• 제목/요약/키워드: Construction productivity

검색결과 1,120건 처리시간 0.031초

조건별 세부공종 시뮬레이션을 통한 아스팔트 포장공사의 생산성 분석 (Productivity Analysis for Asphalt Paving by Means of Simulation Technique for Site Conditions)

  • 김유진;이수민;노재윤;한승우
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.34-35
    • /
    • 2021
  • Currently, the Korean Smart Construction Corporation aims to stimulate overseas expansion of smart construction technology centered on Expressway development. In addition, the integrated classification system of construction information with Work Breakdown Structure(WBS) is currently being established in Korea, but its application to the construction industry is limited. In this study, data generation using simulation is carried out at the lowest level of WBS presented by the Korea Expressway Corporation, and detailed process productivity is predicted by site conditions.

  • PDF

초고층 골조공사 생산성 향상을 위한 작업 프로세스 개선 (A Work Process for Productivity Improvement of Concrete Structural Frame Work in Tall Building)

  • 장지선;신윤석;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2005년도 춘계 학술기술논문발표대회 논문집
    • /
    • pp.161-164
    • /
    • 2005
  • According to the trend of tail building, it is essential to improve productivity in tall building construction. However, the study on that is insufficient until now. Therefore, the purpose of this study is to propose a new work process of efficient concrete structural fame work to improve productivity in tall building construction. The results of being applied proposed work process are that the 5day cycle time of concrete structural frame work is cut by 0.5day and the quantity of rebar to be demanded in concrete structural frame work is reduced.

  • PDF

Classify and Quantify Cumulative Impact of Change Orders On Productivity Using ANN Models

  • 이민재
    • 한국건설관리학회논문집
    • /
    • 제6권5호
    • /
    • pp.69-77
    • /
    • 2005
  • Change is inevitable and is a reality of construction projects. Most construction contracts include change clauses and allowing contractors an equitable adjustment to the contract price and duration caused by change. However, the actions of a contractor can cause a loss of productivity and furthermore can result in disruption of the whole project because of a cumulative or ripple effect. Because of its complicated nature, it becomes a complex issue to determine the cumulative impact (ripple effect) caused by single or multiple change orders. Furthermore, owners and contractors do not always agree on the adjusted contract price for the cumulative Impact of the changes. A number of studies have attempted to quantify the impact of change orders on project costs and schedule. Many of these attempted to develop regression models to quantify the loss. However, regression analysis has shortcomings in dealing with many qualitative or noisy input data. This study develops ANN models to classify and quantify the labor productivity losses that are caused by the cumulative impact of change orders. The results skew that ANN models give significantly improved performance compared to traditional statistical models.

웹싸이클론을 이용한 가스압접공사의 생산성 분석에 관한 연구 (Productivity Analysis of Gas Pressure Welding Work Using Web-CYCLONE)

  • 구신혁;김용우;이동은;허영기;손창백
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.273-275
    • /
    • 2012
  • In apartment building with column structure, reinforcing bar of the column is constructed mainly using gas pressure welding job. Therefore, gas pressure welding job in very critical process is construction apartment building with column structure. The purpose of this study is to analyze productivity of gas pressure welding work in column structure apartment using Web-CYCLONE. In this study, a CYCLONE model was developed for the productivity analysis of gas pressure welding work. Through this model, the optimal combination of the resources was obtained. This study will be utilized in the future as a useful tool of productivity analysis and the determination of an optimal combination of resources for gas pressure welding in apartment with column structure.

  • PDF

전동윈치를 적용한 자립형 철골 접합부의 생산성 분석 (A Productivity Analysis of Self-supported Steel Joint using Automated Wire Control Machine)

  • 김창원;조남석;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.325-326
    • /
    • 2012
  • Because steel frame has own characteristics as easy to work and structural safety, it is being increased application by the trend of construction industry has been more higher and larger in today. However, steel frame works have potential problem, so fundamental solution is needed for preventing serious accidents. Recently, self-supported steel joint for enhancing safety is developed in Korea, but this system has some limitations as convenience of work, retainment of consistent productivity. For complementing this limitations, we developed the new system named Automated wire control machine. This study is performed productivity of steel frame work by new system. The basis data for analysing productivity is collected from field test.

  • PDF

모듈러주택 조립용공구의 생산성 및 품질향상 효과분석 (Effectiveness Analysis for Productivity and Quality of Assembly Tools for Modular Housing)

  • 김태영;김석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.243-244
    • /
    • 2016
  • The assembly of the modular housing is an important phase in the construction of pre-fabricated houses. However, the assembly tools that are commonly used in a work site have a disadvantage of decreasing the productivity and the quality. We have developed a exclusive tool for assembling modular parts. The structural stability of the developed tool has been verified in the previous studies. However, the experimental analysis was not conducted. This study analyzed the effect of improving the productivity and quality of the developed assembly tool. The result of the experimental analysis shows improvements in productivity and quality compared to the conventional assembly tool.

  • PDF

The Productivity Improvement for Steel Framing Work Efficiency by Work Sampling and 5-minute Rating Technique

  • Chang, SooWon;Yi, June-Seong;Son, JeongWook
    • Journal of Construction Engineering and Project Management
    • /
    • 제5권1호
    • /
    • pp.40-46
    • /
    • 2015
  • This study presents the results of our analysis and recommendations for process and productivity improvements. The project studied consists of a 5-story research building, with a structure of steel frames supporting concrete slabs. The observations focused on the analysis of the overall erection and framing process. The methods used for the analysis consisted in intensive visits on site, where construction processes were observed in term of resources, activities, durations, materials' handling procedures, and technology used. Back to the office, authors used the information captured to model the different trades' activities, using work sampling and 5-minute rating technique. The work sampling provides insight into the activity, hence allowing for process improvements. The productivity of various trades is strongly dependent on the organization of the work process and work site conditions. Improving the productivity of the entire project or company is not possible until everyone is committed to improvement.

