Time-Profit Trade-Off of Construction Projects Under Extreme Weather Conditions

  • Senouci, Ahmed;Mubarak, Saleh
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권4호
    • /
    • pp.33-40
    • /
    • 2014
  • Maximizing the profitability and minimizing the duration of construction projects in extreme weather regions is a challenging objective that is essential for project success. An optimization model is presented herein for the time-profit trade-off analysis of construction projects under extreme weather conditions. The model generates optimal/near optimal schedules that maximize profit and minimize the duration of construction projects in extreme weather regions. The computations in the model are organized into: (1) a scheduling module that develops practical schedules for construction projects, (2) a profit module that computes project costs (direct, indirect, and total) and project profit, and (3) a multi-objective module that determines optimal/near optimal trade-offs between project duration and profit. One example is used to show the impact of extreme weather on construction time and profit. Another example is used to show the model's ability to generate optimal trade-offs between the time and profit of construction projects under extreme weather conditions.

DEVELOPMENT OF IDEA HIERARCHY MODEL FOR IDEA GENERATION OF CONSTRUCTION VE

  • Jinkook Yang;Sungwoo Moon
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.504-509
    • /
    • 2011
  • Recently, construction projects are very complicated and diverse such as high-rise buildings and big bridges, etc. These complicated projects call for a system which can effectively generate productive ideas and activities. Value Engineering (V.E.) activity within construction projects is a necessity for systematic design management and to improve construction ability. This need in the construction industry has required a regular implementation of VE into construction projects. For this reason; America, South Korea, and some other nations have adopted VE applications which control the baseline investments of the construction projects. The process of VE activity is a preferred system and a reasonable alternative. In particular, idea generation within these projects is an important stage in the VE job plan. In this study, VE idea patterns are extracted through best practice analysis from VE cases of road construction projects. Next, we suggest an idea hierarchy model to be used in conjunction with VE idea patterns. This model is supported by reasonable idea generation in VE activity of construction projects. Finally, this model could possibly be the outcome of successful VE results.

  • PDF

건축공사 환경관리비 운영체계 비교 분석 (Comparative Analysis of the Environmental Management Cost in Building Construction Sites)

  • 구자건
    • KIEAE Journal
    • /
    • 제10권4호
    • /
    • pp.111-116
    • /
    • 2010
  • The environmental management is essential for construction projects. The environmental management cost for construction projects is used for various purposes to control the environmental pollution and treat the wastes generated from the construction sites. Six construction cases were analyzed to compare the environmental management cost. The proportion of environmental management cost for total construction budget should be higher than 0.70% in redevelopment projects and 0.30% in newly constructed buildings, respectively, but every six construction cases did not meet the legal requirement. Redevelopment projects expanded more environmental management cost than the newly constructed projects especially in noise control and wastes treatment. In case of apartment construction projects, the proportion of environmental management cost of redevelopment buildings is 2.4 times higher than the newly constructed buildings, but in all cases, paid more attention to the noise and waste controlling measures than the wastewater treatment. It is needed to ensure the cost-effectiveness of environmental management for achieving the eco-friendly construction sites.

소규모 프로젝트의 효율적인 공사관리방안 (Application of Construction Management techniques in Small Construction Projects)

  • 이상범;이동운
    • 한국건축시공학회지
    • /
    • 제3권4호
    • /
    • pp.95-102
    • /
    • 2003
  • A construction project's period is limited by the order manufacture. And a construction project is requested a specific place, and has the characteristic to be irregular. Today, construction is to be representative high-cost and low-efficiency. This kind of problems appears in small construction projects more often than large construction projects. According to this facts, we recognized necessity of making practical application in methods of construction management. Also, we suggest application and establishment of integrated responsibility management department, PMIS(Project Management Information System) and Data Base. From now on, methods of construction management could be good opportunities for small construction projects and local construction companies. Therefore, small and local construction companies should try to improve their abilities. Likewise, the countries systematize to constitute the relation laws.

A PROACTIVE APPROACH FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS

  • Balasubramanian Kanagasabapathi;Kuppusamy Ananthanarayanan
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.744-747
    • /
    • 2005
  • The AEC (Architecture/Engineering/Construction) industry is facing a competitive world after it entered into the 21st century. Due to improper planning and scheduling, the construction projects face severe delays in completion. Most of the present day construction organisations operate in multiple project environments where more than one projects are to be managed simultaneously. But the advantages of planning and scheduling as multiple projects have not been utilized by these organisations. Change in multi-project planning and scheduling is inevitable and often frequent, therefore the traditional planning and scheduling approaches are no more feasible in scheduling multiple construction projects. The traditional scheduling tools like CPM and PERT do not offer any help in scheduling in a resource-constrained environment. This necessitated a detailed study to model the environment realistically and to make the allocation of limited resources flexible and efficient. This paper delineates about the proactive model which will help the project managers for scheduling the multiple construction projects.

