ENHANCEMENT OF AVAILABILITY OF 4D SIMULATION BASED ON BUILDING INFORMATION MODEL TECHNOLOGY

  • Jong Jin Park;Eon Yong Kim;Hyun Cho;Han Jong Jun
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.579-586
    • /
    • 2009
  • 4D simulation integrates the 3 dimensional model of a building with the construction schedule, and it leads to the possibility of virtually checking the construction process and the building itself in advance. However, the existing problem of 4D simulation is the difference between the demands of architects, engineers, and construction site workers in 4D simulation. This study suggests the possible way to enhance the availability of 4D simulation, considering more the practical demands from the construction site. In order to conduct this study, we build a 3D BIM model of a business-residential complex and link the model with the pre-defined construction schedule in order to make a 4D simulation. This study concludes with the optimized 4D simulation methodology based on BIM model considering the demands in perspective of the construction site. It would contribute to the harmonic collaboration among architects, engineers, and labors in the construction site when using 4D simulation based on BIM model.

  • PDF

Application of BIM-integrated Construction Simulation to Construction Production Planning

  • Chang, SooWon;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.639-640
    • /
    • 2015
  • Traditional construction planning based on historical data and heuristic adjustment can no longer incorporate all the operational details and guarantee the expected performance. The variation between the expected and the actual production leads to cost overruns or delay. Although predicting reliable productivity on construction site is getting more important, the difficulty of this increases. In this regard, this paper suggested to develop BIM-integrated simulation framework. This framework could predict productivity dynamics by considering factors affecting on construction productivity at operational phase. We developed the following processes; 1) enabling a BIM model to produce input data for simulation; 2) developing the construction operation simulation; 3) running simulation using BIM data and obtaining productivity results. The BIM-integrated simulation framework was tested with structural steel erection model because steel erection work is one of the most critical process influencing on the whole construction budget and duration. We could improve to predict more dynamic productivity from this framework, and this reliable productivity helps construction managers to optimize resource allocation, increase schedule reliability, save storage cost, and reduce material loss.

  • PDF

Visualizing Construction Process Linking Process Simulation (프로세스 시뮬레이션을 연계한 건설공정 시각화)

  • Kim, Yeong-Hwan;Jung, Pyung-Ki;Seo, Jong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.73-79
    • /
    • 2006
  • Even though graphical simulation is very useful for construction planning, the application of graphical simulation has a limitation in dealing with objects without fixed form like earthmoving process. In this case, the mathematical/statistical simulation about the productivity of the whole processes based on the numerical data of working time, waiting time and working capacity of using equipment becomes effective. The mathematical/statistical simulation is not fully utilized in the field of construction due to the difficulties of creating process models and securing trust the numerically expressed results of simulation. In this research, the output of discrete-event simulation programs which are the most common mathematical/statistical simulation tool for construction processes were analyzed for the purpose of earthmoving process visualization. The purpose of this research is to develop a graphical simulation system that can help the construction planner select most suitable equipment and construction methods through the visualize the numerical simulation results of the working time, the queuing time as well as the amount resources etc.

3D Online Marshmallow Simulation Game for Target Value Design

  • Kim, Suryeon;Mainardi, Pete;Jeong, H. David;Rybkowski, Zofia;Seo, Jinsil Hwaryoung
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.661-668
    • /
    • 2022
  • Various lean design and construction methods such as target value design, pull planning, value stream mapping have successfully transformed the commercial building construction industry into achieving improved productivity, higher design and construction quality, and meeting the target values of construction projects. Considering the significant advantages of lean, the accelerated dissemination and adoption of lean methods and tools for construction is highly desirable. Currently, the lean design and construction body of knowledge is imparted primarily through publications and conferences. However, one of the most effective ways to impart this soft knowledge is through getting students and trainees involved in hands-on participatory games, which can quickly help them truly understand the concept and apply it to real-world problems. The COVID-19 Pandemic has raised an urgent need of developing virtual games that can be played simultaneously from various locations over the Internet, but these virtual games should be as effective as in-person games. This research develops an online 3D simulation game for Target Value Design that is as effective as in-person games or possibly better in terms of knowledge capture and retention and enjoyable environment and experience. The virtual game is tested on volunteers using feedback from pre-and post- simulation surveys to evaluate its efficacy.

