An Elective Multi-Project Management for the Small and Medium-sized Construction Companies - Focused on the Planning and Scheduling - (중소건설업체의 다중현장관리를 위한 공사관리업무의 효율화 방안 - 공정관리업무를 중심으로 -)

  • Choi Kwang-Hee;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-510
    • /
    • 2002
  • As the Scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened at site and reported to the head office. To simultaneously control the individual or large number of sites in large number of construction information, the necessity of making extract the important point of the information and the board of director's making a suitable decision to support the fields is increased. Also, as driving the construction industry to be informative, efficiently aggregating the information created in fields, efficiently making decision and controlling the construction work is increased the importance of the company's competitiveness factor. To simultaneously control multi-construction sites in the small and medium size construction firms define the fundamental and core information factor which needed in the head office and suggest the appling method.

  • PDF

The Way of Improving the Working Environment for Female Workers on Construction Site Based on Construction Welfare Facilities

  • Pak, Sungsine;Shin, Chang-Keun;Lee, Sang-Hak
    • Architectural research
    • /
    • v.22 no.2
    • /
    • pp.63-73
    • /
    • 2020
  • This paper reports problems of current working environment on construction site in South Korea from a female laborers' point of view and proposes solutions to improve the environment. To investigate and analyze the problems, a questionnaire survey and a focus group interview were conducted with 341 engineers and 557 laborers. Among them female engineers and female laborers were 51 and 136 respectively. Findings are the facilities related with welfare facilities such as lavatories, shower rooms, lounges and changing room, etc. for women were not sufficient and even not installed only for women because all of the planners for the facilities were men and The Standard of Estimate does not consider gender distinction. The data on the trade and the number of female laborers were not recorded and this study confirmed the number and the proportion of female laborers according to construction progress i.e. the proportion of female laborers were 0% ~ 11% (average 6%) at 26 construction sites having 2% ~ 92 % construction progress. In order to solve these problems, gender education for the welfare facility planner is required and the current Standard of Estimate should be revised considering female laborers after collecting the site data for the number of female laborers according progress and the increase in the construction cost should be reflected in the contract amount accordingly. Conclusively temporary work planning related with welfare facilities should be established and conducted in terms of gender equality at construction sites. In addition, improving working environment on construction sites for female laborers will enhance the company's image and also helping solve the labor shortage problem by women laborers engaging in construction industry easily.

Highly Efficient Checklist for the Safety Management of Reinforced Concrete construction (철근콘크리트 공사의 효율적 안전관리를 위한 체크리스트 제안에 관한 연구)

  • Shim, Un-Jun;Suh, Hyung-Suk;Ahn, Yong-Sun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.7-17
    • /
    • 2010
  • Modern construction technology has been highly systemized, which has simplified the construction methods applied to construction sites. However, on reinforced concrete construction sites, there have recently been many new disasters, and these have been bigger than before due to the heavy dependency on manpower. This study investigates the cause and cases of disasters during reinforced concrete construction. In addition, the study surveyed the psychological condition of construction site personnel in relation to the safety awareness and the causes of disasters, while deriving the basic components related to disasters on construction sites in order to analyze the relationship between each component to suggest an efficient safety management measures checklist. Construction site personnel should utilize the results drawn from this study as a disaster prevention tool to use in a safety education class, and not consider this simply as statistical data, but as a checklist to ensure full awareness of the appropriate priorities for safety categories to utilize in the reinforced concrete construction in order to execute reasonable safety management.

Assessment of Apartment Building Construction Workers' Noise Exposure (아파트 건설노동자 소음 노출평가)

  • Taesun Kang
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.33 no.3
    • /
    • pp.308-316
    • /
    • 2023
  • Objectives: The aim of this study is to measure and assess the occupational noise exposure levels among construction workers at apartment building construction sites in South Korea. Methods: Noise exposure assessments were conducted for 139 construction workers across 10 different trades at 53 apartment building construction sites in the northern part of Gyeonggi-do. Assessments were carried out using a noise dosimeter set with a 90 dB criterion, an 80 dB threshold, and a 5 dB exchange rate over a period of more than 6 hours(LMOEL) Results: The mean LMOEL (equivalent continuous noise level over 8 hours) for the 139 dosimeter samples was 87.8 ± 4.3 dBA. The mean noise exposure level for each construction trade, referred to as the trade mean, was also calculated. Significant differences in noise exposure levels were observed between construction trades (ANOVA, p < 0.001). The highest LMOEL values were recorded for concrete chippers (93.2 ± 2.6 dBA), followed by ironworkers (88.4 ± 0.7 dBA), concrete finishers (88.3 ± 2.7 dBA), masonry workers (87.7 ± 1.9 dBA), pile driver operators (85.6 ± 1.7 dBA), concrete carpenters (84.9 ± 2.4 dBA), interior carpenters (83.5 ± 2.1 dBA), and other groups (81.4 ± 2.2 dBA). Conclusions: The findings suggest that nearly all construction workers in this study are at risk of Noise-Induced Hearing Loss (NIHL). Moreover, the study establishes that construction trades can serve as a useful metric for assessing noise exposure levels at apartment construction sites.

