• Title/Summary/Keyword: Construction stage analysis

Search Result 918, Processing Time 0.031 seconds

The Analysis CO2 Emission and Economic Efficiency of High-rise Apartment Houses (초고층 공동주택의 CO2 배출량과 경제성 분석에 관한 연구)

  • Roh, Seung-Jun;Tae, Sung-Ho;Kim, Tae-Hyoung;Keum, Won-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.47-48
    • /
    • 2012
  • In this study, the CO2 emission and economic efficiency of high-rise apartment houses were evaluated, and were analyzed as a way to establish database on the evaluation of environment-friendliness of high-rise buildings. To that end, standard of buildings to be evaluated were proposed through analysis of the designing guideline for high-rise apartment houses proposed by Seoul city, and CO2 emission of the subject buildings were evaluated based on the characteristics of materials admitted into each building and the amounts of energy consumed during lifecycle period. In addition, the initial costs in construction stage and annual costs in operation stage were set as analysis parameters, and along with calculation of direct cost by the consumption of construction materials and energy, the costs of CO2 emission were evaluated and analyzed. As a result, the CO2 emission and economic efficiencies of high-rise apartment houses by construction stage and operation stage could be analyzed quantitatively.

  • PDF

Development of Quasi-Conforming Shell Element for the Three Dimensional Construction Stage Analysis of PSC Bridge (PSC 교량의 3차원 시공 중 해석기법을 위한 준적합 쉘 요소 개발)

  • Kim, Ki-Du;Byun, Yun-Joo;Kim, Hyun-Ky;Lomboy, Gilson R.;Suthasupradit, Songsak;Kim, Young-Hoe
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.20 no.3
    • /
    • pp.329-338
    • /
    • 2007
  • The PSC box bridge constructed of concrete, reinforcing bar and tendon is a complex structure that exhibits tension cracks, nonlinear behaviour of steel and time dependent behaviour of concrete. The frame element is commonly used for construction stage analysis PSC bridges. However, the frame element does not show sufficient information when in the curved PSC box bridges. For the case of curved PSC bridges, the deformations in the inner and outer web are different. In this case, different jacking forces are required in the inner and outer webs. However, it is impossible to calculate different jacking forces if we use the frame element for construction stage analysis. In order to overcome this problem, the use of the shell element is essential for a three-dimensional construction stage analysis of PSC bridges. In the following, the formulation of a Quasi-conforming shell element and its application of PSC box girder bridge analysis are presented.

Development of an Assumed Strain Shell Element for the Three Dimensional Construction Stage Analysis of PSC Bridge (PSC 교량의 3차원 시공 중 해석기법을 위한 가정된 변형률 쉘 요소 개발)

  • Kim, Ki-Du;Song, Sak Suthasupradit;Hwang, Hyun-Jin;Park, Jae-Gyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.3
    • /
    • pp.108-117
    • /
    • 2010
  • The frame element is commonly used for construction stage analysis PSC bridges. However, the frame element does not show sufficient information in the curved PSC box bridges. For the case of curved PSC bridges, the deformations in the inner and outer web are different. In this case, the different jacking forces are required in the inner and outer webs. And it is impossible to calculate different jacking forces in the inner and outer webs if we use the frame element for construction stage analysis. In order to overcome this problem, the use of shell element is essential for a three-dimensional construction stage analysis of PSC bridges. In the following, the formulation of an assumed strain shell element and its application of PSC box girder bridge analysis are presented.

Case studies on construction and design in Colombo port, Sri Lanka (스리랑카 콜롬보항만 시공 및 설계사례 (ELIPO 및 COLPO 현장))

  • Lee, Seung-Won;Chung, Yoon-Young;Lee, Gab-Yeol;Park, Kyoung-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.44-57
    • /
    • 2010
  • The purpose of this paper is to introduce case studies on 2 projects for the construction of port facilities in Colombo, Sri lanka. In Queen Elizabeth quay development project in 2000, the damage at the bottom of steel tubular piles were occurred when piles were driven into subsoil for piled wharf structure in Stage 1. In order to prevent same incident in Stage 2 & 3, the pile driveability analysis were executed by dynamic formulas, analysis program, test driving and pile load tests. Through pile driveability analysis, prevention plans were proposed. In Colombo port expansion project in 2008, the mv method was applied to predict a primary consolidation settlement of a subsoil under a breakwater in the calculation stage. The $m_v$ was estimated from results of cone penetration tests and the final settlement by consolidation was calculated with it.

  • PDF

A Basic Analysis of the Management Factors the Application of Modular Construction Method in Buildings (건축물 모듈러 공법 적용을 위한 단계별 관리요인 기초적 분석)

  • Kim, Sung-Eun;Lee, Shin-Ja;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.373-374
    • /
    • 2023
  • Modular construction is a cost-effective and time-saving method of building that involves prefabricating modules in a factory and assembling them on-site. However, effective management factors must be considered at each stage of the process to ensure quality and stability. This study analyzes these management factors and proposes systematic ways to manage them, including construction planning, data management, and quality assurance. Proper management can improve construction quality, shorten construction time, and reduce costs. These stage-specific management factors are crucial for the success of modular construction projects, and further research and efforts are needed to promote its widespread use in the construction market.

