyword: Construction volume

Search Result 1,471, Processing Time 0.028 seconds

Development of Labor Productivity Index for Steel Construction (철골공사의 노동생산지수 개발)

  • Kang Byoung-Ryoul;Kim Ki-Sung;Um Ik-Joon;Koo Kyo-Jin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.353-357
    • /
    • 2004
  • The construction competition is more deepened with the enterprise possibility increase which it follows in the regulation relaxation back against the construction market penetration which carries and the instability of market is added an extra weight and it solves the aspect where also the profitability which is caused by with low price bidding decreases. Against a productivity with the overcome plan it is researched plentifully and the far for a productivity improvement, there is so far to construction, the productivity being used with only include meaning, is to a practical affairs and the application ver)r as the level which is feeble is a possibility of doing. It is like that and the research develops the producing district possibility of new steel-frame work and in the actuality which sees the production volume of steel-frame work and a construction accomplishment process effectively and to be right numerical figures it does it plans it controls and manages the place ultimate objective which it puts.

  • PDF

DEVELOPMENT OF A WEB-BASED GEO-SPATIAL INFORMATION SYSTEM FOR THE ANALYSIS AND EVALUATION OF SOIL DATA

  • YongGu Jang;SangHoon Lee;HoYun Kang;InJoon Kang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1396-1403
    • /
    • 2009
  • The Ministry of Construction and Transportation (MOCT) has been constructing a nationwide soil information DB since 2000, as basic data for the construction of 'underground geographical information,' a project under the 2nd National Geo-spatial Information System (NGIS) master plan. The inputted soil information includes not only underground conditions such as the layer depth, type, color, and groundwater level, but also engineering information that can be applied to construction work design, such as on the standard penetration test and the compression test. It is difficult to use this information in soil analysis and design, however, because only the test results are currently available. A web-based geo-spatial information system was developed in this study to facilitate the effective application of the soil information database (DB). First, the space information, layer information, and engineering test information were loaded from the soil information DB in real time, and the earth volume, bearing capacity, and settlement were calculated to develop a web client that will evaluate the ground softness and liquefaction. It seems that the soil information DB can be actively applied to the planning and design of construction works using this system.

  • PDF

Analyzing Information Disclosure in the Construction CALS System: A Study on Improvement Strategies (건설CALS시스템 정보공개 현황분석을 통한 개선 방안 연구)

  • Xiu-Mei Zheng;Tae-Hak Kim
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.26 no.6_3
    • /
    • pp.1243-1249
    • /
    • 2023
  • The Public Data Act mandates that every public institution must make efforts to facilitate convenient access to public data for all and take necessary measures to universally expand the right to use such data. Furthermore, it specifies that the head of a public institution must provide the data held and managed by that institution to the citizens. The Construction Project Information Disclosure Service aims to increase the utilization of data within the Construction CALS System, creating new added value by disclosing information and fostering communication. This service seeks to enhance public interest and transparency, support the creation of new businesses based on construction project data, and stimulate related industries. Since 2019, a total of 26 types of information have been disclosed through this service. As the volume of disclosed information continues to increase, there has been a consistent demand for reducing burden on data providers and enhancing user functionality. This study analyzes the current status of the Construction CALS Information Disclosure System to identify its existing challenges. Subsequently, it establishes a systematic approach to the data opening process and proposes enhancements to information disclosure and search functionalities for addressing these challenges.

Division of Homogeneous Road Sections for National Highway by Genetic Algorithms (유전자 알고리즘을 적용한 국도의 동질성 구간 분할)

  • Oh, Ju-Sam;Lim, Sung-Han;Cho, Yoon-Ho
    • International Journal of Highway Engineering
    • /
    • v.7 no.4 s.26
    • /
    • pp.41-47
    • /
    • 2005
  • Traffic data such as traffic volume, speed, and vehicle Class are very important basic data for the plan and design of highway. Based on traffic data, the future service level of a specific highway and geometry of newly constructed or expended road is predicted and determined. The Ministry of Construction & Transportation has simultaneously surveyed coverage count and permanent count at highways since 1985. Traffic volume survey sections were determined at jointed nodes of highways and jointed nodes of highways and other roads such as freeway and local highway. Volume survey was performed at these sections. The premise to decide these sections is assumed that links between jointed nodes of main highways exhibit similar traffic characteristics. Recently, due to the change of highway geometries such as construction of detour road and installations of traffic facilities such as installation of media, traffic characteristics of the existing traffic volume survey sections was changed. To reflect these changes, traffic characteristics at homogeneous road sections was widely evaluated and analyzed. Using Genetic Algorithms, a model was developed for the evaluation of traffic characteristics at homogeneous road sections. Traffic volume survey sections were then determined through the application of the developed model for current traffic system.

