• Title/Summary/Keyword: Construction simulation

Search Result 2,780, Processing Time 0.031 seconds

Construction Performance Evaluation of Steel Staircase Systems based on Construction Simulation CYCLONE Techniques (건설시뮬레이션 사이클론 기법을 활용한 시스템 철골계단 공법의 현장적용성 평가)

  • Lee, Jeong-Hun;Lee, Kyung-Suk;Kim, Hyun-Mi;Kim, Young-Suk;Han, Seung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.6
    • /
    • pp.19-26
    • /
    • 2010
  • Advanced construction technologies have been rarely applied to practical construction operations on jobsites due to a lack of quantified evaluation data of the performance of such technologies. The basic objective of this study is to suggest a feasible way for the evaluation of the performance of new technologies based on construction simulation techniques, which have been frequently used in academic research for productivity estimation. Steel staircase systems were selected as the new technology to be investigated. The simulation was implemented in various ways, such as one staircase to six staircases on a floor. The simulation results provided in this study suggest that planners are able to make a fundamental decision on the use of targeted new technology with the estimated performance data (productivity and unit costs). These findings also indicate that a simulation technique could be one of the methods appropriate for use as a planner's decision-making tool.

Simulation System for Earthmoving Operation with Traffic Flow

  • Kyoungmin Kim;Kyong Ju Kim;Hyeon Jeong Cho;Sang Kyu Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1359-1363
    • /
    • 2009
  • The object of this research is to develop a simulation system for earthmoving operations in consideration of the impact of congestion in-between equipment and existing traffic flow around the site. The congestion in-between equipment and traffic flow affect work productivity. The conventional discrete event simulation, however, has limitations in simulating the flow of construction equipment. To consider the impact of congestion in-between equipment and existing traffic flow, in this paper, a multi-agent based simulation model that can realize characteristics of truck behavior more accurately to consider the impact of congestion was proposed. In this simulation model, multiple agents can identify environmental changes and adapt themselves to the new environment. This modeling approach is a better choice for this problem since it describes behavioral characteristics of each agent by sensing changes in dynamic surroundings. This study suggests a detailed system design of the multi-agent based simulation system.

  • PDF

A Study on the Prediction of SIP Piling Noise by Computer Simulation (Computer Simulation을 이용한 SIP 항타소음의 예측에 관한 연구)

  • 이병윤;윤해동;김재수
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.14-21
    • /
    • 2001
  • Recently, with the increasing of construction works, large construction equipment are used to reduce the term of work and labor cost in construction field. Therefore, construction equipment noise has caused much annoyance for a number of dweller in nearby construction field and it has become a very serious problem in our living environment. Nevertheless, in our country, adequite guidelines for the construction equipment noise are very deficiency because of the lack of basic data and insufficient research works. From this point of view, this study attempts to survey the characteristics and prediction of SIP piling noise. On the basis of measurement value, we analysed about prediction possibility of SIP piling noise by computer simulation.

  • PDF

Structural Work Duration Estimation and Analysis of Tower-Type Residential Construction Project

  • Yun, Seok Heon;Kim, Sang Chul
    • Architectural research
    • /
    • v.14 no.3
    • /
    • pp.109-116
    • /
    • 2012
  • In order to shorten construction duration in high-rise project, construction company tried to make various system method toward simplifying construction method and shortening construction duration. Though high-rise tower-type residential project are growing, there are few case study. Then, the data for preliminary schedule planning in high-rise tower-type residential project are rare. This purpose of research shows construction method in structural work in high-rise tower-type residential project, suggests schedule planning in structural work through case studies. The structural work in high-rise tower-type residential project was divided 1) completion of form in lower part and 2) the typical floor under penthouse. The statistical analysis were done in two parts, the data from analysis were used in simulation. Finally, researcher confirmed the difference between real construction duration and the figure from simulation. The results shows that the more construction duration is long, the less ACS's cost is low. It means the effectiveness is increasing in ACS, if the floor number is high.

Development of a Simulation Model for the Productivity Analysis of Form Work in Multi-Family Housing Construction projects (공동주택 거푸집 공사의 생산성 분석을 위한 시뮬레이션 모델 개발)

  • Kang, Dong-Wan;Moon, Hyun-Seok;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.193-198
    • /
    • 2009
  • It is an important issue in cost management to contract with the standard of cost estimate by the reasonable way in public construction projects. For the standard of cost estimate based on the Standard Estimating System, there is a difference of labor inputs between Standard Estimating System and actual quantities in construction projects. The duration of form work in multi-family housing depends on the manpower compared with other work, which is the critical path on the schedule management to be decided quality, and is the important to the cost management of construction projects. This study presented a simulation model of the productivity analysis for selecting the standard work type of form work in Multi-family housing construction projects.

