• Title/Summary/Keyword: Construction phases

Search Result 428, Processing Time 0.025 seconds

State of the Art of Virtual Construction System based on 3D Object for Design Phase (설계단계 활용을 위한 3D객체기반 가상건설시스템 개발 현황)

  • Ji, Sang-Bok;Kang, Leen-Seok;Bae, Cheol-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.68-73
    • /
    • 2008
  • Recently, construction management technology based on information technology is being changed from numerical information management to visual information management with virtual reality (VR) method. This study suggests a IDEF0 model for development process of VR system for the planning, design and construction phases of civil engineering project. And the simulation functions by each phase based on VR were developed by using the suggested IDEF0 model. The developed virtual construction system can be used as an effective design review tool by visualization of design information based on 3D object.

  • PDF

Theme Trail District Planning for the Regional Activation -Case study on project of Trail construction each of the government agencies- (지역 활성화를 위한 테마길 조성 방안 -부처별 길 만들기 사업을 중심으로-)

  • Kim, Sang-Bum;Choi, Ja-Un;Jeong, Dae-Young;Kim, Eun-Ja
    • Journal of Agricultural Extension & Community Development
    • /
    • v.17 no.3
    • /
    • pp.587-606
    • /
    • 2010
  • Theme trail construction should be changed from existing form which connects line to line, or point to line. It should be developed into area form. The project of Trail construction must be converted in area form. The aggregate of the points which is a base element of walk is a line, and the harmonious connection of various line is the area. The close relationship with points and lines is important to operate the project of trail construction in area form effectively. Subject of the project of Theme trail construction of area form must become the village residents which are being contiguous in trail. They must operate management and about trail. The project of Trail construction of area form the plan making is established and if the subjects which, will operate and manage that place are decided upon according to theme must construct the trail of the wide area concept which connects the trail of that trail and neighborhood. If becomes like that local resident and the citizen will be able to coexist with mediation of Trail. If the project of Trail construction of village resident leading is propelled applying rural amenity resources in a way, the trail model which one phases advances could be presented for ecological, economical and cultural.

TOTAL RISK INDEX FOR ASSESSING RISK LEVELS OF OVERSEAS CONSTRUCTION PROJECTS

  • Du Yon Kim;Seung Heon Han;Heedae Park
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1414-1418
    • /
    • 2009
  • International construction projects typically manifest difficult, complex, and varied types of risk exposures; because of this, there is a need for accurate evaluation of risk-integrated performances during the timeframe of project execution. Given the financial crisis currently affecting the world economy recession, risk management has become a more crucial part for the success of international project management. However, the majority of risk management approaches, particularly for overseas projects, are focused primarily on simple forms of checklists, formalization of risk variables affecting project performance for a specific phase, or more complicated computational methods that restricting practical utilization in real-world projects; moreover, these methods lack the conceptual basis to broadly visualize the level of risk over all phases of a project. This study suggests an efficient, yet simple risk-integrated total index to successfully assess the risk levels of overseas construction projects. To this end, this paper first investigates the life cycles and key processes of decision-making for a given project and then derives formulas to represent the total risk index (TRI) along the key decision-making processes. In addition, the study examines the relationships between TRI and performance levels based on the analysis of 126 real-world project samples. Validations using the proposed TRI showed a high correlation to project performance, signifying the usefulness of the proposed approach for construction firms when investigating the level of risks and key areas for management focus.

  • PDF

KNOTWORKING - A NOVEL BIM-BASED COLLABORATION PRACTICE IN BUILDING DESIGN PROJECTS

  • Hannele Kerosuo;Tarja Maki;Jenni Korpela
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.80-86
    • /
    • 2013
  • Knotworking represents a distributed collaborative expertise in pursuit of a task that is organized among designers from different design disciplines. Construction processes involve phases and tasks that cannot be solved in one organization only, as integration of expert knowledge from various sources is needed. Through knotworking, groups of people, tasks and tools are set to work intensively for a short period of time to solve a problem or accomplish a task. Knotworking requires intensive collaboration across organizational boundaries and hierarchies. The practice of knotworking has been developed and applied in the development of healthcare organizations, libraries and school-university relationships, but it has not previously been applied in the construction industry. In this paper, we describe the concept of knotworking and the findings of a case study that we completed in the Finnish construction industry. We will also compare the similarities and differences of the Big Room and knotworking in terms of participants, duration, target, space/infrastructure, benefits and challenges. Finally, we present some suggestions for further research and experimentation on knotworking in construction projects.

  • PDF

Database Design for the Automatic Distribution System (배전 자동화 시스템을 위한 데이타베이스 설계)

  • Kim, Sang-Wook;Kim, Kwang-Ho
    • Proceedings of the KIEE Conference
    • /
    • 1997.07c
    • /
    • pp.754-757
    • /
    • 1997
  • Effective design of a database is essential for operating application systems efficiently. This Paper discusses database design for the automatic distribution system. Database design is a complex Process for specifying the structure of information and is decomposed in three Phases: conceptual, logical, and Physical design. In this paper, we first collect and analyze the requirements for the automatic distribution system, our target application. We also perform database design for these requirements through three design Phases. We believe that our results would contribute to the effective construction of a database for the automatic distribution system.

