Can you predict the production performance using the make-ready performance?: Cases on highway construction projects

  • Yong-Woo Kim;Jinwoo Jang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.914-919
    • /
    • 2009
  • The research investigates for the relationship between the operating performances of the make-ready process and project production performance. To this end, the researchers proposed a metric of PCR (Percentage of Constraint Removal) to measure the make-ready performance. The study measured the production performance in two ways: production planning reliability and progress performance. We hypothesized that how well the make-ready process is performed has an impact on the degree of production performance. The statistical analyses are used to investigate that how operating performance of the make-ready process affects project production performance. The results of the regression analysis support our hypotheses (p<0.25) and correlation coefficients for the relationship between project production performance and make-ready performance are also significant (p<0.05).

  • PDF

Cost Normalization Procedure for Phase-Based Performance Measurement

  • Choi, Jiyong;Yun, Sungmin;Oliveira, Daniel;Mulva, Stephen;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.72-76
    • /
    • 2015
  • Capital project benchmarking requires an effective cost normalization process to compare cost performance of projects accomplished in different time and location. Existing cost normalization approaches have been established based on the assumption that all required information for cost normalization is fully identified once a project is completed. Cost normalization, however, is sometimes required to evaluate phase-level outcomes of an ongoing project where the required information is not fully available. This paper aims to provide a cost normalization procedure for phase-based performance assessment. The procedure consists of three normalization steps: currency conversion, location adjustment, and time adjustment considering various scenarios where the required information is not fully identified. This paper also presents how the cost normalization procedure has been applied to the 10-10 Performance Assessment Program, which is a phase-based performance assessment system developed by the Construction Industry Institute (CII). Both researchers and industrial professionals can apply the cost normalization procedure to studies and practices regarding to cost estimation, feasibility analysis, and performance assessment.

  • PDF

STRATEGIC ALLIANCE IMPLEMENTATION STATUS AND IMPACT ON PROJECT PERFORMANCE

  • Bon-Gang Hwang;Young-Ki Huh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.212-217
    • /
    • 2009
  • Strategic alliance is a proactive management process that integrates and optimizes value-added services of each party to best achieve business objectives of all parties within the relationship. Under the current competitive global environment, strategic alliance can produce a "Win-Win" situation and thus change paradigm that has resided in the construction industry. While many studies revealed the significance of alliance relationship in the industry, its impact on project performance has rarely been analyzed. Using the data obtained from 661 construction projects in the Construction Industry Institute database (359 projects from 38 owners and 302 projects from 29 contractors), this study first diagnoses the implementation status of strategic alliance at both project and company levels. Then, its impact on project performance is quantified and discussed. The descriptive analysis performed in this study revealed that an average of 79% of owner companies and 69% of contractor companies have ever implemented strategic alliance into at least one of their projects. However, both owner and contractor companies did not always use the strategy for all or their projects. Only 33% and 30% of projects reported by owners and contractors have been completed under alliance relationship, respectively. Analyzing the alliance impact on project performance, this study also establishes that strategic alliance positively affects project performance of both owners and contractors while owners should consider and control the level of its use for their projects. Recognizing and understanding the benefits from strategic alliance will be a starting point to produce mutual success among project participants, ultimately allowing the construction industry to go forward to a sustainable industry that transfers success from one project to the other.

  • PDF

The Effect of Cash Flow Variation on Project Performance: An Empirical Study from Kuwait

  • AL-NASSAFI, Nawaf Marzouq
    • The Journal of Asian Finance, Economics and Business
    • /
    • v.9 no.3
    • /
    • pp.53-63
    • /
    • 2022
  • Despite the relationship between cash flow, financial management, and project performance, no study examined the mediating role of financial management on the relationship between cash flow and construction project performance, especially in Kuwait. The goal of this study was to examine the impact of cash flow fluctuations on construction project performance, as well as the role of financial management in mediating this relationship. To accomplish these goals, the researcher employed a descriptive-analytical method to create a questionnaire of 31 items. The study's sample was chosen at random and includes (181) project managers and firm owners from contractors' companies in Kuwait. The study found a statistically positive and significant effect of cash flow variation on project performance from the perspective of Kuwaiti contractors at the significance level (0.05), as well as a mediated role of financial management in the relationship between cash flow variation and project performance. The research came up with a number of recommendations based on the findings, including the need for contractors to have a better understanding of cash flow to arrange project activities correctly and efficiently. Further studies may be included into the effect of cash flow forecasting (planning) and financial management (control) on various construction activities.

Effectiveness Analysis of the Use of Smart Technology on Construction Project Performance (스마트 건설기술의 활용이 프로젝트 성과에 미치는 효과성 분석)

  • Lim, Hyunsu;Cha, Minsu;Yoo, Wi Sung;Kim, Chang-Won
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.227-228
    • /
    • 2022
  • The slowdown of the global economic market due to the pandemic is causing the global construction market to stagnate, and the use of smart construction technology is drawing attention as one of the main alternatives to overcome this problem. In fact, a number of previous studies have been published that smart construction technologies such as building information modeling and drones can contribute to project performance improvement, such as productivity improvement and cost reduction. However, previous studies focus on the application direction and technical effectiveness of smart construction technology, so the analysis in terms of the contribution that the application of the technology has to the project performance is insufficient. Therefore, the purpose of this study is to focus on the effectiveness aspect of the application of smart construction technology on the project performance. The results of this study are expected to be able to be used as basic data for establishing policies related to the activation of smart construction technology promoted by the government and setting the direction for the use of smart construction technology by stakeholders.