철근콘크리트 공사의 작업 생산성 분석을 위한 3차원 객체 활용 정보관리 시스템 구축방안 (A Framework on 3D Object-Based Construction Information Management System for Work Productivity Analysis for Reinforced Concrete Work)

  • 김준;차희성
    • 한국건설관리학회논문집
    • /
    • 제19권2호
    • /
    • pp.15-24
    • /
    • 2018
  • 국내 건설산업에서 생산성 정보의 필요성과 그 활용에 대한 중요성 인식에도 불구하고, 현장 단위의 공사계획 시 효과적인 피드백을 통한 생산성 정보관리가 미흡한 실정이다. 공사계획의 신뢰성을 향상하기 위해서는 생산성 정보의 효과적인 활용이 요구되지만, 현장에서는 공사계획을 관리자의 경험 및 직관에 의존하고 있다. 생산성 정보가 효과적으로 관리되지 못하는 이유는 생산성 정보의 관리를 위한 추가 인력투입이 어렵다는 점, 기존의 생산성 정보가 새로운 프로젝트에 적용되기 어렵다는 점 등 때문인 것으로 파악되었다. 이러한 문제의 해결방안을 제시하기 위해서 선행연구조사 및 면담조사를 하였고 그 결과 새로운 시스템이 필요하다는 사실을 확인하였다. 새로운 시스템의 요구사항으로는 최소화된 업무, 한정된 정보관리범위, 정보의 분류, 정보의 피드백, 생산성 저하요인의 고려 등이 있다. 본 연구에서는 상기 내용을 바탕으로 생산성 저하요인 및 생산성 정보의 관리가 가능한 시스템의 프레임워크를 제안하였다. 이 시스템은 사용자 접근성이 좋은 SketchUp 소프트웨어를 활용하여 프로그램의 활용에 따른 추가인력의 투입이나 업무량 증가를 최소화할 수 있도록 하였다. 제안한 시스템은 준비단계, 입력단계, 처리단계, 출력단계의 총 네 단계의 과정을 통해서 정보를 입력하여 처리하고 출력하도록 하였다. 입력한 시공정보는 건축공사 표준시방서에 기재된 내용을 참고로 구성한 Task Breakdown Structure (TBS)와 Material Breakdown Structure (MBS)를 통해서 분류되어 생산성 정보로 변환되도록 하고, 변환된 정보를 그래픽으로 화면에 출력하도록 하여 사용자는 이를 활용해 해당 현장에서의 생산성 정보를 활용할 수 있도록 하였다. 본 연구에서 제안한 생산성 정보관리 시스템을 K 사옥 공사현장에 대입하여 현장적용 가능성 및 정보 활용성 측면에서 검증하였고, 사용성 및 적용 가능성에서 매우 긍정적인 결과와 정보 활용에 따른 이득이 있을 것으로 예상되었다. 본 시스템을 활용할 경우 생산성 정보를 활용한 공사계획이 가능할 것이고 추후 정보가 지속해서 누적될 경우, 본 연구의 기대효과는 더욱 높아질 것으로 사료된다.

구조방정식 모형을 이용한 노동생산성 저하요인의 영향 분석 (A Study on the Analysis of Factors Influencing Labor-Productivity using Structural Equation Modeling)

  • 곽동진;임진식;권경수;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.187-188
    • /
    • 2013
  • Meanwhile, the importance of managing factors affecting labor productivity has been recognized and emphasized. However, in the previous study, qualitative evaluation only took place for these factors. In this study, therefore, identified and quantified the priority of factors decreasing labor productivity, and established basic data.

  • PDF

공동주택 공사에서의 생산성 향상을 위한 건축 외관용 PC의 적용 타당성 분석 (Feasibility Analysis of the Use of Architectural PC for Improving the Productivity in Apartment Housing Projects)

  • 이현석;손영진;이윤선;김재준
    • 한국건설관리학회논문집
    • /
    • 제9권3호
    • /
    • pp.118-125
    • /
    • 2008
  • 최근 주5일 근무제도, 공기 단축형 입찰제도와 후분양제도의 도입과 같은 제도적 변화로 건설공사에서 생산성 향상에 대한 관심이 증대되고 있다. 그러나 국내 건설 산업의 생산성은 선진국에 비해 현저히 낮은 것으로 지적되고 있다. 현재 초고층 공사가 활발히 이루어지고 있는 두바이 및 북미, 동남아시아 등지에서는 외부 커튼월로 건축 외관용 PC (Architectural PC)가 사용되고 있다. 이는 국내 공동주택 공사에서의 외부 날개벽, 수벽 및 파라페트 등의 외벽 마감을 대체하는 것으로 공기 단축 등의 생산성 향상 효과를 인정받아 해외에서 널리 사용되고 있다. 이에 본 연구에서는 국내 공동주택 공사에서 건축외관용 PC 도입을 제안하고, 건축 외관용 PC 활용에 따라 생산성 향상이 가능한지를 검증하였다. 설문 결과 공동주택의 외벽 마감에 건축 외관용 PC를 사용하였을 때 기존 공동주택 공사보다 생산성 측면에서 우수하다고 분석되었다.