• Title/Summary/Keyword: Construction problem

Search Result 3,309, Processing Time 0.026 seconds

Development of Project Delivery System for Modular Building in Korea

  • Nam, Sung-hoon;Kim, Kyung-rai;Lee, Dong-gun;Heo, So-young
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.704-705
    • /
    • 2015
  • Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.

  • PDF

APPLICATION OF AHP IN IDENTIFYING CONSTRUCTION PRODUCTIVITY FACTORS

  • Ishwar Adhikari;Soo-Yong Kim;Young Dai Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.667-671
    • /
    • 2005
  • Analytical hierarchy process (AHP) is a potential decision making method in management that can be used in project management as well. Lack of productivity is perhaps the number one problem confronting in the construction industry. There are numerous factors which affect the productivity of a construction project, so it is necessary to find out the critical factors giving birth to productivity. In this paper, construction productivity is taken as example for the demonstration of the AHP application to find out the critical productivity factor in which the Level 1 is taken as selection of critical productivity factor, Level 2 as construction parties and Level 3 as productivity factors group. The outcome of this study is beneficial to the entire constructional professionals for applying the AHP.

  • PDF

Consideration for Solution of a Difficult Problem and Application of CM.VM in Blasting Excavation for Korea-China and Korea-Japan Sea Bottom Tunnel (한중.한일 해저터널 발파굴착의 난제해결과 CM.VM 적용에 대한 고찰)

  • Shin, Chang-Yong;Ahn, Myung-Seog;Park, Ho-Kyung
    • Explosives and Blasting
    • /
    • v.28 no.1
    • /
    • pp.71-75
    • /
    • 2010
  • A plan of construction of subsea tunnels connecting Korea-Japan and Korea-China have been discussing over the past several ten years. This paper were wrote about the present capacity of our engineer, the cooperation plan of politics and economy. Especially we examined and studied resolution method and technical problem in the construction of Sub-sea tunnel. In terms of excavation technology, Blasting and water resistance technology should be cared considering the status of rock such as fault in the deep sea. After of a construction work, it should be carefully designed and constructed for the fire and leakage management in Tunnel, It should be applied to High Construction Management Professional and Value Management(CVS) etc.

Simplified computational methodology for analysis and studies on behaviour of incrementally launched continuous bridges

  • Sasmal, Saptarshi;Ramanjaneyulu, K.;Srinivas, V.;Gopalakrishnan, S.
    • Structural Engineering and Mechanics
    • /
    • v.17 no.2
    • /
    • pp.245-266
    • /
    • 2004
  • Incremental launching method is one of the highly competitive techniques for construction of concrete bridges. It avoids costly and time consuming form work and centralizes all construction activities in a small casting yard, thus saving in cost and time against conventional bridge construction. From the quality point of view, it eliminates the uncertainty of monolithic behaviour by allowing high repetitiveness and industrial environment. But, from analysis and design point of view, the most characteristic aspect of incrementally launched bridges is that, it has to absorb the stresses associated with the temporary supports that are gradually taken on by the deck during its launch. So, it is necessary to analyse the structure for each step of launching which is a tedious and time consuming process. Effect of support settlements or temperature variation makes the problem more complex. By using transfer matrix method, this problem can be handled efficiently with minimal computational effort. This paper gives insight into method of analysis, formulation for optimization of the structural system, effect of support settlement and temperature gradient, during construction, on the stress state of incrementally launched bridges.

The Study On A Marina's Construction Location Analysis Using Integer Optimization Programming (정수최적계획법을 이용한 마리나 건설 대상지 분석에 관한 연구)

  • Pak, Seong-Hyeon;Joo, Ki-See
    • Journal of Navigation and Port Research
    • /
    • v.34 no.1
    • /
    • pp.59-64
    • /
    • 2010
  • This study is to determine an optimal marina's construction location candidate among many alternative candidates in order to obtain the maximized efficiency under the natural conditions. To deal with marina's construction location, the optimal construction location is selected using 10 important factor analysis for 10 candidates in Yeosu city. In this paper, the new model to assign the most reasonable alternative is introduced using 0-1 integer programming. This proposed model has not been applied in the optimal marina's facility candidate selection problem yet. This paper will contribute to determine the most reasonable alternative. Also, this proposal model can be applied to other marina's facility candidate selection problem in other regions.

