• Title/Summary/Keyword: Construction operation phase

Search Result 183, Processing Time 0.022 seconds

Management of RAMS for Railway System in view of System Life Cycle (시스템 수명주기 관점에서의 철도시스템 RAMS 관리 방안)

  • Lee, Chang-Hwan;Park, Byoung-Noh;Ahn, Heon-Chan
    • Proceedings of the KSR Conference
    • /
    • 2011.05a
    • /
    • pp.221-225
    • /
    • 2011
  • The railway system consists of many items such as sub-systems, equipments and parts to accomplish the required function. Also the railway system is very complex system that these items are connected with interface among items. According with this complexity, the process of system engineering is applied to the construction of new railway project to manage systematically. In addition, the research about system engineering is progressing in recent. The RAMS management is one part of system engineering, and is to assure the required safety and performance. Also, this RAMS should be managed through system life cycle. This paper show the case study of management of RAMS during construction and operation phase in respect of system life cycle. As a result of this research, the best way of RAMS management based on system engineering in operation phase for railway system is suggested.

  • PDF

Regional Production, Income and Employment Impact of Nuclear Power Plant (원자력발전소(原子力發電所)가 지역(地域)의 생산(生産), 소득(所得)과 고용(雇傭)에 미치는 효과(效果) 분석(分析))

  • Shin, Yong-In;Yang, Kwang-Nam
    • Korean Journal of Agricultural Science
    • /
    • v.23 no.2
    • /
    • pp.272-284
    • /
    • 1996
  • The present study has quantitatively assessed the regional production, income and employment impact resulting from the construction and operation of nuclear power plant (NPP) upon the domestic local areas by applying the regional input-output analysis model to the case of Wolsong unit-l site. The conclusions regarding the most likely regional economic impacts upon the wolsong site are summarized as follows: 1. The income multipliers are calculated to be 1.563 for the construction phase and 1.500 for the operation phase. These values are relatively high compared with those of other conventional facilities. 2. The level of total employee's wage induced employment associated with the construction phase has been estimated to be 37,000 while that with the operational phase in 1990 to be 5,610. 3. With relation to the aspect of resident welfare it is found that the industrial sector associated with electricity, gas and water supply have remarkably improved with the construction of the NPP. 4. The NPP siting has induced substantial changes in interindustry (input-output) structures of the Wolsong unit-l site which is one of the rural areas where all the domestic NPPs are sited. Such changes are attributed to the industrial recomposition of the region. 5. With the application of other regional economic analysis models and the use of more sufficient regional data, other detailed studies on the economic impact analysis of domestic NPP-related facility sitings are suggested to be carried out further since the influence of NPP sitings is significant to the national economic impact as well as the regional economic impact.

  • PDF

A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

Toward the Future of Mechanized Construction Introduction and Future Prospects of Mechanized Constructions Using Digital Information

  • Makoto Kayashima;Yuusuke Noguchi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.87-102
    • /
    • 2022
  • In Japan, the population progresses to the extreme aging society and it is entering the phase of the population decrease while the population increase is continuing in the world. The construction market is expected to shrink accordingly, however the situation of labor shortage is expected to continue at a faster rate, because the aging of construction workers is progressing and new younger labor force cannot be secured. In order to supplement the labor shortage, it is required to progress mechanization, automation, labor saving, and efficiency improvement by utilizing the information well in each stage in a series of flow of planning, design, construction, operation, and disassembly in one building. The measures to maintain and expand the construction market by the new efficiency improvement techniques which enhance the utilization degree of building information are required. Currently, the elemental technologies which utilized BIM (Building Information Modeling) are accumulated by advancing digitization in each phase. DX (Digital transformation) in the construction industry can be achieved by the technology maturing and having a series of continuities. It is anticipated that this will evolve to a new method which is unprecedented. Present status of BIM and mechanized constructions in Taisei Construction are introduced, and future prospect is described.

Experimental Study of Cooling Energy Saving Verification Using Blinds and Phase Change Material(PCM) (창호 블라인드와 상변화물질 적용에 의한 냉방 에너지 사용량 절감효과에 대한 검토 연구)

  • Song, Young-Hak;Kim, Ki-Tae;Koo, Bo-Kyung;Lee, Keon-Ho
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.26 no.1
    • /
    • pp.26-31
    • /
    • 2014
  • This study looks into changing building energy use by application of phase change material (PCM). PCM does not need extra energy for operation and is used for reducing building energy use and, CO2 output by displaying semi-permanent effects after installation. It also is able to avoid the maximum electric power time-zone by inducing a time lag phenomenon of cooling and heating loads with high thermal capacity using latent heat. To verify the efficiency of blinds and PCM, tests about the PCM operation mechanism using air conditioning machinery and nocturnal panel cooling were done. In the test results of the case using PCM installation, a $45^{\circ}$ blind angle with machinery air conditioning and nocturnal panel cooling at the same time shows a 22 percent energy saving effect against general space. The test results of each case were compared and analyzed based on the blind and window opening settings. Finally, the energy reduction of existing buildings using PCM application was reviewed based on the final measurement results.

