Agent-based Lift-car Group Operation Optimization Model in High-rise Building Construction

  • Jung, Minhyuk;Park, Moonseo;Lee, Hyun-soo;Hyun, Hosang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.221-225
    • /
    • 2015
  • To hoist construction workers to their working space is directly related to the productivity of building construction since hoisting tasks are carried out during the working time. In order to reduce hoisting time in the condition that the number of construction lift-cars is limited, various types of the lift-cars group operation plans such as zoning and sky-lobby have been applied. However, previous researches on them cannot be compared in the performance due to their methodological limitation, discrete-event simulation methods, and cannot be find better solution to increase the performance. Therefore, this research proposed the simulation-based optimization model combining the agent-based simulation method to the scatter search optimization methods. Using the proposed model, this paper carried out the comparison analysis on the performance of typical operation plans and also optimize an operation plans by controlling the service range of lift-cars, the size and number of service zones. In this case study, it is verified that better alternatives than typical operation plans can be exists and it is possible to increase the productivity of building construction.

  • PDF

Development of Construction Simulation Apparatus on Centrifugal Experiment (원심모형실험을 위한 시공단계모사장비개발)

  • Kim, You-Seok;Kim, Kyoung-O;Lee, Jong-Pil;Park, Jin-Woo
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.979-990
    • /
    • 2010
  • Although a centrifuge model test is performed with scaled models, it has a lot of advantages compared with usual scale model tests, for the reproduction of stress levels equal to a full scale test is possible. At the beginning of the Daewoo Institute of Construction Technology, a servo-motor-driven single axis actuator was introduced and has been in use with a geo-centrifuge. However, for variety of experiments and construction stage simulation, various apparatuses have been developed, such as a vacuum generator, a lateral actuator for tidal power simulation, a gravel hopper and a sand drainer for filled-up ground, and a water level controller. The apparatuses have been manufactured with enough strength and durability to be operated under specific g levels. This paper presents the properties of the apparatuses and the results of the tests performed with those.

  • PDF

A Production-Installation Simulation Model of Free-Form Concrete Panels

  • Lim, Jeeyoung;Lee, Donghoon;Na, Youngju;Lim, Chaeyeon;Kim, Sunkuk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.401-404
    • /
    • 2015
  • Demand on free-form buildings is gradually increasing, yet owing to the difficulty of production-installation work, several problems occur in the construction phase upon construction of a building, including the increased cost and construction duration, and reduced constructibility. To solve these problems, a techonology to produce FCP using a CNC(Computerized Numeric Control) machine is developed. The technology is that the information of designed free-form buildings to the CNC machine is transferred, and the transferred information is used for RTM(Rod-Type Mold, the mold shaped by back-up rods) and PCM(Phase Change Material) shaping, and the shaped RTM and PCM have the role of molds to produce FCP. Construction duration and project cost are limited in building sites, so the efficiency of processes like production-installation of FCP for application of the technology is significant. Since it is almost impossible to change the production-installation process at the construction phase when they are established, process should be deliberately decided. Therefore, the purpose of the study is to propose a production-installation simulation model of free-form concrete panels, in aspect of PCM. This paper is establishing the process for production-installation of FCP, estimating time required by each construction type and proposing a time simulation model that changes according to various constraints based on the analyses. With the time simulation model, it will be possible to build a cost model and to review the optimal construction duration and project cost.

  • PDF

Simulation of Tidal Flow and Water Quality in Onsan Harbor System (온산 항만 시스템에서 조류와 수질 변화 시뮬레이션)

  • Kim, So-Yeon;Park, Seok-Soon
    • Journal of Environmental Impact Assessment
    • /
    • v.8 no.3
    • /
    • pp.13-22
    • /
    • 1999
  • Tidal flow and water quality were simulated in this paper to assess environmental impact caused by pier construction projects in Onsan harbor system. The Surfacewater Modeling System (SMS) was applied to the Onsan harbor system, where coastal reclamation and dredging were planned to build the piers. A finite element mesh was constructed and refined to cover the complicated geometry of the Onsan harbor and the proposed reclamation area. The time variable change of tidal height at harbor inlet was given as an input condition to tidal simulation. The water quality simulation was based on the discharge rate of suspended solids at the reclamation area. The simulation results have shown reasonable agreements with real situations in both tidal flow and water quality. According to the proposed plan, tidal flow and water quality were predicted during and after the pier construction. The tidal simulation study showed that there would be no discernible change of tidal current in the harbor except for the dredged area. The water quality simulation, however, predicted that suspended solids would increase significantly near the reclaimed and dredged areas during construction.

  • PDF

Development of Computing Model for the Process and Operation Interval of Reinforced Concrete Work using Web-CYCLONE (철근콘크리트 골조공사의 프로세스 및 공정 공백 산출 시뮬레이션 모형 개발)

  • Park, Sang-Min;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.341-343
    • /
    • 2012
  • This study introduces a method for computation of process and operation gap in the specific construction operation(i.e., RC frame construction applying a block-grouping scheme) using CYCLONE-based simulation modeling and analysis technique. Since uncertainty of construction environment exists, a thoughtful production planning is required to effectively deal with a risk resulting in schedule delay in advance. This study presents the concepts of a time delay occurred in a process level and operation level in a operation model, and a method of measuring gap-times in each level while the simulation progresses. It helps a site manager to decide how many segmentation in a construction block is suitable for eliminating unproductive time-delays under the constrained resources (e.g., laborer, equipment). A case study presents a network model representing a three segmented RC frame work, and result obtained from the simulation experiment.