  • PDF

Modelling issues in the development of a simulation game for teaching construction management

  • Saad Al-Jibouri;Michael Mawdesley
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.774-780
    • /
    • 2009
  • Simulation is becoming increasingly popular in construction for training, planning and for assessment of projects. There are, however, significant problems inherent in simulating construction which are not common to other simulations. This paper describes the development and use of computer-based game for teaching and learning of some aspects of construction project management. It is concerned with the development of a model used to simulate the construction of a rock- and clay-fill dam. It includes detailed physical modelling of the performance of individual pieces of equipment and their interaction with the ground, the geography of the project and the weather in which the equipment operates. The behaviour of all of the individual pieces of equipment when acting as fleets is also discussed. The paper also describes the modelling issues of non-technical aspects of earthmoving operations. These include environmental impact, safety, quality and risks. The problems of integrating these with the physics-based models of the equipment performance are discussed. The paper also draws on real experience of using the game in classes in three universities in different countries.

  • PDF

A Study on Simulation Numerical Formula Model for Construction Process Efficiency (시공공정 효율화를 위한 시뮬레이션 수식모형 구축에 관한 연구)

  • Park, Jong-Hyuk;Jeon, Yong-Bae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.87-95
    • /
    • 2007
  • If construction process operate composing work team by judgment manager's experience, possibility that progress of construction process becomes as inefficient is much. But, If produce optimal proposal of resources allocation, construction cost and duration through simulation at work plan step, work schedule because do quantification efficient operate do on. When plan construction process in this research, resources allocation by change of work team operation change, resources cost loss, total cost, optimal proposal of construction duration tentative plan of numerical formula model that can do simulation propose. Apply and revealed to apartment house framework which horizontal work area of process and vertical work area are composed as is each different construction process to verify proposed numerical formula model. Achieved efficiency than work team's operation results which apply numerical formula model that is presented in this research and enforce simulation is applied in actuality example construction.

A Study on the PIMS and 3D Simulation Application of the Construction Field (건설공사 현장에서의 PMIS와 3D Simulation 적용에 관한 연구)

  • Tak, Seung-Won;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.967-970
    • /
    • 2007
  • If is become complicated and jumbo a construction project. therefore, is increased complication the management by enormous information. In addition, According IT technology develops, it is the course taking in IT technology for Construction project and information of construction technology in an object positively, It introduces a IT technique in construction project get out of personal experiences and knowledge that the expert and information joint ownership and collection and accumulation gets possible to advantage managed to advantage of Construction project. Also The information joint ownership and project progress situation grasp of construction project participation wild for being smooth, it is become accomplished, This research introduces the necessity and meaning of the PMIS or similar solution which is information-oriented structure and a information system of Construction industry of present. It applies the PMIS and 3D Simulation System from site and analyzes to expectative effect of information system construction

  • PDF

Job Training and Safety Education for Modular Construction using Virtual Reality

  • Choi, Hyeongho;Chae, Jeonghyeun;Kang, Youngcheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.5
    • /
    • pp.63-72
    • /
    • 2023
  • This study investigates the virtual reality (VR) simulation to train construction workers for modular construction. Recently, the construction industry has been experiencing a growing demand for modular construction due to a shortage of labors and an increasing social need for safety. While the demand for modular construction has been increasing, construction labors suffer a basic knowledge regarding modular construction. The users of the simulation, developed by Unity program and Oculus Quest 2, experience the removal of hazardous elements at the location whether the modular unit suspended by a crane is lowered, the lowering and assembly of units through crane operation, and the fall from the roof which is the most frequent accidents in modular construction. The simulation was tested by 15 subjects. The effectiveness of the education was measured through a survey on self-efficacy, perceived usefulness, usability, and presence. It was found that the VR training is suitable for educating on the modular construction activities and safety issues related to them. This study also found that perceived usefulness is the factor that has the greatest impact on self-efficacy. This study can contribute to resolving the labor education issues for the deployment of modular construction.

Development of Layer Object Simulation System for Construction Project based on Virtual Reality (가상현실기반 건설공사의 레이어 객체 시뮬레이션 시스템 구축 연구)

  • Kang, Leen-Seok;Ji, Sang-Bok;Kim, Seol-Gi;Moon, Jin-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.957-960
    • /
    • 2007
  • The construction information used in the design and construction phases are being gradually changed by 3D objects based on virtual reality (VR). This study developed an algorithm and computerized system to visualize layer object simulation that can be used in the pre-design phase. Layer object simulation enables designer to review expecting problems, which can reappear in real construction site, by building construction structures in a VR system. This function can be used as an important tool of virtual construction system.

  • PDF