• Title/Summary/Keyword: Construction of structures

Search Result 4,836, Processing Time 0.031 seconds

Study on the Safety Assurance for the Temporary Structures (가설구조물 안전성 확보 방안 연구)

  • Lee, Jung Seok;Moon, Seong Oh;Youn, Ye Bin;Lim, Nam Gi;Oh, Tae Keun
    • Journal of the Korean Society of Safety
    • /
    • v.33 no.1
    • /
    • pp.73-80
    • /
    • 2018
  • According to the statistics publication of KOSHA, more than half of serious accidents at the construction sites were related to the temporary works and/or the temporary structures such as scaffoldings, shores, earth retaining walls, etc. The structural failures are occurred because of the overload acting on the structures or lack of performance of the one or more members of the structures. For the prevention of the collapse accidents relating to the temporary structures at the construction sites, we have to control construction processes not to occur the overload and also to control the performance and quality of each member of the temporary structures. MOLIT has amended the "Construction Technology Promotion Act" on Jan. 7th, 2015 to ensure the structural safety of the temporary structures. According to the Act, the designers of the construction design projects should check the structural integrity of the structures including the temporary structures and the construction companies have to let 'the Relative Professionals' confirm the structural integrity of temporary structures, the shores(${\geq}5m$ high) and the scaffolds(${\geq}31m$ high), before construction. Also, MOLIT has amended the "Regulation for Construction Technology Promotion Act" on Jul. 4th, 2016 for quality management and testing of temporary equipments. According th this regulation, the construction companies and supervisors should manage and test the temporary equipments before using them. In this paper, the standard drawings of the shores(< 5 m high) and the scaffolds(< 31 m high) and the amended "Business Guideline for Quality Management of Construction Work" are presented. As the result of this study, MOLIT noticed the amended "Business Guideline for Quality Management of Construction Work" on Jul. 1st, 2017.

Mechanical Behavior of Construction Joints in Reinforced Concrete Structures Filled Internally with Cement Pastes (내부그라우팅으로 미세균열이 보수된 철근콘크리트 시공이음부의 역학적 특성에 관한 연구)

  • Oh, Byung-Hwan;Kim, Se-Hoon;Lee, Keun-Hee
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.1
    • /
    • pp.217-225
    • /
    • 2003
  • Grouting internally with grout materials can repair the micro-cracks and micro-voids of construction joints more efficiently than injecting grouts from the surface of cracks. A new internal grouting method using perforated bundled-cables was developed in this study to enhance the structural integrity of the construction joints. The extensive experiments were performed to examine the mechanical behavior of construction joints which are repaired internally by the developed method. The tests were conducted for rectangular-shaped box wall structures and straight wall structures. The strength and permeability tests at grouted construction joints were conducted to evaluate the structural behavior of repaired construction joints. The present study indicates that the internal grouting method developed in this study enhances greatly the performance of construction joints and may be efficiently used for the leak-tight integrity of construction joints in concrete structures.

Construction Techniques for Crack Control of Underground Box Structures (지하철 박스 구조물의 수화열 해석 및 온도균열 제어 방안)

  • 차수원
    • Journal of the Korean Society of Safety
    • /
    • v.16 no.4
    • /
    • pp.153-159
    • /
    • 2001
  • Recently, the underground reinforced concrete(RC) box structures have been increasingly built in Korea. In such structures, the heat of hydration may cause serious cracking problems. The RC box structures are classified in this category that needs much attention to control the hydration heat during construction, which causes the restraining effects on the boundaries. The purpose of the present study is to develop the rational construction method to control the thermal cracking problem of the box structures. In this study, the causes and mechanism of thermal cracking according to construction stages in the RC box structures are thoroughly analyzed. The major influencing variables are studied through the finite element analysis which affect the thermal cracking of RC box structures. The research results of the present study can be efficiently used for the control of cracking of box structures during construction stages.

  • PDF

Investigation of Field Construction and Economic Efficiency for Steel Plate-Concrete Structures with Application of Parking Building

  • Han, Kwon-Gyu;Park, Ho-Young;Han, Kyung-Bo;Choi, Byong-Jeong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.1
    • /
    • pp.1-10
    • /
    • 2014
  • The SC structure can have relatively liberal sectional surfaces, and allows modularization for pre-forming in factories and structural stability. It can be used for the shear walls in the core of general buildings or the structural members for parking buildings. In the future, it could be applied to moving large bus terminals, and widely used for general industrial structures as it can expedite the process compared to other methods. This study examined the applicability of SC structures to the retaining walls of a parking building and reviewed its economic value by comparing its construction term, quality control benefits, and cost compared to RC structures. It was found that SC structures are about 1.6-1.7 times more expensive than RC structures in terms of the cost of fabrication and installation. However, the construction term can be reduced by 27% to save indirect costs for constructors, as well as the cost of removing molds and material loss required when installing RC structures.

Nonlinear time-varying analysis algorithms for modeling the behavior of complex rigid long-span steel structures during construction processes

  • Tian, Li-Min;Hao, Ji-Ping
    • Steel and Composite Structures
    • /
    • v.18 no.5
    • /
    • pp.1197-1214
    • /
    • 2015
  • There is a great difference in mechanical behavior between design model one-time loading and step-by-step construction process. This paper presents practical computational methods for simulating the structural behavior of long-span rigid steel structures during construction processes. It introduces the positioning principle of node rectification for installation which is especially suitable for rigid long-span steel structures. Novel improved nonlinear analytical methods, known as element birth and death of node rectification, are introduced based on several calculating methods, as well as a forward iteration of node rectification method. These methods proposed in this paper can solve the problem of element's 'floating' and can be easily incorporated in commercial finite element software. These proposed methods were eventually implemented in the computer simulation and analysis of the main stadium for the Universiade Sports Center during the construction process. The optimum construction scheme of the structure is determined by the improved algorithm and the computational results matched well with the measured values in the project, thus indicating that the novel nonlinear time-varying analysis approach is effective construction simulation of complex rigid long-span steel structures and provides useful reference for future design and construction.