  • PDF

Evaluating Schedule Uncertainty in Unit-Based Repetitive Building Projects

  • Okmen, Onder
    • Journal of Construction Engineering and Project Management
    • /
    • v.3 no.2
    • /
    • pp.21-34
    • /
    • 2013
  • Various risk factors affect construction projects. Due to the uncertainties created by risk factors, actual activity durations frequently deviate from the estimated durations in either favorable or adverse direction. For this reason, evaluation of schedule uncertainty is required to make decisions accurately when managing construction projects. In this regard, this paper presents a new computer simulation model - the Repetitive Schedule Risk Analysis Model (RSRAM) - to evaluate unit-based repetitive building project schedules under uncertainty when activity durations and risk factors are correlated. The proposed model utilizes Monte Carlo Simulation and a Critical Path Method based repetitive scheduling procedure. This new procedure concurrently provides the utilization of resources without interruption and the maintenance of network logic through successive units. Furthermore, it enables assigning variable production rates to the activities from one unit to another and any kind of relationship type with or without lag time. Details of the model are described and an example application is presented. The findings show that the model produces realistic results regarding the extent of uncertainty inherent in the schedule.

Study on Development for Plan Model of Tunnel construction by using Arena;on focused NATM (ARENA를 활용한 터널공사계획모델 개발에 관한 연구;NATM공법을 대상으로)

  • Lee, Si-Wook;Kim, Ok-Ki;Woo, Sung-Kwon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.872-875
    • /
    • 2007
  • Estimation of total construction period and cost in the early stage of the project is very important. Simulation is one of the method considering proper compound such as tools, materials for effective construction management and estimating and analysing affected factors to construction through making suitable process. This study is to develop the model by using Arena simulation considering limited facts like blast time in a subway tunnel construction of both sides inner city. Developed model is easily useful type by using Visual Basic program, and can obtain total construction period and cost as a result. It could be used as a decision making tool in early stage of the construction.

  • PDF

Study under productivity measurement and verification of the underground temporary material installation work by simulation technique (시뮬레이션을 활용한 지하가설물 설치작업의 생산성 측정 및 검증에 관한 연구)

  • Bae Yeon-Jin;Park Sang-Hyuk;Han Seung-Heon;Paek Joon-Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.427-432
    • /
    • 2004
  • As it is keen competition of a construction market and the recognition that increases construction productivity for maintaining competitiveness, it is increased importance of an interest about productivity and efficiency in the construction industry. This study measures productivity through the instance of investigation that the existing productivity measurement method was utilized and presented a work improvement matter based on the measured contents. The proposed improvement matter is verified through a simulation technique. The purpose of this paper is for a field supervisor to have presented the way that a selection does the most suitable work method to be suitable for a situation, and can forecast production, though a simulation technique is not the most alternative that considered field condition in analyzing productivity measurement.

  • PDF

A Study on Simscape based 6DOF Field Robot Simulation Model (Simscape 기반 6자유도 필드로봇 시뮬레이션 모델에 관한 연구)

  • Choi, Seong Woong;Kwak, Kyung Sin;Le, Quang Hoan;Yang, Soon Yong
    • Journal of Drive and Control
    • /
    • v.19 no.2
    • /
    • pp.1-10
    • /
    • 2022
  • Field robots operate in various areas, including construction, agriculture, forestry and manufacturing. Typical tasks of field robots used in various areas include excavation, flattening, and demolition. Such tasks are often accomplished in narrow alleys or indoors. In the case of field robots, there is a limit to working in a small space. Thus, to compensate for these shortcomings, many field robots equipped with Tiltrotators have recently been observed. The advantages of Tiltrotator are improved task efficiency and reduced operating time by reducing unnecessary behavior. We need simulation models that can improve the ability of new people to work and simulate tasks in advance. Thus, in this paper, we developed a simscape-based simulation model and modeling of 6DOF systems for field robots equipped with Tiltrotator. Dynamic modeling of field robot 3D models using Simcape multibody and hydraulic systems of field robots using Simcape Hydraulics were modeled. We applied a PID controller to create a control system that operates along the input angle. Simulation results show that errors occur when comparing input and output angles, but overall, they move along input angles.

An Analysis on the Data Distribution of Construction Equipment Operations - A Case on Muck Hauling System - (건설 장비 운영 데이터 분포 특성에 관한 연구 - 버력 처리 시스템을 중심으로 -)

  • Seo, Hyeong Beom;Jung, Won Ji;Kim, Kyoungmin;Kim, Kyong Ju
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.4D
    • /
    • pp.661-670
    • /
    • 2006
  • The utilization of simulation has been limited in planning construction process because it is difficult to collect data and build a model using simulation method. This study collects construction operation data and analyzes the characteristics of its distribution. Through the statistical analysis on the empirical data, this study identifies Beta distribution functions is one of the most proper in duplicating the characteristics of construction equipment operation data into a computer simulation. The information obtained in this study can support preparing input data for another simulation.