AN EFFECT ANLYSIS OF RISK FACTORS FOR BUILD TRANSFER LEASE PROJECTS

  • Yang-Woo Lee;Soo-Yong Kim; Jung-Man Jung;Dae-Young Kim
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.498-508
    • /
    • 2007
  • The Build-Transfer-Lease (BTL) projects have rapidly increased under the Government support during recent years. This paper presents the risk analysis of factors affecting BTL projects in the initial phase. This study resulted in 10 significant risk factors influencing on each phase of BTL projects and then factors were grouped into each phase. The sensitivity analysis was also performed to identify risk factors with more significant influence on BTL projects. The results may useful to practitioners in order to cope with risks in initial phase of BTL projects. The paper resulted in the distribution of risks to project parties, thus it can be used as standards for risk assignment to competent authorities and private enterprises of BTL projects.

  • PDF

공공건설사업에서의 건설공사 사후평가시스템 구축에 관한 연구 (Development of the Construction Post-evaluation System in Public Construction Projects)

  • 옥현;양성훈
    • 한국산학기술학회논문지
    • /
    • 제15권12호
    • /
    • pp.7364-7371
    • /
    • 2014
  • 건설공사 사후평가는 공공건설사업 수행성과를 평가하고 차후 유사사업 추진 시 이를 활용하여 공공건설사업 효율화에 기여하기 위한 제도이다. 건설공사를 계획하는 과정과 공사완료 후의 공사비, 공사기간, 수요, 효과 등에 대한 예측치와 실제치를 종합적으로 분석, 평가하여 시행의 효율성을 도모하는데 목적이 있다. 이를 통해 방만한 사업추진을 방지하고, 유사 건설공사의 품질 및 효율성 향상을 위한 자료로 활용하고 있다. 하지만, 건설공사 사후평가 자료를 유사 건설사업에 참조 및 활용하기 위해서는 건설공사 사후평가 결과정보에 대한 체계적인 관리가 필요하다. 따라서 본 연구는 발주청별로 실시하고 있는 건설공사 사후평가의 결과정보를 체계적으로 통합 관리하고, 활용할 수 있도록 국토교통부에서 고시한 건설공사 사후평가 시행지침을 기초로 하여 건설공사 사후평가시스템을 구축하였다. 이를 통해 공공 건설사업의 수행 시 유사 건설사업의 수요 증감, B/C 비율 등 결과정보의 참조 활용을 통해 품질 향상 및 효율적인 사업 추진이 가능한 기반을 마련하였으며, 향후 사후평가 결과정보의 체계적인 관리를 통해 종합적인 분석 및 평가 등 유용한 도구로 활용될 수 있으리라 기대된다.

Construction of Time - Cost Model for Building Projects in Vietnam

  • Long, Le-Hoai;Lee, Young-Dai;Cho, Jeong-Wook
    • 한국건설관리학회논문집
    • /
    • 제10권3호
    • /
    • pp.130-138
    • /
    • 2009
  • Bromilow's time-cost (BTC) relationship was examined for building projects in Vietnam using actual construction time and total construction cost. Data set was collected from 77 historical building construction projects completed between 1999 and 2005 which were adjusted by consumer price index (CPI) to 2000 price. Time-cost equations were specified respected to two sectors, public and private, in Vietnamese construction industry and all cases. It is shown that a public funded building project has the longer construction duration than a similar budget private funded project. The resulting models are statistically significant. The adjusted R-square coefficients of all cases, public and private projects models are respectively 0.403, 0.436 and 0.377 mean that the BTC regression lines moderately fit the data set.

Development of A Computerized Risk Management System for International EPCS Projects

  • Yoo, Wi Sung;Kim, Woo-young;Sung, Yookyung
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.614-615
    • /
    • 2015
  • In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.

  • PDF

A SYSTEMIZED APPLICATION METHOD OF RFID TECHNOLOGY FOR LOGISTICS IN BUILDING CONSTRUCTION PROJECTS

  • Koo, Do-Hyung;Yoon, Su-Won;Chin, Sangyoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.79-87
    • /
    • 2007
  • An effective logistics management is necessary for successful construction projects. So, prompt and precise logistics information collecting and management is needed, but there has been no systematic and effective method for this, Therefore, in this research, a standardized plan for RFID application in logistics management that could comprehend processes in building construction projects, was developed. With the 7 generalized process types that comprehend processes in construction projects, critical factors that should be considered for RFID applications were derived, and systematic and efficient application method for building projects were developed.