Derivation and Implications of Digitalizing Key Construction Supervision Work: Focusing on the Construction Supervision Work of the Domestic Construction Sites

  • Chan Hyuk Park;Seong Mi Kang
    • Architectural research
    • /
    • v.25 no.1
    • /
    • pp.11-17
    • /
    • 2023
  • This study aims to derive key construction supervision work that can be digitalized among construction supervision work. The scope of the study includes domestic construction sites to which the Building Act of South Korea is applied. First, the construction supervision process was identified through extensive consultation of construction expert witnesses. Afterwards, the key construction supervision works for digitization were derived through survey results construction expert witnesses. Among the 24 supervision works throughout the pre-construction, construction, and post-construction stages, the proportion of supervision work manpower or cost, the type of data generated by supervision work and the urgency of introducing digital technology, and the impact on productivity and safety of supervision work were evaluated on a 5-point scale from "very low" to "very high" was investigated. The survey was conducted by t-test analysis, and as a result, it was possible to derive that the level of digitization was higher than average in "quality management," "safety management," and "collection and cooperation of maintenance instructions." It can be interpreted that digitization has been introduced on a pilot testing basis or has already been completed according to the needs of the site. On the other hand, it can be interpreted that the work that are obtained below the average score are considered to be realistically constrained at the construction site and that it is inevitable for the supervisor to proceed manually. Future studies include analyzing the quantitative impact of the key construction supervision work once digitalization is fully applied.

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF

A DEVELOPMENT OF INTELLIGENT CONSTRUCTION LIFT-CAR TOOLKIT DEVICE FOR CONSTRUCTION VERTICAL LOGISTICS MANAGEMENT

  • Chang-Yeon Cho;Soon-Wook Kwon;Tae-Hong Shin;Sang-Yoon Chin;Yea-Sang Kim;Joo-Hyung Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.242-249
    • /
    • 2009
  • High-rise construction sites, especially those situated in spatially constrained urban areas, have difficulties in timely delivery of materials. Modern techniques such as Just-in-time delivery, and use of information technology such as Project Management Information System (PMIS), are targeted to improve the efficiency of the logistics. Such IT-driven management techniques can be further benefited from state-of-the-art devices such as Radio Frequency Identification (RFID) tags and Ubiquitous Sensor Networks (USN), which has resulted in notable achievements in automated logistics management at the construction sites. Based on those achievements, this research develops USN hardware toolkits for construction lifts, which aims to be automated the vertical material delivery by sensing the material information and routing it automatically to the right place. The gathered information from the sensors can also be used for monitoring the overall status. The developed system will be tested in the actual high-rise construction sites to assess the system's feasibility. The proposed system is being implemented using Zigbee communication modules and RFID sensor networks which will communicate with the intelligent palette system (previously developed by the authors). To support the system, a lift-mountable intelligent toolkit is under development. Its feasibility test will be conducted by applying the implemented system to a test bed and then analyzing efficiency of the system and the toolkit. The collected test data will be provided as a basis of autonomous vertical transport equipment development. From this research, efficient management of the material lift is expected with increased accuracy, as well as better management of overall construction schedule benefited from the system. Further research will be expected to develop a smart construction lift, which will eliminate the need for human supervision, thus enabling a real 'autonomous' operation of the system.

  • PDF

Improving the Safety Awareness of Construction Workers (건설근로자 안전의식 향상방안)

  • Zhang, Zhen;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.451-457
    • /
    • 2014
  • The construction industry has a higher mortality rate of accidents than other industries although safety is recently being more important, and it has become a serious problem that needs to be improved. To reduce the number of accidents at construction sites, improving the safety awareness of construction workers is urgent because the lack of safety awareness is one of the key reasons for construction accidents. For this reason, this study compares and analyzes the safety awareness of construction managers and construction workers. Our research shows that the safety awareness of construction workers is lower than that of construction managers, and they have a different perspective on safety management. The development plan for improving the safety awareness of construction workers based on these results is proposed, and it will potentially help reducing the frequency of accidents at building construction sites.

A Study of Developing Guides for the Construction Site Quality Control of Porous Concrete (투수콘크리트 현장품질관리 지침서 개발에 관한 연구)

  • Ko, Eun-Jung;Goh, Eun-Joo;Seok, Ho-Joong;Lee, Seung-Hyeok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.65-71
    • /
    • 2009
  • General criteria for the quality of porous concrete have not been established yet in Korea. And yet, pavement and construction have been performed. In this paper, guidelines on the construction site quality control of porous concrete were developed in order to establish criteria for resolving the issues and problems of porous concrete, to establish methods for improving poor performance, and to manage porous concrete more systematically. In addition, a guide for the construction site quality control of porous concrete, which was appropriate for reality, was developed by researching several quality control guides and maintenance at construction sites. The guide consists of a total of nine chapters such as Application Range, Overview, the Structure of Porous Concrete, the Design of Package Thickness, Package Materials for Porous Concrete, Construction Methods, Quality Assurance and Inspections, Construction Site Quality Control, and Maintenance. It describes quality control guidelines in all steps such as methods for transporting porous concrete from the factory to the construction site, cautions for construction work at construction sites, maintenance, and management. The Guide for the Construction Site Quality Control of Porous Concrete is expected to ensure the quality of porous concrete, to reduce national costs for quality assurance, and to help ensure the health and safety of Korean people.