  • PDF

A Descriptive Analysis of Project Participants' Perception about Complaint in Public Construction Projects

  • Lee, Changjun;Lee, Ju-Hui;Yun, Sungmin;Han, Seung Heon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.111-118
    • /
    • 2022
  • Conflicts in public construction projects become more serious and complex so that they have a negative effect on performance of projecets. Conflicts in public construction projects are defined as expanding in complaints. This study analyzes the relationship structure and effect on performance between complaints and conflicts. First of all, 219 survey data collected from industry experts were used to derive complaints arising from the project and to understand the characteristics of each complaint. In the case of environmental damages, rather than environmental damage during construction, harmful substances or effects that can occur in completed facilities cause complaints from local residents, and opposition from environmental groups has a great effect on time and cost increase. As for safety damage, civil complaints related to prevention and countermeasures for safety accidents occur frequently, and additional construction affects cost increases. Through this study, it is possible to understand the serious complaints that are prone to conflict in public construction projects, their frequency, and the performance of the project.

  • PDF

Assessment of the Impacts of "pre-Compensation and Post-Construction Policy" on Public Construction Projects (선보상-후시공 제도의 공공건설사업 파급효과 분석)

  • Kim Sang-Bum;Choi Jeong-Won
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.245-254
    • /
    • 2004
  • Pre-compensation and post-construction policy'(PCPC) is a part of $\ulcorner$public project performance improvement policies (PPPIP)$\lrcorner$ whose purpose is to reduce the construction project cost by $20\%$. This research focuses on measuring the quantitative and qualitative impacts of PCPC public construction project. The evaluation of PCPC was conducted using five performance indices which are measuring performance improvement in terms of project cost and schedule. The analysis results show that implementation of this policy reduced $4.8\%$ of public construction project budget while playing a positive role in shortening the project schedule.

Analyzing Planning Performance of Road Construction Projects Using Preliminary Feasibility Analysis Data (예비타당성조사 결과를 활용한 도로건설사업의 계획단계 성과 분석 연구)

  • Mun, Junbu;Yun, Sungmin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.1
    • /
    • pp.3-11
    • /
    • 2023
  • According to the post evaluation scheme in Korea of a public construction project which is more than 30 Billion KRW, project performance is evaluated by investigating outcomes and effects of the construction after the completion of the project. The current post evaluation results can be used for planning and estimating a construction project in the future. However, it is not easy to utilized for an on-going project because the system does not provide the phase-based performance of a project. Although project planning performance is important for project initiation, few attempt has been made to evaluate planning performance in Korea. The purpose of this study is to provide a conceptual performance evaluation of planning performance using preliminary feasibility study conducted by Korea Development Institute. This study developed a planning performance database using data extracted from preliminary feasibility study reports of the completed 354 road construction projects. This study analyzed the performance of the planning stage of road projects by developing absolute metrics such as standard construction cost and standard construction schedule based on a Lane-Km. Using the standard construction cost and schedule metrics, the planning performance was analyzed by project characteristics. The results of this study can be used for phase-based performance evaluation from planning phase to construction phase.

Performance Analysis Framework for Post-Evaluation of Construction Projects through Benchmarking from Advanced Countries (선진국 사례 벤치마킹을 통한 건설공사 사후평가 성과분석 체계 개발)

  • Lee, Kang-Wook
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.6_2
    • /
    • pp.1017-1027
    • /
    • 2022
  • Development of social overhead capital (SOC) requires huge national finance, and performance issues such as cost-efficiency, safety, and environment have been constantly raised. However, currently each construction client has limited access to its own projects' performance without analytic methodology for industry-level comparisons and benchmarking for improvement. To overcome this problem, this study proposes a comprehensive performance analysis framework for post-evaluation of large-scale construction projects. To this end, this study performed a case study of advanced countries (the U.S., the U.K. and Japan) and consultation with related experts to develop a tailored performance analysis framework for the Post- Construction Evaluation and Management system in Korea. The developed framework covers three categories (project performance, project efficiency, and ripple effect), nine areas (cost, schedule, change, safety, quality, demand, benefit-cost ratio, civil complaint, and defect), and 31 detailed metrics. Using industry-level project performance database and statistical techniques, the proposed framework can be used not only to diagnose excellent and unsatisfactory performance areas for completed construction projects, but also to provide reference data for future similar projects. This study can contribute to the improvement of clients' performance management practices and effectiveness of construction projects.

The Critical Factors of Project Management in Sudanese Construction Projects

  • Hakami, Waled Gaber Mohammed;Yousif, Mohamed Ibrahim
    • Journal of Construction Engineering and Project Management
    • /
    • v.4 no.1
    • /
    • pp.1-7
    • /
    • 2014
  • The Sudanese construction sector is characterized by many small and large projects and high labor intensity, and accounted for 3.2% of the Sudanese country's GDP. The basic problems facing the Sudanese construction projects are the factors that affect on construction project performance. The objectives include identifying the factors affecting the performance of Sudanese construction projects, and to determine the critical factors. The literature review has been done to gather the information about the causes and their factors that affect on the performance of construction projects from the previous researches. The research methodology was conducted to gather the data by questionnaire which was examined to be reliable and valid according to statistical tests. The (34) factors were identified as factors affect on construction projects and the (10) factors were the critical factors which may lead to poor performance of Sudanese construction projects. This study has some conclusions such as the instrument for measuring the critical factors on the performance is reliable and valid, so the project management stage performance is 64.2%.