  • PDF

Automated Generation of a Construction Schedule Based on the Work Method Template for 4D Simulation (4D 시뮬레이션을 위한 공법 템플릿 기반의 건설공정 자동 생성)

  • Song, Sung-Yol;Yang, Jeong-Sam;Myung, Tae-Sik
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.216-228
    • /
    • 2012
  • BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).

Application of Discrete Event Simulation on Tunnel Muck Hauling Operations (터널 버력처리 공정의 시뮬레이션 적용성에 관한 연구)

  • Kim, Kyoung-Min;Seo, Hyeong-Beom;Hwang, Ho-Jung;Kim, Kyong-Ju
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.141-149
    • /
    • 2007
  • Simulation has considerable potential as the tool of construction management, but in the case of domestic, it is at an early stage applying simulation to micro-process assesment. For applying simulation to the construction process, much effort is needed to collect input data and to build the model including the characteristics of site. This study introduces the methodology to collect operation data of construction equipment and build the simulation model, then verifies the model with the operation data. In addition, this study identifies main factors to determine the cycle time of the muck hauling system so that it suggests the method of construction process planning through operation and combination of construction equipments.

INCREASING REALISM OF CONSTRUCTION SIMULATION THROUGH INTEGRATION OF OPERATIONAL AND MANAGERIAL ASPECTS

  • Sangwon Han;Feniosky Pena-Mora
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.821-826
    • /
    • 2009
  • Current construction simulation approaches mostly focus on operation aspects of construction projects, ignoring managerial aspects which can radically change operational profiles (e.g., number of resources, expected productivity level, or daily working hours) during the course of construction. As a result, these approaches may mislead construction managers into unrealistic execution plans as well as make them difficult to find potential performance improvement areas. As an effort to address this issue, this paper establishes a comprehensive construction modeling framework which integrates operational and managerial aspects of construction projects. The proposed modeling framework will provide construction managers with more accurate, more reliable, and more realistic simulation results thus reducing the likelihoods of schedule delays and cost overruns.

  • PDF

SIMPLIFIED SIMULATION APPROACH TO MANAGING SCHEDULE-OVERRUN RISKS IN CONSTRUCTION OPERATIONS

  • Wah-Ho CHAN;Ming LU
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.929-934
    • /
    • 2005
  • The complex and dynamic job nature and the ever-changing working environment of construction projects inevitably present uncertainties to construction operations. Identification, evaluation and control of uncertainties constitute main elements of risk management and critical tasks of project management in construction. This paper is focused on application of a simplified discrete-event simulation approach in management of schedule-overrun risks, each being the combination of the occurrence probability of an uncertain interruptive factor and its potential consequence in terms of time delay. A case study observed from a concreting operation in Hong Kong is converted into a simulation model and analyzed with an in-house-developed simulation package for demonstrating how the proposed approach can be implemented to manage multiple schedule-overrun risks on construction projects.

  • PDF

A Study on the development of 4D based Architectural construction Simulation System (4D 시스템 기반의 건축시공 시뮬레이션 개발 방향 - 공정 프로세스 중심으로 -)

  • Jo, Jin;Kwon, Gi-Bum;Yun, Seok-Heon;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2007.04a
    • /
    • pp.119-122
    • /
    • 2007
  • The purpose of this study is to propose development of Schedule based Architectural Construction Simulation System. In this study (or paper), It analyzes the simulation system concept and its characteristics, and analyze the main functions simulation system and the range of functions which are already used currently. Therefore, It could find the limit of the present simulation system, and propose more effective solutions to develop Schedule based Architectural Construction Simulation System.

  • PDF

Construction performance assessment framework by means of construction simulation for earthwork operations

  • Kim, Yujin;Noh, Jaeyun;Ko, Yongho;Lee, Jaewoo;Han, Seungwoo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1194-1201
    • /
    • 2022
  • The existing literature has witnessed the importance of productivity assessment and deducing factors affecting it. However, yet many models have shown limitations in practical applications in actual construction sites for process planning due to uncertainty and lack of data. This research presents a productivity assessment and database generation framework using simulation and compares the results with RSMeans to derive appropriate equipment combinations alternatives for earthwork operations. Data of 15 different conditions was collected from 5 different construction sites. Prediction accuracy above 90% were achieved for the simulation models with average error rate of 7.4%. The construction productivity assessment framework presented in this study is expected to be highly applicable to operation planning for earthwork operations.

  • PDF