• 제목/요약/키워드: Construction tolerances

검색결과 14건 처리시간 0.022초

고속전차선로의 시공 허용오차가 집전성능에 미치는 영향에 관한 연구 (A Study on the Effects of Construction Tolerances on the Current Collection Performance for High Speed Catenary System)

  • 김태훈;서기범;박재영
    • 전기학회논문지
    • /
    • 제64권12호
    • /
    • pp.1782-1788
    • /
    • 2015
  • In this paper, analysis of the effects for construction tolerances on the current collection performance of high speed catenary system. The height of the contact wire is the geometrical position of the cantilever directly affects the current collection performance. Contact force when the height of the contact wire exceeds the construction tolerance were analyzed. As a result, the maximum contact force was analyzed to more than 350[N] that are recommended by EN50119. And when the geometrical position of the cantilever to exceeds the construction tolerance, the analysis results of uplift at the mast support points, it becomes 127[mm] that are recommended by UIC 799. If the construction tolerances exceeds the reference value, the current collection performance is deteriorated. Therefore, catenary system require high precision construction. In the future, there is a need for continuing research on the tolerance of catenary system in the actual operating state.

시공오차가 있는 선기초기둥에 공장제작보의 설치가 용이한 탑다운공사용 접합기술개발 (Development of Top-Down Connection System to Solve the Problem of Construction Tolerances in Installing Prefabricated Beams to Pre-founded Columns)

  • 김승원;정희원;박대영;김동건;박주현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 2부
    • /
    • pp.25-30
    • /
    • 2011
  • Almost prefounded columns for top-down construction certainly have construction tolerances in plan and plumbness. Therefore, it is very difficult to connect prefabricated beams to prefounded columns at each floor level after excavation by usual top-down connection method and this usual connection method leads to long construction time, increasing cost and decreasing quality. This paper presents a new method for connecting prefabricated beam to prefounded column with GROUT-JACKET CONNECTION SYSTEM consisting of sleeve, bearing-shear bands and grout. Details and illustrations of the connections and applications by GROUT-JACKET CONNECTION SYSTEM for the top-down construction are also included in this paper.

  • PDF

현장조사를 통한 철근콘크리트 구조 부재의 시공오차에 관한 연구 (Field Survey on the Construction Errors for the Members of Reinforced Concrete Structures)

  • 윤상천;지남용;최기봉
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제14권3호
    • /
    • pp.201-208
    • /
    • 2010
  • 본 연구에서는 현장타설 철근콘크리트 구조체에 대한 국내외 허용오차 관련기준을 검토하여, 현행 국내 허용오차 기준의 수준을 검토함과 동시에 합리적인 시공오차 측정방법과 측정기기를 제시하였다. 또한 국내 공동주택을 대상으로 철근콘크리트 구조 부재의 시공오차를 조사하여 현재 국내 시공오차 허용범위 만족도를 검토하고, 구조체의 저항능력 평가 시, 부재크기 오차의 불확실성을 고려한 합리적인 안전성 평가를 위한 자료를 제공한다.

Driving Burj Dubai Core Walls with an Advanced Data Fusion System.

  • Cranenbroeck, Joel Van;Hayes, Douglas McL;Sparks, Ian R
    • 한국항해항만학회:학술대회논문집
    • /
    • 한국항해항만학회 2006년도 International Symposium on GPS/GNSS Vol.1
    • /
    • pp.465-469
    • /
    • 2006
  • In recent years there has been considerable interest in the construction of super high-rise buildings. From the prior art, various procedures and devices for surveys during and after the phase of erection of a high-rise building are known. High-rise buildings are subject to strong external tilt effects caused, for instance, by wind pressures, unilateral thermal effects by exposure to sunlight, and unilateral loads. Such effects are a particular challenge in the phase of construction of a high-rise building, in as much as the high-rise building under construction is also subject to tilt effects, and will at least temporarily lose its - as a rule exactly vertical - alignment. Yet construction should progress in such a way that the building is aligned as planned, and particularly so in the vertical, when returning into an un-tilted basic state.It is essential that a straight element be constructed that theoretically, even when moving around its design centre point due to varying loads, would have an exactly vertical alignment when all biasing conditions are neutralised. Because of differential raft settlement, differential concrete shortening, and construction tolerances, this ideal situation will rarely be achieved. This paper describes a procedure developed by the authors using GPS observations combined with a network of precision inclination sensor to provide reliable coordinated points at the top of the worldwide highest-rise building under construction in Dubai.

