• Title/Summary/Keyword: Construction scale

Search Result 2,868, Processing Time 0.027 seconds

Risk Assessment of Agricultural Construction Works using Accident Analysis and Analytic Hierarchy Process (재해분석을 통한 농업토목공사의 공종별 위험성 평가)

  • Yang, Young Jin;Oh, Sue Hoon;Noh, Jae Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.4
    • /
    • pp.15-25
    • /
    • 2018
  • The accident risk at the construction workplace associated with agricultural engineering is comparatively higher than those of other fields due mainly to its complex work types and processes. Agricultural engineering deals with a variety of agricultural infrastructures from irrigation and drainage facilities to giant-scale coastal reclamation land infrastructures. The characteristics that most agricultural projects have conducted on a small-scale even worsen the situation drawing low attentions to risk management. Therefore, systematical risk assessment that focuses on details of agricultural construction work process is required in order to enhance safety management capacity and to prevent repetitive accidents ultimately. This study aims to categorize construction work types and processes of agricultural construction works, and to quantitatively assess the accident risk of them based on accident analysis. Regarding classification of construction works, actual 827 accident cases were thoroughly reviewed and coded by their construction site, facility and work type, project scale and so on. Most accidents (71.8 % of total cases) occurred in small-scale construction workplaces with less than 5 billion Korean won project budget. And those accidents related to agricultural infrastructure project (37.4%) and agricultural water development project (22.4%). In terms of work types, accidents frequently took place in form-work followed by pipe installation work, steel bar work and concrete work. The potential risks were compared with actual outbreak of accidents based on Analytic Hierarchy Process (AHP). The results show that the potential conditions of accident expected to be took place is somewhat different from the actual conditions where accidents actually happened. This implicates that risk management manuals or education needs to be adjusted by reflecting unexpected circumstances. Overall, this study is meaningful in that the results could be foundations as to strengthen risk management capacity for agricultural engineering projects.

A Study on the Overload Prevention Effect of Construction Waste Collection and Transportation Vehicles Using On-Board Truck Scale (자중계를 활용한 건설폐기물 수집·운반 차량의 과적 예방효과 연구)

  • Kim, Jong-Woo;Jung, Young-Woo
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.8 no.4
    • /
    • pp.444-449
    • /
    • 2020
  • In this study, On-Board Truck Scale was installed on the construction waste collection / transportation vehicles to monitor the weight of the waste at all stages from generation to final treatment. It was performed as a case study of a construction waste control technology that can efficiently manage the total generating and recycling amount using real-time weight/location information obtained by the On-Board Truck Scale device. As a result of the study, it was confirmed that the total amount of construction waste can be monitored in real time, and a plan for efficient logistics transportation can be derived through the analysis of operation patterns by managing the real-time transport volume, transport distance, and transport time of the construction waste collection / transportation vehicles. It was confirmed that overloading can be prevented in advance by controlling the loading also.

Risk Assessment for Disaster Reduction in Small-Scale Construction Sites (소규모 건축현장 재해감소를 위한 위험성평가 방안)

  • Choi, Hyun-Jun
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.395-404
    • /
    • 2022
  • Purpose: Small-scale construction sites have insufficient systematic safety management activities, and due to the characteristics of the construction site, the production structure is complex due to external environmental factors, and the risk of construction equipment is very high. We would like to propose a checklist method among practical risk assessment techniques that can derive risk factors for disaster prevention at small construction sites and reduce disasters. Method: Risk factors were derived by analyzing literature research and disaster cases, and detailed work for a checklist of risk assessment suitable for small-scale construction sites was classified based on risk factor items. Result: Hazard factors were divided into 6 major categories, and 29 detailed types of work were classified based on actual work types, and 80 detailed works were classified accordingly. Conclusion: By arranging risk factors suitable for small-scale construction sites according to the classification system, the lack of expertise in the construction site can be supplemented, and risk factors can be derived more easily and disaster reduction can be expected through establishment of safety measures.

A Study on the Feasibility Analysis of Large Scale Research Project (대규모 연구 프로젝트 타당성 분석에 관한 연구)

  • Lee, Hong-Cheol;Hwang, In-Ju;Kim, Tae-Hyung
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.334-339
    • /
    • 2008
  • Nowadays national research and development fund is continuously increased. And the evaluation on the feasibility of R&D budget investment was carried out. Through this study it was possible that a business feasibility evaluation of large scale research project. Also the benefit of research project about large scale plant(A plant) is $2.67{\sim}3.76$ times of research funds, and the R&D fund pay-back period is $6{\sim}8$ years. And also there is employment effect as $1,200{\sim}2,200$ every year, and $22,000{\sim}35,000$ within 20 years after research project.