Lifting Load Recording and Management Method of the Lift for Construction Based Sensing Information

  • Taekyu Ko;Joonghwan Shin;Kyuhyup Lee;Soonwook Kwon;Chung-Suk Cho;Suwan Chung;Goeun ,Choi
    • International Journal of High-Rise Buildings
    • /
    • v.11 no.2
    • /
    • pp.125-135
    • /
    • 2022
  • While buildings in recent days become taller and larger, many problems occur during the management of construction. Particularly, as the vertical movement of manpower and materials during construction has become longer while the lifting frequency and load increase, the need for a good lifting management practice is also increasing. Therefore, this study presents a real-time lifting performance monitoring system that can store and manage lifting records for construction management. Through review of literature and preceding studies related to construction lift, the concept of lift planning and operation management was understood, leading to the development of a system to monitor lifting operation and performance information. This system enabled quick measurement of the lifting performance during construction phase while responding to changes in the project schedule. To verify this system, a case study was conducted in which the current status and characteristics of the sensing-based lifting performance were derived.

A study on the status and improvement of construction management in Gwangjin-Gu Culture & Sports Center (광진구민회관의 건설사업관리 적용현황과 개선방향에 관한 연구)

  • Jung Jae-Jin;Yoo Byeong-Gi
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.32-39
    • /
    • 2003
  • Owners, local autonumous entities, have a burden on operating project for the lack of their management capacity such as specialty and human resources. In this reason, they want to perform project with CM methods. But there have been only a few case of CM operation and application in a huge construction project. The complex formations of CM and responsible management are used in those project. This situation originates in the lack of CM specialist. Because the CM service used in those case is generally performed as the mixture of responsible management service and design management service, it is not the prototype of CM. The purposes of this study are to present the solutions to the problems concerned with the design development phase management, design phase VE, the application of Fast-Track, PMIS operation and CM execution, etc, and establish the plan to perform CM services efficiently in the public sector through analyzing the case of CM application in Gwangjin-Gu Culture & Sports Center.

  • PDF

Development of Standard Activity Model for Small and Medium sized Plant: Focused on Detailed Design Phase (중소형 플랜트의 표준화된 플랜트 엔지니어링 활동 모델 개발: 상세설계를 중심으로)

  • Shin, Jung Uk;Yeom, Choong Sub
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.14 no.1
    • /
    • pp.13-18
    • /
    • 2018
  • Plant Engineering is a series of activities going through following life cycle phases: planning, basic design, detailed design, procurement and construction, commissioning, operation and maintenance, to produce a target product. From among these phases of plant engineering life cycle, a detailed design phase is an important phase producing final design deliveries. Luckily, through technical co-operation and experiences of constructing plants, large Korean engineering companies have accumulated know-hows of efficient detailed designs. However, smaller engineering companies have less experience of performing detailed designs so there is always a risk of causing design errors in the detailed design phase. To mitigate the risk of design errors in the detailed design phase, it is necessary to systematize a concrete activity model of a detailed design phase. In this paper, we have developed a prototype of a detailed design activity model through a widely used function modeling methodology called IDEF0.

Individual Factors Influence on Client Involvement: the Case Construction Projects in Saudi Arabia

  • Trigunarsyah, Bambang;Al-Solaiman, Sultan
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.578-582
    • /
    • 2015
  • Lack of client involvement in construction of public projects has been identified as the main cause of many operational problems. Clients need to perform their roles and responsibilities effectively and efficiently at the right time and through the use of correct methods in order to have the optimum involvement required during all the construction project phases, namely, the planning, design, construction, handover, and operation and maintenance phase. This paper investigates the influence of clients' individual factors on their involvement in construction project delivery. A questionnaire survey was distributed to various government agencies of the Kingdom of Saudi Arabia (KSA). Explanatory Factory Analysis was performed to group nineteen individual factors. The factor analysis result suggests that the individual factors that can involve clients' involvement in construction projects can be grouped into five, which are: adequacy of knowledge and experience for decision making in the early stage of design; ability to communicate clearly; job satisfaction; personal skills; and expertise in design and construction.

  • PDF

Front End Engineering and Design (FEED) for Project Management of Thermal Power Plant Construction

  • KIM, Namjoon;JUNG, Youngsoo
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.415-419
    • /
    • 2015
  • Engineering is a value-adding process applying knowledge and skills in the construction industry that includes the planning, feasibility study, project management (PM), front end engineering and design (FEED), detail design, procurement, construction, supervision, and operation. Among these engineering activities, FEED is defined as a comprehensive design practice in the early design phase focused on conceptual design and basic design. It is a particularly influencing area that determines the competitiveness of procurement and construction capability of construction firms (KNIN 2013). Nevertheless, previous studies in FEED have been limited to the design process, deliverable, or particular management technique (e.g. system engineering, collaboration, information etc.). In this context, the purpose of this study is to propose a comprehensive FEED business process structure for project management of thermal power plant construction projects encompassing the entire project life cycle. And an assessment methodology for FEED functions was developed. It is expected that the proposed structure of FEED functions and FEED evaluation methodology will contribute to improvement of competitive capability of engineering, procurement, and construction (EPC) companies.

  • PDF