  • PDF

Removable shear connector for steel-concrete composite bridges

  • Suwaed, Ahmed S.H.;Karavasilis, Theodore L.
    • Steel and Composite Structures
    • /
    • 제29권1호
    • /
    • pp.107-123
    • /
    • 2018
  • The conception and experimental assessment of a removable friction-based shear connector (FBSC) for precast steel-concrete composite bridges is presented. The FBSC uses pre-tensioned high-strength steel bolts that pass through countersunk holes drilled on the top flange of the steel beam. Pre-tensioning of the bolts provides the FBSC with significant frictional resistance that essentially prevents relative slip displacement of the concrete slab with respect to the steel beam under service loading. The countersunk holes are grouted to prevent sudden slip of the FBSC when friction resistance is exceeded. Moreover, the FBSC promotes accelerated bridge construction by fully exploiting prefabrication, does not raise issues relevant to precast construction tolerances, and allows rapid bridge disassembly to drastically reduce the time needed to replace any deteriorating structural component (e.g., the bridge deck). A series of 11 push-out tests highlight why the novel structural details of the FBSC result in superior shear load-slip displacement behavior compared to welded shear studs. The paper also quantifies the effects of bolt diameter and bolt preload and presents a design equation to predict the shear resistance of the FBSC.

고장력 볼트세트의 자리면형상과 토크계수에 관한 연구 (Study on the Profile of Nut Bearing Surface and the Torque Coefficient of a High Strength Bolt Set)

  • 이백준;손승요
    • 한국강구조학회 논문집
    • /
    • 제12권2호통권45호
    • /
    • pp.143-150
    • /
    • 2000
  • 마찰접합용 고장력 볼트 셋트의 관련 규격에서 허용하는 치수공차 범위 내에서 너트 구멍의 편심과 와셔 구멍 지름의 공차는 체결 시 편심에 의한 접촉면적의 결손을 초래하고 체결력의 산포를 유발하는 요인이 된다. 편평한 너트 자리면과 와셔의 접촉시 분포되는 압력의 비선형성을 고려하여 편평한 자리면 형상을 원호곡면으로 바꾸면 초기 선 접촉은 체결이 진행됨에 따라 면 접촉으로 발전한다. 원호 접촉면은 편심에 의한 접촉면적의 결손을 감소시켜 접촉상태가 양호해지므로 자리면 마찰토크(체결력) 안정화에 기여하게 된다. 유한요소법으로 너트와 와셔 접촉면의 압력을 구하고 나사면과 자리면의 마찰계수는 토크계수 A, B급이 포함되도록 조합하고 최대편심 시 토크계수를 계산하였다. 토크계수의 분포로부터 원호자리면의 적정 곡률반지름이 결정된다.

  • PDF

변전소 접지설계를 위한 접지전극 주변의 위험전압 측정과 분석 (Measurement and Analysis of the Dangerous Voltage Around Grounding Electrode for Safety in Substation Ground)

  • 손석금;김재철
    • 전기학회논문지P
    • /
    • 제60권4호
    • /
    • pp.214-219
    • /
    • 2011
  • The substation grounding design,"IEEE Guide for Safety in AC Substation Grounding (ANSI / IEEE Std 80)"has been widely used. Substation grounding design and substation grounding resistance of grounding network site to predict the voltage at the risk of a very important task, which is a ground fault current due to the influx of the ground network and due to rise in the Earth's potential can be applied to human dangerous Voltage within safe tolerances be configured to be the ground because the network. IEEE Std. 80 for the substation construction safety equipment on the ground securing the ground electrode and the mesh around the boundary potential distribution in terms of risk analysis by the touch voltage and the reference was to clean up the definition and the basic steps of the voltage of the voltage limits the risk of peripheral grounding electrode Suppression by the simulator through a new secure from dangerous voltage design techniques were presented.