Analysis on Durability Performance Enhancement and Economical Efficiency through Chloride Protection for Concrete Structures (콘크리트 구조물의 염해도장을 통한 내구성능 향상 및 경제적 효과분석)

  • Chai, Won-Kyu;Kim, Seong-Heon;Son, Young-Hyun;Park, Ju-Won;Lee, Cheung-Bin
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.6
    • /
    • pp.155-160
    • /
    • 2010
  • In this study, detailed assessment for durability performance were performed on the chloride protected concrete structures to investigate the effectiveness of chloride protection. And economical efficiency for the chloride protected concrete structures were studied by LCC(Life Cycle Cost) analysis. In the comparison result of the first section repair time, it was found that the chloride protected concrete structures was economical better than the non-protected concrete structures in the long term. According to the analysis result of the accumulated chloride concentration by used time and chloride ion concentration by depth, it can be seen that the permeation through time from chloride has increased two times in the chloride protected concrete structures.

The Case Study on the Erection Method of Large Span Structures (대공간 건축물 Erection 공법에 관한 사례 조사 연구)

  • Jung, Hwan-Mok;Lee, Seong-Yeun;Jee, Suck-Won
    • Journal of Korean Association for Spatial Structures
    • /
    • v.7 no.2 s.24
    • /
    • pp.97-104
    • /
    • 2007
  • Recently, the demand of the large span structures has been increasing. The large span structures include such a large scaled structures such as: the shell structure, the space frame structure, the membrane structure and the cable structure, etc. The large span structures are supposed to be confirmed and issued carefully at the initial process of the design besides the construction engineering aspects because of the structural specific cause that should solve and accomodate those large and wide space without columns. In the field of the large span structure construction, the erection construction method has been regarded as a major affected aspects on the construction cost, construction term, and stability. In the field of the large span structure construction, there are various construction method and system could be applied depends on the condition of the construction site and other circumstances such a major construction method as: the element method, the block method, the sliding method, the lift-up method and complexed method, etc. In this study, as the case study of the erection construction method of the large span structures, after survey and study that those existing large span structures construction cases which had applied and adopted the election construction method and analysis and classify into the Uoups by the size, span, ceiling height, structural system in odor to supply and suggest the data for the enhancement and development in the field of the erection construction method as a efficient structural solution of the large span structure construction.

  • PDF

Design Optimization of Nuclear Power Plant Structures with High-Strength Reinforcements (원전구조물의 고강도철근 설계 최적화 방안)

  • Lee, Byung Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.137-138
    • /
    • 2017
  • Generally, a lot of reinforcements are used in nuclear power plant concrete structures in order to improve the structural safety, but it may cause several potential problems due to the overcrowded reinforcement, such as the degradation of concrete quality, the construction delay and the increase of construction cost. In order to resolve these problems, structural test researches and code change studies on using high-strength reinforcement (Gr.80) in unclear power plant structures are under way, and there is good progress in code change of ASM BPVC.III.2 and ACI 349. This purpose of this study is to review the code change status ASM BPVC.III.2, ACI 349 under way to use the high-strength reinforcement in nuclear power plant structures. Also I will introduce the design optimization of NPP structures with high-strength reinforcements in order to maximize the effect and minimize the problem when using the high-strength reinforcements in NPP structures.

  • PDF

Development of Waterproofing Method to Improve the Leakage Resistance and Maintenance of Underground Structures (구조물 누수 저항 및 유지관리 향상을 위한 방수공법 개발)

  • Kim, Eun-seok;Park, Hyun-Jung;Lee, Dong-Oun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2020.11a
    • /
    • pp.50-51
    • /
    • 2020
  • Recently, various maintenance materials and construction methods have been developed to secure the sustainable performance of structures. However, waterproofing of underground structures where groundwater infiltration is present is very difficult. In particular, the location of underground structures such as subways is very deep, and it is difficult to apply waterproof materials and construction methods in the case of structures accompanied by vibration. Therefore, we intend to study materials and methods for waterproofing leakage resistance in special environments such as underground structures.

  • PDF

Safety Assessment to Construction Position of Constructed Steel Structures under Declinating Earth Pressure (편토압을 받는 파형강판 구조물의 시공위치별 안전성 평가)

  • Lee, Sang-Hyun;Lim, Heui-Dae
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.1
    • /
    • pp.28-34
    • /
    • 2008
  • The corrugated steel plate structures is applied to the construction of mountain tunnel portal part with shallow depth, the tunnel on the outskirts of urban areas and ecology move passage. In this study, A finite element method is used for research the behavior of corrugated steel plate structures due to construction position under declinating earth pressure and excavation depth. A finite element method were performed varying construction position(10, 15, 20 and 25m) from slope and excavation depth from surface. The hoop thrust and moment, displacement of corrugated steel plate subjected to construction position and excavation depth is determined from a finite element method. From results of finite element method, it was found that the increase of thrust and the decrease of displacement as the amount of distance increase from slope with construction position. But the thrust and moment, displacement has not different value with excavation depth.