• 제목/요약/키워드: Construction problem

검색결과 3,298건 처리시간 0.032초

Development and Application of Failure-Based Learning Conceptual Model for Construction Education

  • Lee, Do-Yeop;Yoon, Cheol-Hwan;Park, Chan-Sik
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권2호
    • /
    • pp.11-17
    • /
    • 2011
  • Recent demands from construction industry have emphasized the capability for graduates to have improved skills both technical and non-technical such as problem solving, interpersonal communication. To satisfy these demands, problem-based learning that is an instructional method characterized by the use of real world problem has been adopted and has proven its effectiveness various disciplines. However, in spite of the importance of field senses and dealing with real problem, construction engineering education has generally focused on traditional lecture-oriented course. In order to improve limitations of current construction education and to satisfy recent demands from construction industry, this paper proposes a new educational approach that is Failure-Based Learning for using combination of the procedural characteristics of the problem-based learning theory in construction technology education utilizing failure information that has the educational value in the construction area by reinterpreting characteristics of construction industry and construction failure information. The major results of this study are summarized as follows. 1) Educational effect of problem-based learning methodology and limitation of application in construction area 2) The educational value of the information on construction failure and limitation in application of the information in construction sector 3) Anticipated effect from application of the failure-based learning 4) Development and application of the failure-based learning conceptual model.

DEVELOPMENT AND APPLICATION OF FAILURE-BASED LEARNING MODEL FOR CONSTRUCTION TECHNOLOGY EDUCATION

  • Do-Yeop Lee;Cheol-Hwan Yoon;Chan-Sik Park
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.99-106
    • /
    • 2011
  • Recent demands from construction industry have emphasized the capability for graduates to have improved skills both technical and non-technical such as problem solving, interpersonal communication. To satisfy these demands, problem-based learning that is an instructional method characterized by the use of real world problem has been adopted and has proven its effectiveness various disciplines. However, in spite of the importance of field senses and dealing with real problem, construction engineering education has generally focused on traditional lecture-oriented course. In order to improve limitations of current construction education and to satisfy recent demands from construction industry, this paper proposes a new educational approach that is Failure-Based Learning for using combination of the procedural characteristics of the problem-based learning theory in construction technology education utilizing failure information that has the educational value in the construction area by reinterpreting characteristics of construction industry and construction failure information. The major results of this study are summarized as follows. 1) Educational effect of problem-based learning methodology and limitation of application in construction area 2) The educational value of the information on construction failure and limitation in application of the information in construction sector 3) Anticipated effect from application of the failure-based learning 4) Development and application of the failure-based learning model

  • PDF

BASIC RESEARCH OF SUB-PACKAGE PROBLEM IN KOREAN CONSTRUCTION INDUSTRY

  • Jinho Shin;Furusaka Shuzo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.635-641
    • /
    • 2009
  • In the building construction, the specialist contractors play the important roles in the point of the quality securing. Therefore, it is very important for the construction industry to study the sub-package problem. The sub-package problem includes two problems which should be solved. One is to decide the scope of works of each specialist contractor, and another one is to decide the particular specialist contractor which carries out the work. However, the sub-package problem in Korea is not clarified yet, although the circumstance around it has changed rapidly. Many factors influence to the sub-package problem regardless of internal factors or external factors of the project. The general contractor usually decides the sub-package under considering the project conditions. In case of the internal factors, each general contractor manages the organization and materials. But the external factors are relatively more difficult to control and predict than internal ones. But out of the external factors, the legal system has very close relationship with a sub-package problem especially in Korean construction system. So, this paper clarifies relationship between the legal system relating subcontracting and the state of sub-package.

  • PDF

건설공사 추락재해의 발생장소별.피재자별 분석 (The Origins of Fall Incidents in Construction Sites Classified by Locations and Trades of Concern)

  • 이규진
    • 한국안전학회지
    • /
    • 제16권2호
    • /
    • pp.85-90
    • /
    • 2001
  • In construction industries, the problem areas in safety are different to those of manufacturing. For instance, construction safety efforts must strongly emphasize fall prevention, whereas caught-in/ between incidents and electrical shocks are common in manufacturing. This paper reports an analysis of fall incidents that lead to fatalities in 1999 and in 2000. It also provides a safety plan for fall prevention by analyzing the origins of fall incidents by their trades and locations of concern. The findings of this study are expected to contribute toward reducing fall incidents in construction industry.

  • PDF

공사비 유형의 유치권 소송에 대한 중·소기업 건설업체 사례분석 (Case Study of Small and Medium-Sized Construction Firms on the Cost Type Lien Suits)

  • 윤하정;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.137-138
    • /
    • 2011
  • Mainly in construction liens to four contractors do not receive your order is caused by construction. This construction does not receive construction compunction to protect the contractor, I guess. On the other hand, the medium and small construction companies and contractors that could threaten the order four can be a problem. In this study, small construction companies to the lien of the lien claim on the issue of case studies have looked for the study. Small construction companies, in your case through the litigation between the lien of the lien litigation perspective, the cause of four orders after the analysis step by step construction was listed in chronological order. Identifying problem was the result of a lien. This study to previous studies regarding the lien on the issue through case studies of one kind of lien was derived for the problem. A follow-up studies and more case studies and interviews are considered necessary in the study.