Analysis and Countermeasures for the Problem Arise of the Spot Installation Pile Using SIP (SIP공법 시공시 문제점 발생 요인 분석 및 대응 방안)

  • Park, Jong-Hyuk;Park, Hong-Tae;Jeon, Yong-Bae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.7
    • /
    • pp.3287-3295
    • /
    • 2011
  • Currently in construction Soil-cement Injected Precast pile of buried pile method are in wide use. But deterioration in pile quality and faulty construction can be often found these days because of problems arise in the construction field. For this study, survey was carried out by targeting construction engineers working in the field in order to identify the types and the causes of problems arise based on SIP(Soil-cement Injected Precast) method. By analyzing the causes of problems arise, countermeasures could be presented. The data and the analysis presented in the study could be effectively used for minimizing problems arise in future during SIP method construction.

Modeling Of Management Decisions Of Organization Of Production Systems

  • Arutiunian, Yevhen;Mikhailutsa, Olena;Pozhuyev, Andriy;Аzhazha, Maryna;Arutiunian, Iryna;Zrybnieva, Iryna;Slyva, Yuliia
    • International Journal of Computer Science & Network Security
    • /
    • v.21 no.7
    • /
    • pp.87-92
    • /
    • 2021
  • Analysis of current state of construction industry functioning in Ukraine allows us to identify a number of problems having negative impact on sustainable development of construction industry, especially in terms of its organization. Therefore, it is absolutely essential to study existing methods of organization system supplying construction sites with necessary material resources. Companies can develop their own logistics departments, which independently solve logistics issues related to transportation organization and management, accounting and inventory management, acquisition and warehousing, intercommunication (ability to obtain both final and intermediate information during transporting materials). Using a complex of methods is substantiated: the hierarchy analysis method (Saati's method), the network method, the defect elimination algorithm DEA, the transportation problem that finds optimal problem solutions for construction sector with the purpose of rational supplying uninterrupted construction with building resources in the designed model "provider-transportation-costs".

Validity Elevation Scheme of Quality Inspection System for Defect Prevention & Management in Apartment Housing Construction (공동주택 하자예방 및 관리를 위한 품질점검제도의 실효성 제고방안 연구)

  • Park, Geun-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.06a
    • /
    • pp.220-221
    • /
    • 2020
  • Strarting with Buyeong Apartment in Dongtan-2 disrict in 2017, collective complaints of residents are frequently occurring due to low quality problem such as improper construction and defects of apartment houses. Because of this, the Ministry of Land and Transport is preparing a comprehensive improvement scheme to improve the quality of Apartment Housing(AH), taking into account the continuing complaints from the residents of AH and the problem raised by the National Assembly. The basic profile of the improvement scheme is induce the tenants and experts to discover and point out defects that are repaired until the date of use inspection or due date. For this purpose, we suggested this defects management system linkaged by the preliminary inspection and quality inspection system for prospective occupants. In this context, this paper aims to suggest an effective likage method between the preliminary inspection of prospective residents and the quality inspection system implemented by local governments as an ordinance.

  • PDF

Bearing Capacity of Geogrid-Reinforced Railroad Ballast (지오그리드로 보강된 철도노반 쇄석기층의 지지력에 관한 연구)

  • 신은철;김두환;이규진;이상조
    • Proceedings of the KSR Conference
    • /
    • 1999.05a
    • /
    • pp.367-374
    • /
    • 1999
  • The selection of geogrid types for the use of reinforced rail roadbed is important in the design of railways. Also, the problem of the construction damage on the geogrid during construction is raised by the field engineers. Therefore, laboratory model tests were peformed to investigate the efficiency of the bearing capacity and construction damage. As a result, it was found that the bearing capacity of the rigid geogrid reinforced railroad ballast shows 1.54 times higher than that of the flexible geogrid reinforced case. In addition, there were no noticeable damage during construction.

  • PDF

A Study on the Effectual Making Schemes of the Safety Assessment for the Construction Works (건설공사 유해,위험방지계획서의 효과적 작성방안에 관한 연구)

  • Choi, Jin-oo
    • Journal of the Korean Society of Safety
    • /
    • v.17 no.4
    • /
    • pp.168-172
    • /
    • 2002
  • The Safety Assessment for Construction works is used in order to make the safety plans to protect calamities in construction sites. However in Korea it is problem that the Safety Assessment has strict and meaningless contents. So it is not used well. This study suggests the effectual making methods of the Safety Assessment to solve the problems which are found through investing serious calamities and interviewing experts.