Creation of an Environmental Forest as an Ecological Restoration

  • Lee, Chang-Seok;You, Young-Han
    • The Korean Journal of Ecology
    • /
    • 제24권2호
    • /
    • pp.101-109
    • /
    • 2001
  • We created an environmental forest on the basis of ecological design around the incineration plant of Jindo Engineering and Construction Co., Ltd., which is located in Jeongwang-dong, Siheung-si, Kyunggi-do. To get ecological information of this site, physico-chemical properties of soil on salt marsh, which is located close to the syudy site and of forest soil transported from other sites for ecological restoration were analyzed. Texture of salt marsh and transported soils were loam and sandy loam, respectively. pH, organic matter, T-N, available P, and exchangeable K and Na contents of salt marsh and transported forest soils were 6.7 and 5.4, 4.1 and 0.4%, 1.0 and 0.3mg/g, 46.7 and 6.8ppm, 521 and 207ppm, and 3.8 and 0.5mg/g, respectively. Introduced plants were selected among the dominant species of forests and the species composing the potential natural vegetation around the present study site. Those plants were selected again by considering the tolerances to air pollution and to salt, and their availability. Selected trees were Pinus thunbergii, Sophora japonica, Celtis sinensis, Quercus aliena, Q. serrata, Q. dentata, and Q. acutissima. Selected sub-trees were Albizzia julibrissin, Koelreuteria poniculata, and Styrax japonica and shrubs were Rhododendron yedoense var. poukhanense, R. mucronulatum, Callicarpa japonica, Euonymus alatus, E. japonica, and R. schlippenbachii. On the other hand, introduction of herbs was not considered except for Liriope platyphylla, which was ornamentally planted in one site. Planting bed of mound type was adopted to provide the fine drainage system. Mound was designed to furnish litter, A, B, and C layers simuating the profile of forest soil. Slope of mound was mulched by rice straw of 2cm in thickness to prevent for sliding of litter and soil in cases of strong wind or heavy rain. Height of mound was designed to secure more than 1 m by combining A and B layers. Narrow zones, in which mound with stable slope degree cannot be prepared, was designed to equip the standard soil depth with the introduction of stone for supporting. On the other hand, plants with shallow root system were arranged in some zones, in which satisfactory soil depth cannot be ensured. Plants were arranged in the order of tree, sub-tree, and shrub from center to edge on the mound to make a mature forest of a dome shape in the future. Dispersion of plants was designed to be random pattern rather than clumped one. Problems on creation of the environmental forest by such ecological design were found to be management or inspection by non-specialized project operators and inspecting officers, and regulations for construction without ecological background. Alternative plans to solve such problems were suggested.

  • PDF

톨러런스기반 플레이트 접합 장치를 사용한 고중량 RC보의 설치 성능 (Erection Capability of Heavy Precast Frames with Metal Plates using Wet Concrete for Tolerance)

  • 홍원기;응엔 반 티엔;응엔 만 컹;쿤디마나 에릭
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.12-13
    • /
    • 2021
  • Methods for the manufacture, erection, and assembly of heavy frame modules were proposed. Interferences among precast members were prevented by using bolted metal plates for dry precast beam-to-column joints during assembly with a clearance for tolerance implementing grouted concrete filler plates instead of metal filler plates. Clearances for tolerances were provided to avoid conflictions among components during erection phases. These gaps were, then, grouted by high-strength mortar. The constructability of new connections of a beam-to-column joint using bolted metal plates for precast structures was examined using a full-scale assembly test in which practical observations indicated that members could be aligned and placed accurately in both horizontal and vertical directions, leading to a fast and convenient assembling. Bolt holes of the endplate were properly aligned using couplers with 30 mm fastened length embedded in the columns. The assembly test demonstrated the erection safety and structural stability of the proposed joints that were without filler plates when they were subjected to heavy loads at the time of their erection. The facile and rapid assembly of precast beam-to-column connections with a 30 mm tolerance was observed. The proposed assembly method is rapid, sustainable, and resilient, replacing the conventional methods of concrete frame construction, offering a connection that can be used in constructing infrastructure, such as buildings and pipe-rack frames.

  • PDF

HSPF-PEST를 이용한 불연속 실측치 자동보정 (Automatic Calibration for Noncontinuous Observed Data using HSPF-PEST)

  • 전지홍;이새봄
    • 한국농공학회논문집
    • /
    • 제54권6호
    • /
    • pp.111-119
    • /
    • 2012
  • Applicability of 8 day interval flow data for the calibration of hydrologic model was evaluated using Hydrological Simulation Program-Fortran (HSPF) at Kyungan watershed. The 8 day interval flow monitored by Ministry of Environment located at upstream was calibrated and periodically validated during 2004-2008. And continuous daily flow monitored by Ministry of Construction & Transportation (MOCT) and located at the mouth was compared with daily simulated data during 2004-2007 as spatial validation. Automatic calibration tool which is Model-Independent Parameter Estimation & Uncertainty Analysis (PEST) was applied for HSPF calibration procedure. The model efficiencies for calibration and periodic validation were 0.63 and 0.88, and model performances were fair and very good, respectively, based on criteria of calibration tolerances. Continuous daily stream flow at the mouth of Kyungan watershed were good agreement with observed continuous daily stream flow with showing 0.63 NS value. The PEST program is very useful tool for HSPF hydrologic calibration using non-continuous daily stream flow as well as continuous daily stream flow. The 8 day interval flow data monitored by MOE could be used to calibrate hydrologic model if the continuous daily stream flow is unavailable.