  • PDF

Estimation Method of the Amount of Demolition Waste through Automated Calculation of Volumetric Spaces using Drones (드론 활용 체적산출 자동화를 통한 해체 폐기물량 예측기법에 관한 연구)

  • Ryu, Jung-Rim;Kim, Hye-Ri;Park, Won-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.6
    • /
    • pp.681-688
    • /
    • 2022
  • In this study, the process of drone photography, automatic volume calculation, total floor area conversion, and waste calculation was constructed as a QGIS plug-in to predict the demolition waste (DW) generated in an aged area where drawing information or building information is uncertain. Through a case study, the high consistency between the automatically calculated volume using the drone and the BIM volume based on the field measurement was confirmed. Field application was carried out for the planned demolition work site, and the consistency between the drone-based volume and the actual measurement-BIM-based volume was reconfirmed. The waste generation unit was applied and the amount of DW was calculated by setting the floor height and building type, and the entire process was completed within 6 hours. Although the difference between building information and building objects through drones occurred according to the setting of temporary structures, loads, and floor heights, it was found that the actual amount of DW was generated more than the initial estimate. It is expected that measures to improve the accuracy of volume and floor area conversion will be required through case studies in the future.

To Experimental Study of Alkalinity Recovery Agent application in field (알칼리회복제의 현장 적용성에 관한 실험적 연구)

  • 김광기;박선길;김우재;이영도;송병창;정상진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.7-10
    • /
    • 2002
  • Concrete used up to date semipermanent architecture material but now day concrete early deterioration emboss social issue because of construction structure and environmental factor. so, many study of deterioration concrete construction improve durability used impregnation alkalization agent. In These to Study of derelop reoairmeat material in reduce carbonation. xoncrete Building use Alkalinity Recovery Agent which is Realkalinity and strength surface. Alkalinity Recovery Agent undisposed application volume and cure the concrete period. To study Alkalinity Recovery Ahent spray and cure the concrete propriery in field.

  • PDF

Estimation of RPS Method Using 3-Dimensional Numerical Analysis (3차원 수치해석을 이용한 RPS 공법의 적용성 평가)

  • Roh, Jeong-Min;Shin, Eun-Chul
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.174-179
    • /
    • 2006
  • Recently, the crossing tunnel has been constructed frequently to connect the separated area by highway and railroad. The construction of crossing tunnel must be progressed while maintaining the existing traffic of the highway as well as railroad. There are many cross funnelling methods such as NTR, TRCM, Messer Shield, Front Jacking, and Pipe Roof Method. The advantages of adopting RPS(Roof Panel Shield) method in crossing tunnel construction with comparing other existing cross funnelling methods are needed a little volume of concrete and easy to change the direction of cutting shoe during the construction of pipe roof, The 3-dimensional numerical analysis of RPS to consider the arching effect was performed for the application in the crossing tunnel under railroad. The earth pressure distribution and settlement were predicted when the RPS method was applied during the excavation for crossing railroad tunnel construction.

A case study on efficient non pilot 2-Arch Tunnel in the urban (도심지에서 효율적인 무도갱 2-Arch 터널의 설계사례)

  • Yoon, Il-Byung;Kang, Hee-June;Kim, Hong-Dae;Kim, Dong-Sik
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.543-552
    • /
    • 2010
  • Due to increase in urban tunnelling as urban population and traffic volume increase, problems related with site security and civil appeal also increase. This paper presents a comparative analysis between conventional 2-arch tunnel method and non-pilot 2 arch tunnel method, which were performed in the basic design of Wie-Rae region. According to the analysis results, non-pilot 2-arch tunnel method is more efficient in terms of stability, constructability, and economic aspect. It is authors' wish that design procedure and method presented in this paper could help the design and construction of non-pilot 2-arch tunnel that should be planned in the near future.

  • PDF

A Study on the Traffic Flow Characteristic Analysis and Applicability of Work Zones (도로 공사중의 교통류 특성분석과 적용성에 관한 연구 -고속도로를 중심으로-)

  • Lim, Chae-Moon;Lee, Ju-Ho;Lee, Young-Woo
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.5 no.4
    • /
    • pp.329-337
    • /
    • 2002
  • It is the actual condition that the increasing traffic delay and accident caused by inefficient management on various construction by occupying the roadways. Since almost roadway improvements are for the public convenient, negative effects by them are ignored. But now due to the increase of traffics demand and limitation of road supply, the positive management scheme and treatment plan on the constructions must be considered. Thus, to the extent of this study divides uninterrupted flow into freeways and the Highway, yielding the time spread between under construction and not, that is delay time, we build capacity and delay model in the change of traffic volume and occupying length.

  • PDF

An Experimental Study on the Measurement of Finess Modulus Using CNN-based Deep Learning Model (CNN기반의 딥러닝 모델을 활용한 잔골재 조립률 예측에 관한 실험적 연구)

  • Lim, Sung-Gyu;Yoon, Jong-Wan;Pack, Tae-Joon;Lee, Han Seung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.10-11
    • /
    • 2021
  • As concrete is used in many construction works, the use of aggregates is increasing. However, supply and demand of high-quality aggregates has become difficult recently, and although circular aggregates that recycle construction waste are used, the performance of concrete, such as liquidity and strength, are being reduced due to defective aggregates. As a result, quality tests such as sieve analysis test are conducted, but a lot of waste occurs such as time and manpower. To solve this problem, this study was conducted to measure the assembly rate of fine aggregate, which accounts for about 35% of the concrete volume, using Deep Learning.

  • PDF