• 제목/요약/키워드: Construction planning

검색결과 2,723건 처리시간 0.029초

전시컨벤션 시설의 공간구성적 특성에 관한 연구 - 기능배분과 면적구성을 중심으로 - (A Study on Characteristics of Space Composition for Exhibition and Convention Facilities - Focused on the Function Distribution and Area Composition -)

  • 박태성
    • 한국실내디자인학회논문집
    • /
    • 제22권2호
    • /
    • pp.203-210
    • /
    • 2013
  • The purpose of this study was to investigate and analyze the function and scale on aspect of construction planning with examples of exhibition and convention facilities constructed recently in domestic and foreign area. Also, it was to provide the result for basic data for construction planning and architecture of similar facilities constructed later. The study methodles, but they had characteristics to use the space with compound purpose for exhibition, conference, etc through installing multi-purpose hall. Finally, for effective construction planning of exhibition and convention facilities, it was required to decrease the ratio of common area gradually and derive rationalization of whole space composition by deriving complexity of function rather than planning of single purpose of each facility for exhibition and conference function. was to analyze the characteristics of construction planning for composition and scale of exhibition, conference, public use, support, maintenance functions, etc and placement composition of unit rooms by each floor on the basis of internal area of exhibition and convention facility in Korea and Japan. As the result of analyzing 10 examples(K1~J5), the placement of auditorium and multi-purpose hall was affected according to location of exhibition room and conference room in the composition of unit rooms by each floor and the installment ratio of support facility in Korean examples was higher than in Japanese examples. In case of facility scale, the Japanese examples were overall small in the whole scale relatively to Korean examp.

국내 모듈러 주택의 특성 및 MC 설계를 통한 건축자재 표준화 효과 분석 (An Analysis on Architectural Characteristics of Domestic Modular Housing and Building Material Standardization Effect through MC Design)

  • 이창재;임석호
    • 한국주거학회논문집
    • /
    • 제26권6호
    • /
    • pp.103-113
    • /
    • 2015
  • Modular construction is a process in which a building is produced off-site in module boxes using standard materials. Since the introduction of prefabrication in building construction, Modular Coordination (MC) has become an essential design tool in building design and construction. However, in Korea, the design standardization has not been adequately applied to modular construction. This study intends to analyze the current status of modular construction in Korea and explore the applicability of MC design in the construction industry. The analysis of the current status of MC design within Korean four major modular construction companies indicates that an incremental dimension is not properly used in horizontal planning modules, which results in a problem of increasing construction cost by high material loss rate. But, in vertical planning modules, a incremental dimension of 100 mm (1 M) is found to be used although the structural system varies among manufacturers, which demonstrates the potential for an open system to be well applied in modular construction, despite different structural systems.

Application of BIM-integrated Construction Simulation to Construction Production Planning

  • Chang, SooWon;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.639-640
    • /
    • 2015
  • Traditional construction planning based on historical data and heuristic adjustment can no longer incorporate all the operational details and guarantee the expected performance. The variation between the expected and the actual production leads to cost overruns or delay. Although predicting reliable productivity on construction site is getting more important, the difficulty of this increases. In this regard, this paper suggested to develop BIM-integrated simulation framework. This framework could predict productivity dynamics by considering factors affecting on construction productivity at operational phase. We developed the following processes; 1) enabling a BIM model to produce input data for simulation; 2) developing the construction operation simulation; 3) running simulation using BIM data and obtaining productivity results. The BIM-integrated simulation framework was tested with structural steel erection model because steel erection work is one of the most critical process influencing on the whole construction budget and duration. We could improve to predict more dynamic productivity from this framework, and this reliable productivity helps construction managers to optimize resource allocation, increase schedule reliability, save storage cost, and reduce material loss.

  • PDF

도시건설사업과 u-City 사업 프로세스 (A study on the Processor of City construction and u-City business)

  • 유재덕;신현식
    • 한국전자통신학회논문지
    • /
    • 제4권4호
    • /
    • pp.287-292
    • /
    • 2009
  • u-City 사업은 도시개발 프로세서와 IT 사업 프로세서가 결합된 구축 프로세서로 도시개발 계획 단계에서 u-City 계획 및 설계 내역이 반영되어야 효율적으로 구축이 가능하며, 비용 절감을 할 수 있다. 본고에서는 도시개발 프로세서와 u-City 사업 프로세서 간 연계방안을 제시하고 각 단계별 주요업무를 설정하여 제시하였으며, 특히 도시개발 프로세서와 연계한 u-City 사업을 성공적으로 이끌기 위한 단계별 핵심 업무 중 USP(u-City Strategic Planning)수립 방안들에 대하여 고찰하고자 한다.

  • PDF

Case Study : BIM for Planning, Simulating, and Implementing Complex Site Logistics

  • Kim, JongHoon;Cohen, Fernando Castillo
    • 한국BIM학회 논문집
    • /
    • 제5권4호
    • /
    • pp.47-52
    • /
    • 2015
  • This paper presents a case study using Building Information Modeling (BIM) for planning, simulating, and implementing complex site logistics in a headquarter office building construction project in Silver Spring, MD. As part of the project a prefabricated 92ft structural tube steel pedestrian connector bridge was installed between two adjacent buildings in the city of Silver Spring, MD. There were multiple significant challenges to deliver, offload, prepare, and install the connector bridge safely, on time, and with the minimum disturbances to the neighbors. BIM was of the foremost importance to visualize, simulate, analyze, improve, and communicate the site logistics plan from delivery to installation of the connector bridge. As a result of the effort, GC of the project was able to prepare a highly detailed plan, communicate it effectively to all stakeholders, and flawlessly execute the work as planned. This case study would provide a useful reference for contractors who are seeking a better planning method that enables generation of more accurate, implementable, optimized plans for complex site logistics.

