• Title/Summary/Keyword: Construction scheduling

Search Result 304, Processing Time 0.027 seconds

The Success Factors of Scheduling Using the TACT Technique in Wall Type Apartment House Construction (벽식(壁式) 아파트의 택트공정(工程)계획의 성공요인 분석에 관(關)한 연구(硏究))

  • Kim Joon-Ho;Kim Gwang-Hee;Cho Hyung-Keun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.79-86
    • /
    • 2006
  • Recently, the construction companies show lots of interest in reducing the construction duration of apartment housing project in Korea. Therefore, the purpose of this study is to investigate the success factors of scheduling using the TACT technique in wall type apartment house construction for managing the construction schedule effectively. For appling the tact scheduling technique to wall type apartment house construction, the success factors can be summarized as follows : (1) zoning the horizontal and vortical work area properly, (2) preparing the flow chart of finishing works, (3) minimizing the undefined activity like chipping off the concrete wall, (4) reordering the construction activities for keeping up the continuity of works in winter season, (5) dividing the amount of work for minimizing the delay time of any activity, etc.

Optimizing a Construction Schedule Considering Cash-flow (현금 흐름을 고려한 건설일정 최적화에 관한 연구)

  • Lee, Hyung-Guk;Lim, Tae-Kyung;Son, Chang-Baek;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.303-305
    • /
    • 2012
  • This paper presents a system called a Cash-flow based Construction Scheduling Optimization (CfSO). The existing CPM is biased on schedule and cost management. For a profitable and successful project management, the cash-flow which occurred actually by contractual conditions should be considered in the project scheduling. Therefore, this study provides a method to estimate the amount of a cash-flow occurred periodically by integrating the terms of contract into scheduling. The proposed methodology is implemented as a system prototype in Microsoft Excel. CfSO helps a site manager as a decision-maker to establish a optimized project scheduling and decide profitable contractual conditions against a construction owner.

  • PDF

Planning and Scheduling using EOT Claim analysis (EOT 클레임 분석 기법을 활용한 공정관리)

  • Woo, Han Kil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.248-249
    • /
    • 2021
  • Planning and Scheduling in Korean has been developed from Bar Chart to CPM, integrated management and EVM were attempted. As growing of overseas projects, Scheduler was also recognized as important one. However, the reality is that most Korean construction projects still remain in the preparation of construction plan and construction schedule in 1990s. The global Planning and Scheduling trend is EOT claims. I would like to understand the global trend of EOT claims and EOT analysis, and to find out Planning and Scheduling measures to successfully promote EOT claims.

  • PDF

Optimizing Construction Alternatives for Repetitive Scheduling (반복공정 최적 공법대안 선정 방법)

  • Park, Sang-Min;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.132-133
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Optimizing Construction Alternatives for Scheduling Repetitive Units

  • Park, Sang-Min;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.158-160
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of existing time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes to cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

DEVELOPMENT OF AN INTEGRATED MODEL OF 3D CAD OBJECT AND AUTOMATIC SCHEDULING PROCESS

  • Je-Seung Ryu;Kyung-Hwan Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1468-1473
    • /
    • 2009
  • Efficient communication of construction information has been critical for successful project performance. Building Information Modeling (BIM) has appeared as a tool for efficient communication. Through 3D CAD objects, it is possible to check interception and collisions of each object in advance. In addition, 4D simulation based on 3D objects integrated with time information makes it realize to go over scheduling and to perceive potential errors in scheduling. However, current scheduling simulation is still at a stage of animation due to manual integration of 3D objects and scheduling data. Accordingly, this study aims to develop an integrated model of 3D CAD objects that automatically creates scheduling information.

