Proceedings of the Korean Institute Of Construction Engineering and Management
/
2008.11a
/
pp.525-530
/
2008
Construction industry is based on receiving an order. So, it has a special feature that market and manufacture activity is formed by a user. For this reason, it has a great influence on other industry compare construction industry with other industry. Specially when build public structure as infrastructure, importance of owner is emphasized then private construction because the primary role of owner have a great effect on national finance. Inspite of that, the importance of a faculty and role of an owner and an ordering organ, it is weak that a study about objective and meaningful evaluation of the specially, common standard and ability of public ordering organ as a major user of domestic construction industry. So, this study define the evaluation sphere and an element of an ordering ability for develop an ordering ability evaluation guide which can evaluate objective ability of an ordering organ. Apply its evaluation sphere and element, judge a standard of an owner, thought the judgement, it can judge accurately of short ability and if it can make future oriented strategy, it can elevate the efficiency of an owner organization management.
Korean Journal of Construction Engineering and Management
/
v.17
no.2
/
pp.118-126
/
2016
International construction market have quantitatively increased and have reached up to 700 Bil. US$ through active effort of construction firms and government. In spite of this increase, substantiality issue has been constantly disputed due to qualitative problems such as lack of capability and technical shortage. To overcome these problems, many methods in performing quantitative growth and qualitative substantiality of overseas construction are being researched which showed that selection of subcontractors in general contractor is regarded as a very important success factor. However, it is difficult to make a reasonable decision for selecting the subcontractors due to the lack of evaluation standards and reliability. This study proposes an improved evaluation system through adjustment of the evaluation indicators using correlations analysis and multiple regression analysis with pre-qualification and performance evaluation of 121 firms in 6 countries.
International conference on construction engineering and project management
/
2009.05a
/
pp.144-152
/
2009
Construction contracts involve the allocation or distribution of the risks inherent to a construction project between or among contracting parties. However, it has been a common practice that only one party drafts the contract due to practical reasons and particular policies of various organizations. Interviews were conducted on some local contractors to gain their meaningful insights and standpoints on the allocation of each risk. These results were compared with the actual risk allocation using the Philippine government standard contract and risk principles from the literature to determine if their considered opinions provide a plausible alternative. A sample application of this evaluation is presented for construction-related risks and risk allocation recommendations are provided in the end.
Existing BIM(Building Information Modeling) based energy evaluation tools cannot be utilized enough for the potential performance of BIM because most of them have not provided the integrated model for energy evaluation, assessment of the material, cost of the construction, and so on. This research aims to propose and develop a new application, EcoBIM, to support an integrated evaluation of the energy and cost efficiencies of the design alternatives within the design process. The proposed application functions as a BIM-based evaluation system that calculates energy-savings performance as well as the construction cost of the alternatives at the design stage. This study mainly focuses on the possibilities of developing the proposed technology. We also suggest an advanced design process using the proposed system, corresponding to changes of national regulations in Korea. This study deduce that EcoBIM can allow architects to make suitable decisions regarding energy- and cost-efficient designs. The proposed design process will allow architects not only to check the eco-friendly performance of design alternatives but also predict the operation cost in a certain period in the future. EcoBIM can prevent large-scale design changes required to obtain environmental certification and enable the owner to make an informed decision about the initial investment of construction according to the result of the analysis of the energy requirement at the design stage.
Kim, Jonghoon;Lee, Hyun-Soo;Park, Moonseo;Park, Sanghyuk;Lee, Inbeom
Korean Journal of Construction Engineering and Management
/
v.17
no.5
/
pp.130-137
/
2016
Owner's participation on a construction project can alter the success of a construction project. In general, success of a construction project is measured by project schedule and cost decrease without considering the role an owner has in a project. As a result, this research developed a framework for the project evaluation form and after extracting a total of 9 project critical success factors (CSF) and 27 sub-CSF. AHP method was utilized to evaluate the importance factor of each CSFs. Setting a goal for each CSFs at the beginning of a project and comparing the values at the completion of the project utilizing the project evaluation form will allow a systematic evaluation and management of a project. Solution Map was introduced and Solution Tool was suggested in order to utlize the evaluation results effectively. In the future studies, various project cases needs to be supplemented for further verification and a solution based on the evaluation result needs to be developed that can be applied to construction projects.