  • PDF

Analysis of Collapse Accidents in Demolition Work using AcciMap and STAMP (AcciMap과 STAMP를 활용한 해체공사 붕괴사고 분석)

  • Hyeon-Ji Jeong;Jeong-Hun Won
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.3
    • /
    • pp.51-60
    • /
    • 2023
  • Investigation of the cause of the relatively recent building collapse accident in Gwangju revealed a lack of awareness about the safety of the dismantling construction system among stakeholders, in the form of issues such as illegal subcontracting, unauthorized design changes, and insufficient safety supervision. This study was conducted to analyze the safety interactions between the building dismantling construction system and the involved stakeholders and to propose ways to prevent accidents in related institutions and workplaces. AcciMap and STAMP-CAST analysis methods were used to evaluate safety interactions among the various stakeholders participating in building demolition work. Analysis results revealed that the collapse accident during the dismantling work was caused not only by structural causes occurring in the construction stage, but also by various causes throughout the system, such as the dismantling plan preparation stage and the construction permit stage. The results also revealed the need for proper implementation of safety control measures by various stakeholders to prevent collapse accidents during dismantling construction.

A Study on Analyzing the Factors Affecting Environmental Loads in the Planning Stage of Korean National Highway Projects

  • Park, Jin-Young;Park, June-Seok;Kim, Myeong-Jin;Kim, Sang-Ryong;Kim, Byung-Soo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.508-512
    • /
    • 2015
  • Carbon emission calculation guidelines provided by the Korean Ministry of Land, Infrastructure and Transportation (MOLIT) and existing environmental load assessment studies have suggested a method for estimating based on the volume determined after the design development. Therefore they are not being helpful in the decision making of the environmental economics of road facilities in the planning stage in which specific information on construction output volume is lacking. Based on literature analysis of existing studies and consultation from a group of construction environmental professionals, 12 types of property information considered to be related to environmental load were selected from an inventory of information that will be available in the road planning stage. In addition, multiple regression analysis was performed based on the environmental load computed through the life cycle assessment (LCA) of 40 national highway project cases of Korea to deduce five impact factors of environmental load in the road facilities planning stage.

  • PDF

A Study on the Efficiency of Safety Manager in Construction Project Stage (건설공사 사업 단계별 안전관리자 수행업무 효율화에 관한 연구)

  • Kang, Sang-Hun;Park, Hyun-Jung;Kim, Dae-Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.212-213
    • /
    • 2022
  • Recently, the construction industry is increasingly in need of securing safety rights due to repeated serious accident. Accordingly, the government enacted the "Serious accident Punishment Act" to strengthen punishment for serious accident and expand the scope of punishment. However, safety managers in the construction industry are still vulnerable to safety accidents due to the heavy workload. The purpose of this study is to increase the efficiency of performance tasks and reduce serious accidents in the construction industry through analysis of performance tasks by stages of construction projects. The tasks derived through domestic research and domestic and foreign system analysis were classified step by step to analyze the correlation between difficulty and preventive effect, and inefficient tasks were discovered and improved. This can be used as basic data for identifying safety management tasks and preparing effective safety prevention measures, and it is expected to be a preventive measure against industrial accidents in the construction industry by using it for efficient work reorganization by safety managers.

  • PDF

Construction Stage Analysis of Cable-Stayed Bridges Using the Unstrained Element Length Method (무응력길이법을 이용한 사장교의 시공단계 해석)

  • Park, Se Woong;Jung, Myung Rag;Min, Dong Ju;Kim, Moon Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.6
    • /
    • pp.991-998
    • /
    • 2016
  • The propose of this study is to demonstrate how efficiently and accurately the construction stages of cable-stayed bridges are analyzed using the unstrained length method (ULM) in which all unstrained element lengths are determined from a simplified analytical method (Jung et al., 2015). A forward analysis of cable-stayed bridges using the commercial FEA program, MIDAS is sequentially carried out considering the lack of fit force but the ULM is able to analyze a intermediate construction stage directly by taking the corresponding unstrained lengths of the construction stage model simply. The closing load step analysis is achieved by loading the pavement and counter weight forces in reverse. An Incheon bridge model is analyzed using the present ULM and the commercial program, respectively, and the two analysis results are compared.

The Status Quo of Graph Databases in Construction Research

  • Jeon, Kahyun;Lee, Ghang
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.800-807
    • /
    • 2022
  • This study aims to review the use of graph databases in construction research. Based on the diagnosis of the current research status, a future research direction is proposed. The use of graph databases in construction research has been increasing because of the efficiency in expressing complex relations between entities in construction big data. However, no study has been conducted to review systematically the status quo of graph databases. This study analyzes 42 papers in total that deployed a graph model and graph database in construction research, both quantitatively and qualitatively. A keyword analysis, topic modeling, and qualitative content analysis were conducted. The review identified the research topics, types of data sources that compose a graph, and the graph database application methods and algorithms. Although the current research is still in a nascent stage, the graph database research has great potential to develop into an advanced stage, fused with artificial intelligence (AI) in the future, based on the active usage trends this study revealed.

  • PDF