  • PDF

COST PERFORMANCE PREDICTION FOR INTERNATIONAL CONSTRUCTION PROJECTS USING MULTIPLE REGRESSION ANALYSIS AND STRUCTURAL EQUATION MODEL: A COMPARATIVE STUDY

  • D.Y. Kim;S.H. Han;H. Kim;H. Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.653-661
    • /
    • 2007
  • Overseas construction projects tend to be more complex than domestic projects, being exposed to more external risks, such as politics, economy, society, and culture, as well as more internal risks from the project itself. It is crucial to have an early understanding of the project condition, in order to be well prepared in various phases of the project. This study compares a structural equation model and multiple regression analysis, in their capacity to predict cost performance of international construction projects. The structural equation model shows a more accurate prediction of cost performance than does regression analysis, due to its intrinsic capability of considering various cost factors in a systematic way.

  • PDF

Fundamental Investigation of Knowledge Management System for a Plant

  • Seo-kyung Won;Ji-Yune Soh;Junbok Lee ;Choong-hee Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.375-380
    • /
    • 2009
  • Gas & Oil plant construction projects are increasing recently all over oil-producing countries. An EPC (Engineering, Procurement and Construction) company, which participates in the plant projects, should possess pertinent engineering licenses and EPC management skills to create high added-value. Nonetheless, there exist various risks involved in the EPC life cycle process due to such characteristics of construction projects as long duration of construction time and complicated processes along with the procured goods or services subjected to various logistics. The objective of this paper is to analyze the overall EPC life cycle for proper process and to examine various information and document. Additionally, the principal data for the analysis of the EPC process are derived from personal interviews with experts and specialty contractors of the plant projects. The results of this study would be widely used as a guide for efficient and effective management of overseas gas plant projects.

  • PDF

A COST DATA-BASED ESTIMATING MODEL FOR FINISHES IN THE KOREAN PUBLIC OFFICE BUILDING PROJECTS

  • Joon-Oh Seo;Sang H.Park;Choong-Wan Koo;Jong-Hoon Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.685-691
    • /
    • 2009
  • Recently, public office building projects are being recognized by many construction engineers and researchers, as the critical projects in the construction industry. The project budgets have sometimes exceeded due to the lack of core knowledge, experiences, skills and experts concerned in cost planning and estimating in the pre-construction stage. It has been highlighted that planning and estimating effectively the cost of public office building projects as critical in the design stage. Within this context, some cost data books and systems, such as RSMeans cost data systems and Spon's price book, have been systematically developed and used by many construction cost managers and organizations in order to effectively estimate and use their project budgets. As a result of this research, a cost estimating model for finishes has been developed, considering the cost data used in public office building projects.

  • PDF

Assessing Contractor Competition in Competitive Bidding for Highway Construction Projects Using Network Analysis

  • Le, Chau;Arya, Minakshi;Moriyani, Muhammad Ali;Le, Tuyen
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.18-24
    • /
    • 2022
  • State highway agencies (SHAs) typically apply a competitive procurement procedure to select contractors for their design-bid-build projects. Since the level of competition affects construction bid prices and project outcomes, the Federal Highway Agency (FHWA) suggests SHAs seek ways to improve competition among contractors continuously. However, they rarely conduct an empirical assessment of the current competition level necessary to identify room for improvement. Besides the number of bidders on a project, other factors such as winning or losing rates among the contractors in previous projects can also indicate the degree of competition; only a few contractors may have won the majority of the projects in a specific region. However, few studies have investigated such factors. This paper proposes a network analysis-based approach to evaluating contractor competition levels of highway projects using historical bid tabulation data. The proposed method provides insights into overall competition levels, the determination of competitive contractors, and winning rate distribution among contractors.

  • PDF

이란 건설 프로젝트의 부패 원인에 대한 탐색적 요인 분석 (Exploratory Factor Analysis of the Causes of Corruption in Iranian Construction Projects)

  • 김수용
    • 대한토목학회논문집
    • /
    • 제38권2호
    • /
    • pp.369-376
    • /
    • 2018
  • 대부분의 건설 프로젝트는 초기단계에서부터 준공 운영단계에 이르기까지 다양한 유형의 부패에 영향을 받고 있다. 개발 도상국인 이란은 입찰, 투찰 과정, 계약 등에서 부패 문제로 어려움을 겪고 있다. 본 연구에서는 이란 건설 프로젝트를 대상으로 부패의 원인을 파악하고 그 중요도를 평가하고자 한다. 이를 위해 문헌연구를 통해 다양한 유형의 부패에 대해 조사하고 건설 프로젝트에 부패를 유발할 수 있는 잠재적 요소를 설문조사를 통해 파악하고자 한다. 설문지는 이란 건설 프로젝트에서 77가지 부패 원인을 포함하여 12 가지 유형의 부패를 고려하여 고안되었다. 수집된 설문지의 분석 및 탐색적 요인분석(EFA)을 통하여 "부적절한 권한 배분" 등 4가지의 주요 요인이 도출되었다. 본 연구 결과는 건설관계자와 학자들에게 도움이 될 것으로 사료된다.