Government's Roles in Public Private Partnership Toll Road Projects

  • Rohman, Mohammad Arif;Doloi, Hemanta;Heywood, Christopher
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.381-385
    • /
    • 2015
  • This research aims to investigate critical factors of the government's role in achieving success in Public Private Partnership (PPP) toll road projects in Indonesia according to government and private sectors' perceptions. A preliminary interview Subsequently a questionnaire survey was also conducted involving 143 respondents across the two sectors from eight operating toll were five critical factors of the government's roles in achieving success in PPP toll road projects, namely; "Active involvement in overall project stage activities", "Establishment of good bureaucracy", "Provision of conducive environment", "Appropriate project planning and competitive tendering" and "Provision of appropriate government support and supervision". This research finding is expected to assist the government in defining clear roles and underlying responsibilities in development of PPP toll roads in Indonesia.

  • PDF

제도와 정책에 따른 노인복지시설의 건축계획 방향 (Architectural Planning of Elderly Facilities with the Institution and Policy)

  • 남윤철
    • 한국디지털건축인테리어학회논문집
    • /
    • 제13권3호
    • /
    • pp.25-32
    • /
    • 2013
  • The elderly in South Korea in 2012 to 11.8% now aging fast-paced world, which is older than most countries. That is, as long as the elderly people lack the time to respond on the issue could cause many problems. According to the principle of social solidarity, long-term care insurance was introduced for the elderly since July 2008 and facility and sanction salaries were supported for the level 1 (the most serious illness) - level 3 (serious illness) elderly. On the other hand, in the fields of architecture, it is difficult to receive the contents of the unified related articles when the design and construction of the elderly welfare facilities take propel commissioned. This paper not only presents the elderly welfare facilities operated according to the institution and policy of elderly welfare facilities in terms of architecture, but also provides the criteria summarized by building facilities in the field of construction of elderly welfare facilities planning, planning, design is intended to provide basic information. This study addresses are as follows: First, the aging population of South Korea and welfare facilities for the elderly are addressed. Second, in terms of architecture, the institution and policy of elderly welfare facilities in South Korea, are addressed. Third, the construction criteria of elderly welfare facilities is summarized to help architectural practitioners understand. Fourth, the future direction of the architectural design of welfare facilities for the elderly is presented.

퍼지추론 기반 멀티 에이전트를 통한 리모델링 사업 전 추진단계에서의 갈등관리 (Conflict Management in Planning phase of Remodeling Project through Multi-Agent based on Fuzzy Inference.)

  • 박지은;유정호
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2015년도 춘계 학술논문 발표대회
    • /
    • pp.202-203
    • /
    • 2015
  • To promote the remodeling project it is important to get apartment residents' consent. It is significant variable to determine project to progress smoothly from planning stage which committee of association establishment sets up to establishment stage of association. On average, it takes about 1~1.6 year in planning phase which means before construction phase of remodeling. Therefore, it is very important issue to get apartment residents' consent in planning phase. In this research, we focused on residents' opinion and proposed solution of conflict with gathering residents' opinion to proceed remodeling project. By setting particular remodeling situation, related residents represented as agents made effort to efficient coordination to reduce total duration of decision making. Therefore, we proposed multi-agent based on fuzzy inference to simulate behavior of decision making on remodeling project effectively. From this method, optimal alternative is selected by considering each agents' attributes which represented by fuzzy set. This research will develope to further research for realizing concrete multi-agent based on fuzzy inference considering all stakeholders in remodeling project.

  • PDF

기술경영(MOT) 기반의 건설기술부문 최적화 기획 및 통합관리 시스템 구축에 대한 연구 (Management of Technology(MOT)-based Optimization Technology Sector Planning and the Construction of an Integrated Management System for Building Research)

  • 김대건;정신영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.190-191
    • /
    • 2014
  • Recent construction sector integration and fusion technologies in various areas of research and planning systemis being maintained by the system. Past experience of conservative management in this emerging technology-driven business management through the convergence of various technologies and to find synergies to secure the future of construction technology because it is a need. The purpose of this study is builton the basis of technical and Technology Management Contact optimized system for integrated management of the area you want to build.

  • PDF

한국 건설기계산업의 발전전략에 관한 연구 (A Study on Development Strategies of the Construction Machinery Industry in Korea)

  • 윤재웅
    • 한국건설관리학회논문집
    • /
    • 제7권2호
    • /
    • pp.148-161
    • /
    • 2006
  • 본 연구는 전략기획의 관점에서 국내외적 환경요인에 대한 SWOT분석과 델파이조사를 통해 한국 건설기계산업의 현 위상과 당면과제를 살펴보고 전략적 쟁점을 도출하고자 한다. 이와 함께 SWOT분석 등을 통해 도출된 전략적 쟁점을 해결하기 위한 건설기계산업의 발전적인 정책대안을 제시함으로써 한국 건설기계산업의 국제경쟁력 제고와 안정적인 성장을 유지하고자 한다.