  • PDF

A Probabilistic Fuzzy Logic Approach to Identify Productivity Factors in Indian Construction Projects

  • Princy, J. Darwin;Shanmugapriya, S.
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.39-55
    • /
    • 2017
  • Preeminent performance of construction industry are unattainable with poor productivity resulting in time and cost over runs. Enhancement in productivity cannot be achieved without identifying and analyzing factors that adversely affect productivity. The objective therefore is to propose a productivity analysis model to quantify the probability of effect of factors influencing productivity by using fuzzy logic incorporated with relative importance index method, for various types of construction projects. To achieve this objective, a questionnaire survey was carried out targeting respondents of Indian construction industry, from four distinct projects, namely, residential, commercial, infrastructure and industrial projects. Based on questionnaire administered, the relative importance and ranks of factors demonstrated using relative importance index method. Probability assessment model to analyze productivity was then developed by using Fuzzy Logic Toolbox of MATLAB. The applicability of the proposed model was tested in seven construction projects and the probability of impact of factors on productivity evaluated. The results of application of model in the construction firms infers that the most contributing factor groups for most of the projects were discerned to be manpower, motivation and time group.

RISK MANAGEMENT IN CIVIL CONSTRUCTION PROJECTS - FROM COST ESTIMATING PERSPECTIVE

  • Ashley Jaensch;Jian Zuo;Nicholas Chileshe
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.162-167
    • /
    • 2011
  • Construction projects are full of risks. This is particularly the case in civil construction projects that are often featured with large scale, complexity and involving a large number of participating parties. The eventuation of risks typically results in extended project durations leading to an increase in the total project budget. The consequence can be amplified considering the significant impacts of civil construction projects on the society, from economical, environmental and social perspectives. This research investigates the significance of risks within civil construction projects and approaches to deal with risks. Semi-structured interviews were undertaken with local industry practitioners in South Australia on this matter. It is found that the industry is fairly aware of risks associated with civil construction projects and subsequently has procedures in place to attempt to minimize the impacts of these risks on the project outcomes. The interview results also indicate that there is limited utilization of software for the risk management purpose from the cost estimation perspective.

  • PDF

The Critical Factors of Project Management in Sudanese Construction Projects

  • Hakami, Waled Gaber Mohammed;Yousif, Mohamed Ibrahim
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권1호
    • /
    • pp.1-7
    • /
    • 2014
  • The Sudanese construction sector is characterized by many small and large projects and high labor intensity, and accounted for 3.2% of the Sudanese country's GDP. The basic problems facing the Sudanese construction projects are the factors that affect on construction project performance. The objectives include identifying the factors affecting the performance of Sudanese construction projects, and to determine the critical factors. The literature review has been done to gather the information about the causes and their factors that affect on the performance of construction projects from the previous researches. The research methodology was conducted to gather the data by questionnaire which was examined to be reliable and valid according to statistical tests. The (34) factors were identified as factors affect on construction projects and the (10) factors were the critical factors which may lead to poor performance of Sudanese construction projects. This study has some conclusions such as the instrument for measuring the critical factors on the performance is reliable and valid, so the project management stage performance is 64.2%.

BIM Awareness Assessment among Hydropower Professionals in Nepal

  • Bhattarai, Sushmit Sharma;Kisi, Krishna P.
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.1154-1161
    • /
    • 2022
  • Building Information Modelling (BIM) has evolved into a comprehensive, collaborative method in construction project delivery. Most industrialized and developed countries have made BIM mandatory in the government and public projects, whereas developing countries are embracing and catching up BIM technologies to improve their professional's abilities and reduce claims in the construction projects. However, BIM awareness and professional's competence have become critical in implementing BIM in infrastructure projects in Nepal, particularly hydropower projects. The objectives of this study are to find the BIM awareness among hydropower professionals in Nepal and assess their response. The study used a questionnaire survey to assess the awareness. The results showed that only few professionals (12 percentage in this study) are aware of BIM and its application in Hydropower infrastructures. Majority of the respondents (more than 50%) were interested in BIM trainings and believed BIM implementation in future projects. The study indicated that lack of BIM training and lack of BIM awareness were the top factors affecting BIM implementation in hydropower projects in Nepal. The findings showed that about 66 percent of the respondents who used BIM in their projects mainly used during construction phase. More than 80 percent believed that BIM should be mandated for the hydropower projects in Nepal. The findings presented in this study could promote awareness among different professionals, organization, and construction team and encourage BIM implementation in Hydropower projects. The findings could raise awareness of BIM in Nepal's infrastructure sectors and its invaluable benefits in construction.

  • PDF

Schedule Management for Green Building Projects in Singapore: Schedule Delay, Causal Factors and Solutions

  • Hwang, Bon-Gang;Zhao, Xianbo;Leong, Lay Peng
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.527-531
    • /
    • 2015
  • With the mounting concerns over environmental issues, green construction is gaining a place in the global construction industry. However, rare research has been conducted to analyze green construction projects, especially in the aspect of project schedule performance. As a result, this study aims to investigate the degree of project delay in green building construction, analyze the factors affecting schedule delay of green building projects, and finally provide recommendations to improve schedule performance of green building project. To achieve the objectives, a comprehensive literature review was carried out, followed by a survey conducted with 30 companies that provided data from 220 traditional and 96 green building projects. The analysis of the responses identified that 15.9% of the traditional building projects were delayed while 32.3% of the green building projects were completed behind schedule. Furthermore, the amount of the delays in green building projects was an average of 4.8% of their planned schedule. The top 5 critical factors that can cause delay in green building projects were identified as: (1) speed of decision-making by clients; (2) speed of decision-making involving all project teams; (3) communication/coordination between key parties; (4) level of experience of consultants; and (5) difficulties in contractors' project financing. Lastly, a list of recommendations was introduced, aiming to reduce schedule delay in green building construction projects based on the observations. This study will serve as s a base for further research on the enhancement of green building project schedule performance.

  • PDF