  • PDF

Investigation on the 3-D design guidelines of structures (구조물의 3차원 설계 패러다임을 위한 지침에 대한 고찰)

  • Shim, Chang-Su;Kim, Yong-Han;Jeon, Seung-Min;Kwak, Tae-Young
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2007.04a
    • /
    • pp.301-306
    • /
    • 2007
  • Design of civil infrastructures is generally based on 2-D drawings and analyses. Design provisions also specify the limit states using member based equations. Most construction projects are done through collaboration of engineers who have different specialized knowledge. Information technologies can dramatically enhance the performance of the collaboration. For the information transfer, we need a mediator between engineers. Object based 3-D models are useful for the communication and for the owners who have to maintain whole the information of infrastructures. In this paper, basic guidelines for the 3-D design according to design phases. Adequate interoperability of 3-D objects from any CAD system is essential for the collaboration. Owners, contractors and design consultants were considered as users of 3-D objects. Cost and performance of each design phases was investigated through the existing data.

  • PDF

Three-Phase Database Design for a Geographic Information System (지리(地理) 정보(情報) 시스템을 위한 삼단계(三段階) 데이터베이스 설계(設計))

  • Ock, Han-Suk;Kim, Gap-Youl;Kim, Chang-Hwan;Kim, Sang-Wook;Shin, Jae-Ho;Yang, Jae-Ung
    • Journal of Industrial Technology
    • /
    • v.18
    • /
    • pp.343-353
    • /
    • 1998
  • Effective design of a database is essential for operating application systems efficiently. This paper discusses database design for a geographic information system. This goals of database design are multiple: to satisfy the information content requirements of the specified users and applications; to provide a natural and easy-to-understand structuring of the information; and to support processing requirements and any performance objectives such as response time, processing time, and storage space. Database design is a very complex process and is decomposed in three phases: conceptual, logical, and physical design. In this paper, we first collect and analyze the requirements for a geographic information system. We also perform database design for these requirements through the three design phases systematically. Our results would contribute to the effective construction of a database for a geographic information system.

  • PDF

Verification of the Entire Process Model through Green Remodeling Pilot Project (그린리모델링 실증 시범사업을 통한 프로세스의 전 과정에 대한 검토)

  • Jeong, Jin-Woo;Ju, Jung-Hoon;Lee, Keon-Ho
    • Journal of the Korean Solar Energy Society
    • /
    • v.38 no.3
    • /
    • pp.37-45
    • /
    • 2018
  • The purpose of this study is to review all phases of the pilot project through the implementation of the Green Remodeling process. The Green Remodeling process was developed to facilitate anyone's ease of use. The Green Remodeling process consists of five phases : project, plan, design, construction, operation and maintenance. Each stage simulation was performed and the energy saving was predicted. Architects can easily obtain energy information of a building. In this study, we propose a green remodeling proposal plan through pilot project. Ultimately, the spread of green remodeling will greatly contribute to achieving the goal of reducing greenhouse gas emissions.

Study on mechanical behaviors of cable-supported ribbed beam composite slab structure during construction phase

  • Qiao, W.T.;An, Q.;Wang, D.;Zhao, M.S.
    • Steel and Composite Structures
    • /
    • v.21 no.1
    • /
    • pp.177-194
    • /
    • 2016
  • The cable-supported ribbed beam composite slab structure (CBS) is a new type of pre-stressed hybrid structure. The standard construction method of CBS including five steps and two key phases are proposed in this paper. The theoretical analysis and experimental research on a 1:5 scaled model were carried out. First, the tensioning construction method based on deformation control was applied to pre-stress the cables. The research results indicate that the actual tensile force applied to the cable is slightly larger than the theoretical value, and the error is about 6.8%. Subsequently, three support dismantling schemes are discussed. Scheme one indicates that each span of CBS has certain level of mechanical independence such that the construction of a span is not significantly affected by the adjacent spans. It is shown that dismantling from the middle to the ends is an optimal support dismantling method. The experimental research also indicates that by using this method, the CBS behaves identically with the numerical analysis results during the construction and service.

Analysis and Reduction for Risk factors of Construction Projects (건설공사의 리스크인자 분석 및 경감에 관한 연구)

  • Chung Byoung-Hwa;Chung Young-Shik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.62-68
    • /
    • 2001
  • The purpose of this study was to Identification the Risk of construction method to protect and reduce of construction period. Risk management is one of the key project management process. Numerous tools are available to support the various phases of the risk management process. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and with effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are more likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.

  • PDF