• Title/Summary/Keyword: Construction of complex

Search Result 1,927, Processing Time 0.036 seconds

Study to Suggest Improvement Method for Increasing Efficiency of Multi-complex Design Work (복합단지 설계 업무의 효율성 향상을 위한 개선방안 연구)

  • Koo, Ja Kyung;Park, Eun Soo;Jun, Young Joon;Lee, Tai Sik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4D
    • /
    • pp.505-512
    • /
    • 2008
  • Over the past years, complex project which has the object to accomplish housing complex, commercial complex etc, recently is changing to multi-complex projects because of development in IT sector. Improvement in the quality of life, life pattern has been and is being changed, these modernized and improved version of life brings the concept of U-city. Department of urban planning and engineering, civil engineering and architecture engineering in every university educate students according to the changing world in order to handle these complex projects in real world. In most cases department of urban planning and engineering teach project planning and department of civil and architecture engineering teach project design and construction. In most of the projects planning followed by design and construction need to be accomplished, but current observation in the present curriculum shows that it is difficult to expect the continuity. The present curriculum of civil engineering has to change as complex projects deal with various different structures during the design and construction phase of these projects. This study examined curriculums from the department of urban and civil engineering related to structural design and construction and survey importance of design works which overlap urban and civil engineering targeted on design engineers. After understanding design works and results obtained from survey we propose for an advanced efficiency method.

Evaluation and Adjustment of Lateral Displacement of Complex-shaped RC Tall Buildings Considering the Displacement by Tilt Angle of Each Floor (층경사각에 의한 횡변위를 고려한 비정형 고층건물의 횡변위 평가/보정)

  • Kim, Yungon
    • Journal of the Korea Concrete Institute
    • /
    • v.27 no.5
    • /
    • pp.551-558
    • /
    • 2015
  • Lateral displacement in the most complex-shaped tall buildings is caused by eccentric gravity loads which are induced by the difference in location between a center of mass and a center of stiffness. The lateral displacements obtained from analysis, using conventional procedures, are prone to overestimate the actual values because much of realignment efforts made during construction phase are ignored. In construction sequence analysis, the self-leveling of slab and the verticality of columns/walls could be considered at each construction stage. Moreover, the displacement compensation can be achieved by manual process such as re-centering - locating to global coordinates through surveying. Because the lateral displacement increases with the building height, it is necessary to set up adjustment plan through construction stage analysis in advance in order to result in displacements less than the allowable limits. Because analytical solution includes lots of assumptions, the pre-adjusting displacement should be reasonably controlled with considerations for the uncertainty due to these assumptions.

A Study on complex waterproofing Method Using Part of Joint Watertightness Improved Sheet (접합부 수밀성 향상 시트를 이용한 복합방수 공법에 관한 연구)

  • Suh Woo-Il;Kim Su-Ryon;Kwak Kyu-Sung;Oh Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • v.y2004m10
    • /
    • pp.1-6
    • /
    • 2004
  • We ensure a flat and regular basic surface by using part of joint waterproofing improved sheet method applying the upper slab of a concrete structure. We solve the problem of getting loose scale the general sheet by waterproofing of the sheet and improving adhesive strength of the basic concrete. Also, waterproofing sheet union to problem of joint have solved using of insertion type method so that, it improved a watertightness. It has improved in resist impact, resist abrasion and it is the effect of shortened construction period and cutting down on construction expenses. Here are the special quality and superiority of this waterproofing research. (1) Level material has the super adhesive strength so that it makes the basic surface without the gab of waterproofing sheet and waterproofing layer with the string adhesive strength. (2) We unite the sheet with the joining part between sheets by waterproofing sheet joint using of method. (3) There is the effect of shortened construction period and cutting down on construction expenses without waterproofing of protection.

  • PDF

KSLV-I Assembly Complex System Design (KSLV-I 조립콤플렉스 시스템 설계)

  • Jin, Seung Bo;Park, Jung Ju
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.2 no.1
    • /
    • pp.37-41
    • /
    • 2006
  • The KSLV-I satellite launch vehicle will be launched in a space center currently under construction. The Space Center which is an advance post base of space development of Korea is located on Oenaro island in Kohung, South Cholla Province. A Ground Complex of the Space Center consists of an AC(Assembly Complex), a LC(Launch Complex), and a MCC(Mission Control Center). Assembly and test facilities are located in the AC in which stage assembly, integrated assembly, check-up, certification test, and pre-launch test are made effectively. A launch pad, fuel supply facilities, a launch control center and associated supporting facilities are located in the LC, and the MCC has control over the space center. These ground complex facilities have diverse forms of an interface with mechanical device, electric device, and etc. These should also provide optimum condition and performance during launch operation processes of the launch vehicle. This paper introduces the result of R&D for the AC of the ground complex performed during system design period.

  • PDF

Analyses of Structural Performances for RC High-Rise Residential Complex Building under Construction (철근콘크리트 초고층 주상복합 건물의 시공 중 구조성능 분석)

  • Hwang, Young-Jin;Kim, Jae-Yo
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.28 no.1
    • /
    • pp.19-27
    • /
    • 2015
  • Recently, the most of domestic high-rise residential complex buildings are constructed with reinforced concrete structures, which may bring structural problems during construction. This study is aimed to analyze structural safety and lateral load-resisting performance of RC high-rise residential complex building under construction. The tower-typed building with 60 floors is selected as a sample model, and numerical analyses are performed. The structural performances of building structures at construction stages, which are resulted form the analyses of numerical models completed up to 10th, 20th, 30th, 40th, 50th, or 60th floor, are compared to those of the completed building structure. For the comparisons of structural performances, modal shapes and fundamental periods of building structures, lateral load-resisting performances, and structural design performances of structural members are considered. The lateral displacement and story drift ratio are analyzed for lateral load-resisting performances, and comparisons of design ratios at construction and design stages are performed for structural design performances of structural members. The guideline of design loads and structural analysis schemes for checking the safety of RC high-rise building under construction is presented.