  • PDF

Economic Feasibility Studies on the 4th Generation Light Source (제4세대 방사광가속기의 경제적 타당성 분석)

  • Baek Chul-Woo;Hwang Ji-Ho;Park Su-Dong
    • Journal of Korea Technology Innovation Society
    • /
    • v.8 no.3
    • /
    • pp.1005-1026
    • /
    • 2005
  • On the contrary to the expansion of feasibility studies on public construction and development projects, there is few feasibility studies on S&T, especially large-scale basic research facilities. Based on this critical mind, we tried the first feasibility study on large-scale basic research facilities, that is, the 4th Generation Light Source. First, it is validated whether the construction of 4th Generation Light Source is economically feasible and second, if economically feasible, the optimal place and time for construction are analyzed by using Analytical Hierarchy Process. This research shows that the construction is economically feasible irregardless of scenarios on future bio-medicine industry growth and to construct at Pohang in 2006 is optimal strategy. On the basis of this analysis, the feasibility studies on large-scale basic research facilities are expected to be more expanded and developed.

  • PDF

A Study on the Operating System of the Architectural Standard Scale of Length(尺度, Korean foot) used in the Hwasong City Wall in the 18th Century (척도운용체계를 통해 본 18세기 화성건축의 건축구성에 관한 연구)

  • Lee, Ho-Rak;Lee, Sang-Hae
    • Journal of architectural history
    • /
    • v.6 no.2 s.12
    • /
    • pp.65-77
    • /
    • 1997
  • The Hwasong City Wall was built for three years(1794-1796), but the real construction term was taken only 28 months. The wall and the buildings on the wall were built simultaneously, and the esttimated construction cost was highly restricted. These conditions were main factors for considering the high efficiency of construction productivity. This study examines these factors that are reflected in the operating system of the architectural standard scale of length, the architectural composition system in the Hwasong City Wall to reduce the construction cost. Through the study, following factors are found. 1.The rule of multiple proportion is found in the relationship between the partition distance, that is, span and the height of the girder which is related to the productivity of ready-made building members. 2.The ruling grade system of scale in the component members is found in the chang-bang(창방, penetration members)

  • PDF

Bearing Capacity Evaluation of Drilled Shaft for Top & Down Method (탑다운 기초 현장타설말뚝의 지지력 평가)

  • Cho, Chun-Whan;Kim, Hong-Mook;Kim, Woong-Kyu;Kwon, Se-Oh;Sung, Byung-Wan
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.58-65
    • /
    • 2004
  • Recently, the top & down method with drilled shafts as a foundation of high rise building is often adopted for the purpose of construction period reduction and construction cost effectiveness. It is common to omit the loading test as a Quality assurance on account of the high capacity of drilled shafts for the top & down method. It seems that the capacity of drilled shaft in recent top & down method is beyond that of conventional loading test method.However, the quality assurance for the drilled shaft as foundation of high rise building becomes much more important since the drilled shaft should bear much higher working load. It may be a small scale test pile could be an alternative as a quality assurance for the drilled shaft with high capacities. Through a case study, this paper gives an idea for solving the limitation of the conventional loading test method for the quality assurance of drilled shaft with high capacities. In particular, this paper analyzed the scale effect for a small drilled shaft installed into bedrock, which could be used for an alternative.

  • PDF

AN ONTOLOGY SCHEME FOR DISCRIMINATING CONSTRUCTION IETM FROM EXISTING INFORMATION SYSTEMS

  • Jeong, Jinwook;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.942-948
    • /
    • 2009
  • Today's construction is a large-scale and long life span program, so called Mega-scale project, that every moment constructor faces much of hardships, It is because of a large amount of stakeholders, data and complicated relationship among workers. In order to overcome these problems, IETM(Interactive Electronic Technical Manual) has been introduced to construction industry recently, It is regarded as a useful tool for handling the data, procedures of the construction, but it is similar to existing IT-based information systems, the PMIS(Project Management Information System) and the KMS(Knowledge Management System), without characterizing. This research is intended to find out IETM's property and to present the Ontology scheme discriminating Construction IETM from existing systems..

  • PDF

Development of job stress measurement system for construction field managers (건설공사 현장소장 직무스트레스 측정 시스템 개발)

  • Lee, Tae -Shin;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.121-122
    • /
    • 2022
  • Recently, the scale of construction project is getting bigger compared to previous projects. Therefore, the job stress of the field manager responsible for the construction project is getting more and more intense. Therefore, construction companies should establish a job stress management plan for stable human resource management of the field managers. From this perspective, in this study was developed a job stress measurement system in connection with MBTI personality types. The developed system allows the job stress of the field manager to be judged on a scale from 1 to 9 points. Accordingly, it is expected that construction companies will contribute to the effective management of field managers in the future.

  • PDF