Journal of the Korea Institute of Building Construction
/
v.11
no.4
/
pp.387-395
/
2011
In the construction of tall-building, concrete pumping influences the success of the project. In order to establish pumping technology for high speed construction of tall building, study for quantitative evaluation of flow characteristics and pumpability should be conducted. So in this study, the characteristics including the inner pipe pressure, rheological properties of concrete and mortar through the continuous pumping test were evaluated. Then we analyzed the relations between rheological properties and pumpability. In the result of test, there are high correlations between the rheological characteristics which represented by yield stress and plastic viscosity and pressure loss with pipe length. Also, we estimated pressure loss according to conditions of concrete mix and pumping through the evaluation of inner pipe friction.
Proceedings of the Computational Structural Engineering Institute Conference
/
2004.10a
/
pp.517-526
/
2004
In the resent years, the early evaluation of concrete quality, construction and maintenance has been considered as all is of major concern due to the increase of loading and the degradation of structures related with time. This paper presents evaluation of structural safety performance using measured data of construction, on the basis of a field measurements for the prevention of unreliable concrete works. Measurements analyzed in this paper are early quality condition and performance assessment, serviceability performance by cracks and deflection, rating performance by loading, durability performance by chloride attack and carbonation. Thus, a quantitative assessment model of resistance capacity was developed here to meet the requirement for deteriorated concrete structures. The model focuses on damage mechanical of concrete structures deteriorated by initial damage factors for concrete quality and environment factors such as chloride and carbonation attacks. These results could provide useful information for concrete structures interested in design, construction and maintenance.
International conference on construction engineering and project management
/
2007.03a
/
pp.563-572
/
2007
Transportation infrastructure is critical to economic growth of a country such as China. Careful evaluation of investments in traffic infrastructure projects is therefore pertinent. As traditional evaluation methods do not consider the uncertainty of future cash flows and mobility during project execution, the real option approach is gradually gaining recognition in the context of valuing construction and infrastructure projects. However, many of the cases only evaluate individual options separately although multiple options often exist in a typical large infrastructure project. Using a highway project in China as a case study, this paper first evaluates a deferment option and a growth option embedded in the project. Subsequently, the values are combined using the fuzzy analytical hierarchy process. It is found that the combined value is less than the sum of the two option values. This finding is consistent with the theoretical observations given in past real option literature despite the use of a different approach.
Goune Kang;Changki Kim;Taehoon Kim;Hunhee Cho;Kyung-In Kang
International conference on construction engineering and project management
/
2011.02a
/
pp.229-233
/
2011
Recently, the scale of buildings has been increasing because of the high-rise trend and complexity of underground spaces. A significant number of steel structures have therefore been adopted for building construction. Since workers need to work in high places to install steel beams, many industrial accidents easily occur during steel-frame work. Furthermore, considering the increasing trend of building steel structures, the safety of the workers during the steel beam erection work is of concern. To improve the safety, a new type of joint, located between the steel column and beam, which can eliminate the need for working at the elevated height during steel beam erection has been developed in Korea. Using the newly developed technology in the construction field, the safety performance needs to be evaluated. This study presented the safety evaluation approach for the newly developed technology from the literature review, and applied the method to a self-supported steel joint. The result showed that applying the self-supported steel joint improved the safety of the steel erection work in terms of working posture, working environment, and risk exposure time.
Proceedings of the Korean Institute of Building Construction Conference
/
2010.05a
/
pp.213-216
/
2010
Nowadays BIM(Building Information System) is applied to the public construction delivery system. BIM can help communications between project applicants through the extraction of the exact and prompt information. It also increases the efficiency of planning, construction, economic feasibility and maintenance in the whole project. Due to increasing demands of BIM, project evaluation and its process on the final deliverables have been in major interests. Thus, through the analysis of the current BIM project, characteristics, types and applications have been researched. We have discussed completeness, relationship and planning of BIM data, which are the standards of evaluation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.