  • PDF

Cradle to Gate Emissions Modeling for Scheduling of Construction Projects

  • Sharma, Achintyamugdha;Deka, Priyanka;Jois, Goutam;Jois, Umesh;Tang, Pei
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.975-983
    • /
    • 2022
  • This paper presents an innovative way of integrating scheduling and project controls with the environmental impact of a construction project to track, monitor, and manage environmental emissions at the activity level. As a starting point, scheduling and project controls help monitor the status of a project to provide an assessment of the duration and sequence of activities. Additionally, project schedules can also reflect resource allocation and costs associated with various phases of a construction project. Owners, contractors and construction managers closely monitor tasks or activities on the critical path(s) and/or longest path(s) calculated through network based scheduling techniques. However, existing industry practices do not take into account environmental impact associated with each activity during the life cycle of a project. Although the environmental impact of a project may be tracked in various ways, that tracking is not tied to the project schedule and, as such, generally is not updated when schedules are revised. In this research, a Cradle to Gate approach is used to estimate environmental emissions associated with each activity of a sample project schedule. The research group has also investigated the potential determination of scenarios of lowest environmental emissions, just as project managers currently determine scenarios with lowest cost or time. This methodology can be scaled up for future work to develop a library of unit emissions associated with commonly used construction materials and equipment. This will be helpful for project owners, contractors, and construction managers to monitor, manage, and reduce the carbon footprint associated with various projects.

  • PDF

Development of a Scheduling Assistant Program for Usability Improvement of Construction Scheduling Solutions (건설 공정관리 솔루션의 활용성 증대를 위한 공정표 작성 지원 프로그램 개발)

  • Park, Sung Hwan;Lee, Si Wook;Woo, Sungkwon;Shin, Do Hyoung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.413-421
    • /
    • 2010
  • Scheduling management is one of the most important factors for the efficient performance of construction projects. Various computer-aided solutions for schedule management have been developed, but they are not commonly used in practice. This study conducted surveys on scheduling management methods and the related solutions to identify their status and problems in practice. Based on the results of the surveys, this study also developed a scheduling assistant program to improve the usability of scheduling management solutions. Through the developed program, the usability of scheduling management solutions will be improved in practice, thus enabling efficient scheduling management.

SIMULATED ANNEALING FOR LINEAR SCHEDULING PROJECTS WITH MULTIPLE RESOURCE CONSTRAINTS

  • C.I. Yen
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.530-539
    • /
    • 2007
  • Many construction projects such as highways, pipelines, tunnels, and high-rise buildings typically contain repetitive activities. Research has shown that the Critical Path Method (CPM) is not efficient in scheduling linear construction projects that involve repetitive tasks. Linear Scheduling Method (LSM) is one of the techniques that have been developed since 1960s to handle projects with repetitive characteristics. Although LSM has been regarded as a technique that provides significant advantages over CPM in linear construction projects, it has been mainly viewed as a graphical complement to the CPM. Studies of scheduling linear construction projects with resource consideration are rare, especially with multiple resource constraints. The objective of this proposed research is to explore a resource assignment mechanism, which assigns multiple critical resources to all activities to minimize the project duration while satisfying the activities precedence relationship and resource limitations. Resources assigned to an activity are allowed to vary within a range at different stations, which is a combinatorial optimization problem in nature. A heuristic multiple resource allocation algorithm is explored to obtain a feasible initial solution. The Simulated Annealing search algorithm is then utilized to improve the initial solution for obtaining near-optimum solutions. A housing example is studied to demonstrate the resource assignment mechanism.

  • PDF

Analysis of Construction Schedule Progress Management Practice (건설공사 진도관리의 현황 분석에 대한 연구)

  • Shin, Yoon-Kyung;Yun, Seok-Heon;Pack, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.207-211
    • /
    • 2010
  • As mega-sized and complex building construction projects are increased, the importance of project scheduling and control is emphasized. Project scheduling and control technic is not used widely yet in Korea, but interests in it is progressively increased. By now, most research projects mainly have focused on scheduling issues. Project progress management is also as much important as project scheduling issues. Current state about project progress management in Korea is analysed and way for improvements are suggested in this paper. At first, research projects undergone and practice are analysed and fields experts are survey about current state about project progress management. This study suggests the progress management method for quantitative and qualitative project progress analysis.

  • PDF