  • PDF

건설현장 안전사고의 작업 리스크 매트릭스 분석 (Analysis of Job Risk Matrix Exposed to Safety Accidents in Construction Field)

  • 류한국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 추계 학술논문 발표대회
    • /
    • pp.58-59
    • /
    • 2017
  • As the construction industry has been increasingly complex, aging workers, hard-working avoiding young generation, foreign workers having language problem for the past decades, delivering of construction qualified workers has been a rising problem. This misalignment between the complex jobs and the number of skilled workers will continue to be in issue that the construction industry will face for following decades. Construction field workers who are working outside in uncontrollable condition unlike manufacturing industry are exposed to easily construction safety accident. There are so many efforts to prevent and control the construction accident. However, the relationships between the construction works and construction safety accident has not been well dealt and investigated based on objective accident data except for the qualitative study through interview, delphi and so on. Therefore this study analyzes job risk matrix exposed to safety accidents based on statistic data for 20 years from Korean Occupational Safety & Health Agency in order to prevent the construction field accidents.

  • PDF

일반 롤러와 회전식 롤러를 적용한 자착형 방수시트의 물성비교 연구 (A Study On the Comparisons Between the Physical Properties of Self-Adhesive Waterproofing Sheets Applied with General Roller and Rotation Roller)

  • 안기원;박완구;김윤호;박진상;안동수;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 춘계 학술논문 발표대회
    • /
    • pp.15-18
    • /
    • 2012
  • This study is to examine general roller and rotation in using self-adhesive waterproofing sheet. Using self-adhesive waterproofing sheet is very comfortable in a waterproofing construction site. However, In mechanical construction, self-adhesive waterproofing sheet occurred that problem for using. It induce many water leakage problem. So, We make Rotation Roller for to solve the this problem, and then Comparison with Physical properties of Self-Adhesive waterproofing sheet in applied General Roller and Rotation Roller.

  • PDF

중단열 시스템의 문제점 분석 (Problem Analysis of Sandwich Insulation Wall System)

  • 박준호;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 추계 학술논문 발표대회
    • /
    • pp.166-167
    • /
    • 2015
  • Because of energy crisis at all around the world, there is many method and system which for improving energy efficiency has appeared in construction industry. And then, 20% of entire building energy loss is emissed to exterior of buildings, that is important to building's entire energy efficiency. So, many research has been conducted for imporve exterior energy efficiency and generally it called insulation of wall. Method for wall insulation can be classified interior system and exterior system which defined installation place of insulation board whether interior or exterior of structural wall. However, interior system has thermal problem such as thermal-bridge which can be necessarily occur condensation. and exterior system has constructional problem such as difficult to construction because exterior and finish work so expensive construction cost than other insulation method. Thus, sandwich insulation wall system has been appeared for solving these problems. Sandwich insulation system must using wall connecting things because both side walls is divided by center insulation. At this, Through the heat at wall connecter, it can be occured thermal-bridge and broken insulation board when under construction will be bring negative effect by reducing wall thickness and insulation deficit. At this study, we were compared previous sandwich insulation system and analysis these system's problem for develop the improving constructability and performance of sandwich insulation system.

  • PDF

공정-원가 통합관리를 위한 진도관리 개선 방안 (A Study on the Improvement of Construction Progress Management for EVMS)

  • 이규현;박찬정;최인성
    • 한국건축시공학회지
    • /
    • 제2권3호
    • /
    • pp.155-162
    • /
    • 2002
  • The Ministry of Construction-Transportation released a plan about EVMS in 1993 in order to prepare measures for an efficient public construction project, and prepared an enforcement proposal concretely in June for 2000 years, and have enforce a public project by an example with a target. Therefore, accurate analysis and evaluation about field progress are required for efficient management of a building construction, and must be established building construction management system for fast action about a problem However, unified management cannot be consisting because a work progress system is different from details estimate system within a country. and There is not still a definite standard in progress measurement for an application of EVMS. A purpose of this study is to present an improvement about a problem of progress measurement for an application of EVMS. The contents of a study, inquired into a progress measurement method and a standard to use in the field of a public construction and private construction and Checks a problem and presented an improvement item necessary for and is as follows. $\circled1$ must establishes a control account and progress measurement standard. $\circled2$ must manage progress in a activity viewpoint. $\circled3$ must use an accurate CPM process management technique.

건설공사 성능계약제도 도입방향에 관한 연구 (A Study on the Direction of the Warranty Contract in Constructions)

  • 김현;박성용;서용칠;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.153-157
    • /
    • 2008
  • The construction market has gradually become complexity, variety and specialization, and then owner's requirements about quality has become various. In order to solve the problem such as stated above, advanced constructions in United Kingdom, Japan and United States have introduced warranty contract which is warranted to quality and performance for need of owner in determined term to ensure the quality of construction since 1960s. However, the interior of a country encounter another problem result from defects liability what indefiniteness of defects standard, excess responsibility period, social recognition of be identical fraudulent work and defects, and contract with ascendancy of owners. etc, so builders concerned more excess defects liability than the quality of construction. The purpose of this study is to analysis of warranty contract in order to solve the problem such as stated above.

  • PDF