A Study on CO2 Emissions to Establish a LCI DB at the Disuse Stage (폐기단계에서 LCI DB구축을 위한 CO2 발생량에 관한 연구)

  • Choi, Doo-Sung;Park, Jin Jong;Chun, Hung Chan
    • KIEAE Journal
    • /
    • v.13 no.5
    • /
    • pp.103-110
    • /
    • 2013
  • This study aims to calculate the $CO_2$ emissions by the properties of construction waste to establish a LCI DB of construction waste generated at the disuse stage. The $CO_2$ emissions from apartment houses was calculated by calculating the energy consumptions by treatment steps to calculate the $CO_2$ emissions by the treatment steps of construction waste. As a result of analyzing the $CO_2$ emissions from a total of 27 complexes, maximum 46,791g-$CO_2/m^2$, minimum 34,893g-$CO_2/m^2$ and average 38,713g-$CO_2/m^2$ were generated, and were varied by the quantity of construction waste in general, but were affected by the transportation distance in case of transportation steps as well. As a result of analyzing the $CO_2$ emissions by the properties of construction waste, average 19,815.50g-$CO_2/m^2$ was generated, the highest, from the example complex at the demolition stage in case of construction wastes, and 1.72g-$CO_2/m^2$ was generated, the lowest, during reclamation. In case of combustible waste, average 11,495.63g-$CO_2/m^2$ was generated, the highest, from the example complex during incineration of wastes, and 21.48g-$CO_2/m^2$ was generated, the lowest, at the waste transportation stage. In case of noncombustible waste, average 522.43g-$CO_2/m^2$ was generated, the highest, from the example complex at the demolition stage, and 1.07g-$CO_2/m^2$ was generated, the lowest, at the transportation stage. In case of other construction wastes, average 645.42g-$CO_2/m^2$ was generated, the highest, from the example complex at the demolition stage, and 47.38g-$CO_2/m^2$ was generated, the lowest, at the middle treatment stage.

The Loading Mock-up test for Construction Management of Cable net Facade (케이블넷 파사드의 시공관리를 위한 하중재하 Mock-up실험)

  • Moon, Sang-Deok;Ock, Jong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.28-29
    • /
    • 2014
  • Cable net system openness and flexibility is good high and the large deflection caused no damage to the structure itself. However, cable installation, install complex systems and technologies are needed. In this study, for the basic materials of cable net construction management, cable net expert's advice and mock-up test results are summarized.

  • PDF

Applications of Construction Sequence Analyses to Prototype Models of Twisted Tall Buildings (비틀림 초고층 프로토타입 모델에 대한 시공단계해석의 적용)

  • Choe, Mi-Mi;Kim, Jae-Yo;Eom, Tae-Sung;Jang, Dong-Woon
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.26 no.1
    • /
    • pp.89-97
    • /
    • 2013
  • With regard to complex-shaped tall buildings whose plans and constructions have been gradually on the increase, this study was aimed to analyze their structural behaviors during construction by applications of construction sequences analyses to prototype models. For twisted tall buildings, total 18 models of with three conditions of a lateral load-resisting system, a twisting angle, and a construction method were selected. A diagrid system and a braced tube system were applied as a lateral load-resisting system. For each lateral load-resisting system, three types of plan with $0^{\circ}$, $1^{\circ}$, and $2^{\circ}$ twisting angles and three construction methods with construction sequences of exterior tube and interior frame were assumed. The structural performances of tall buildings under constructions were analyzed with results of lateral displacements from construction sequence analyses. Also, construction performances of the construction period and the maximum lift weight were compared.

A STUDY ON THE OPTIMAZATION OF CONSTRUCTION MANAGEMENT BY USING A DESIGN STRUCTURE MATRIX

  • Nobuyuki Suzuki;Aketo Suzuki
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.383-388
    • /
    • 2005
  • In the construction industry, complex works are carried out with significant resources under non-linear circumstances where clear concepts of project management could be of benefit to all parties and personnel involved. In this paper, we define the optimum project management configuration for construction management by using DSM (Design Structure Matrix). Furthermore DSM can be visualized as a network model, and then Graph Theory provides us the numerical results.

  • PDF

Subcontractor Evaluation Model for construction Industry Using AHP (AHP 기법을 응용한 건설업 협력업체 평가모형 개발에 관한 연구)

  • 김성수;이영훈
    • Korean Management Science Review
    • /
    • v.17 no.2
    • /
    • pp.135-150
    • /
    • 2000
  • Korean construction companies are recently facing stiff competition in free market economy, and construction projects tend to be complex and large-scale. Such an environment demands that construction companies ensure specialized subcontractors. This paper suggested a subcontractor evaluation model for selection of competent subcontractors which are equipped with operational, technical and productive ability. For designing a subcontractor model, AHP method as a group decision-marking method is applied in assigning weighting indices of evaluation elements. To verify this method, actual data collected in one of construction companies are analysed statistically.

  • PDF