Browse > Article
http://dx.doi.org/10.6106/JCEPM.2014.4.1.001

The Critical Factors of Project Management in Sudanese Construction Projects  

Hakami, Waled Gaber Mohammed (Construction Management, Sudan University of Science and Technology)
Yousif, Mohamed Ibrahim (Civil engineering, Sudan University of Science and Technology)
Publication Information
Journal of Construction Engineering and Project Management / v.4, no.1, 2014 , pp. 1-7 More about this Journal
Abstract
The Sudanese construction sector is characterized by many small and large projects and high labor intensity, and accounted for 3.2% of the Sudanese country's GDP. The basic problems facing the Sudanese construction projects are the factors that affect on construction project performance. The objectives include identifying the factors affecting the performance of Sudanese construction projects, and to determine the critical factors. The literature review has been done to gather the information about the causes and their factors that affect on the performance of construction projects from the previous researches. The research methodology was conducted to gather the data by questionnaire which was examined to be reliable and valid according to statistical tests. The (34) factors were identified as factors affect on construction projects and the (10) factors were the critical factors which may lead to poor performance of Sudanese construction projects. This study has some conclusions such as the instrument for measuring the critical factors on the performance is reliable and valid, so the project management stage performance is 64.2%.
Keywords
Critical Factors; Sudanese Construction Industry; Critical Causes; Performance;
Citations & Related Records
연도 인용수 순위
  • Reference
1 P.P. Zouein, I.D.Tommeleinb, "Automating Dynamic Layout Construction", Elsevier Science B.V., pp.409-416, 1994.
2 B.A. Sal, "Sudan economic report", Audi Saradar Group, 2010.
3 F.L. Bennett, "The Management of Construction: A Project Life Cycle Approach", 1st ed., Burlington: Butterworth-Heinemann, 2003.
4 S.M. Levy, "Construction Process Planning and Management", 1st ed., Burlington: Elsevier, 2010.
5 X. Huang, "An Analysis of the Selection of Project Contractor in the Construction Management Process", International Journal of Business and Management, vol. 6, no. 3, pp. 184-189, 2011.
6 National University of Ireland, "Recruitment and Selection Procedures National", University of Ireland, NUI Maynooth, Revised, 2006.
7 C.-F. Chen, "Job satisfaction, organizational commitment, and flight attendants' turnover intentions: a note", Journal of Air Transport Management, vol. 12, no.5, pp. 274-276, 2006.   DOI   ScienceOn
8 D. Brereton, R.Beach, D. Cliff, "Employee Turnover as a Sustainability Issue", Mineral Council of Australia's 2003 Sustainable Development Conference, Brisbane, Australia, 10th-14thNovember, 2003.
9 B.J. Jackson, "Construction Management JumpStart", 2nd ed., Canada: Wiley Publishing, 2010.
10 S. Linden, "Costs for On Site Material Handling in Housing", M.Sc.Thesis, Chalmers University Of Technology, Sweden, 2008.
11 C. March, "Operations Management for Construction", 1st ed., London and New York: Spon Press, 2009.
12 D.O'. Conchu'ir, "Overview of the PMBOK1 Guide", 1st ed., Switzerland: Springer, pp.75-90, 2010.
13 S. Azhar, S.M. Ahmed, A.A.Caballero, "Development of an Integrated Cost Estimation and Cost Control System for Construction Projects", Florida International University, 2001
14 S. Mubarak, "Construction Project Scheduling and Control", 1st ed., New Jersey: John Wiley & Sons, Inc., 2010.
15 Project Management Institute, "A Guide to the Project Management Body of Knowledge", 4th ed., Pennsylvania: Project Management Institute, Inc., 2008.
16 D.C. Zwick, K.R. Miller, "Project Buyout", Journal of Construction Engineering and Management, vol. 130, no. 2, pp.245-248, 2004.   DOI   ScienceOn
17 C. Andreasen, M.O.L.MBA, MAcc, K.R. Miller, "Contrasting Bid Shopping and Project Buyout", Brigham Young University, 2008.
18 D. Lock, "Project Management In construction", 1st ed., USA: Gower Publishing Limited, pp. 52-55, 2004.
19 M.O. Jannadi, S. Assaf, "Safety assessment in the built environment of Saudi Arabia", Safety Science, vol. 29, no. 1, pp.15-24, 1998.   DOI   ScienceOn
20 R.S. Done, "Improving Construction Communication: Final Report 560", Arizona: Data Methods Corporation, 2004.
21 K.K. Humphreys, "Project and Cost Engineers' Handbook", 4th ed., New York: Marcel Dekker, 2005.
22 J.F. Hair Jr., R.E. Anderson, R.L.Tatham, W.C.Black, "Multivariate Data Analysis with Readings", 3rd ed., New York: Macmillan Publishing Company, 1992.
23 M.Q. Patton, "Qualitative Evaluation and Research Methods", 2nd ed., London: Sage Publications, Newbury Park, 1990.
24 L.B. Bourque, E.P. Fielder, "How to Conduct Self-Administered and Mail Surveys -The Survey Kit 3", London: Sage Publications, 1995.
25 H.R. Bernard, "Social Research Methods: Qualitative and Quantitative Approaches", 1st ed., Thousand Oaks: Sage Publications, 2000.
26 B.B. Flynn, R.G.Schroeder, S.Sakakibara, "A framework for quality management research and an associated measurement instrument", Journal of Operations Management, vol. 11, no. 4, pp. 339-366, 1994.   DOI   ScienceOn
27 Y. Li, "The Design of An Information System For Technology Companies' Compliance With ISO 9000 Quality Standards", M.Sc.Thesis, University of Wisconsin-Stout, Wisconsin, 2000.